Right Edible Oil Processors PLC-YY
Right Edible Oil Processors PLC-YY
HENAN HUATAI
CEREALS & OIL 50TPD Cooking oil
1 1 351,925 351,925 Selected
MACHINERY CO. Refinerry machine
LTD
HENAN HUATAI
CEREALS & OIL Oil Filling
2 1 89,978 89,978 Selected
MACHINERY CO. Production line
LTD
1.4 Boiler
Sr. Qty Unit Price Total Cost
Name of Suppliers Description Remark
No. (set) (USD) (USD)
A. Cost of Item in Foreign Currency
Xinxiang Dawn oil 4TPH electric Steam
1 1 75,617 75,617.00
Equipment Co.Ltd Boiler
Rejected
Ruian Grin & Oil
2 Air Compressor 1 1,517 1,517.00
Machinery Factory
Total Cost 77,134
2 Vehicles
4 Packing Material
Total
Sr. Size (in Unit Price
Description Supplier Units of Meas. Quantity Amount
No. lt.) (Birr)
(Birr)
1 For 1 Litter packed bekoji & digelu 1 Litter 1 2 2
2 For 3 Litter packed Mountains Spring 3 Litter 1 5 5
3 For 5 Litter packed Water PLC 5 Litter 1 9 9
5 Raw Materials
Unit Price
Sr. Unit of Unit Price VAT (15%)
Description Supplier Including VAT Remark
No. Msrt. (Birr) (Birr)
(Birr)
1 Crude Niger Seed litter 32 5 37
2 Crude lin Seed litter 30 5 35
Kelemua Oil Flitering Selected
3 Crude Cotton Seed litter 27 4 31
4 Crude Rape Seed litter 32 5 37
Right edible oil Processors PLC
Investment Cost
1 Building and Construction
Number
Ser. Total Building Executed Planned Total Cost
Description of
No. Area (m2) Value (Birr) Cost (Birr) (In Birr)
Building
Planned to be constructed
1 OIL REFINARY & LABORATORY 1 1360.00 M2 - 2,887,587 2,887,587
2 STORE 1 1350.00 M2 - 2,558,916 2,558,916
5 WATER TREATMENT BLD 1 141.12 m2 - 713,056 713,056
6 CHANGING & SHOWER 1 62.40 m2 - 382,974 382,974
Total - 6,542,532 6,542,532
Planned to be constructed in the future
1 BOTTLING & PACKING * 1 640.00 M2 - 1,509,777 1,509,777
2 OFFICE* 1 1109.62 m2 - 3,365,135 3,365,135
Total - 4,874,912 4,874,912
* The cost of Bottling & Packing house building is excluded since we assumed that the oil Refinary and Labratory room
is enough for the production process and pcking since the selected machinery is continuous and ended in refinery room.
Cost of office is also excluded and they use rental office.
2 Processing Plant
2.1 Machineries and Equipments
Planned
Ser.
Description Model Quantity Unit Value Total Value
No.
/Brand (set) (Birr) (Birr)
50TPD Cooking oil Refinerry
1 machine 1
2 Oil Filling Production line 1 13,044,671 13,044,671
Out Dorr Equipment List
3 (Compressor, Boiler, Water Pump,
Cooling Tower etc)
Total 13,044,671
5 Vehicles
Planned
Ser.
Description Unit Cost Total Cost
No. Quantity
(Birr) (Birr)
ISUZU FSR WITH BODY & GRILL
1 1 1,350,000 1,350,000
(SPONDA & SEBERA SPONDA)
2 TOYOTA HIACE MODEL 2014 1 900,000 900,000
Sub Total 2,250,000 2,250,000
Transfer fee (2%) 45,000
Total 2,295,000
Planned
Ser.
Description Existing Required Unit Price Total
No.
Quantity (Birr) Cost (Birr)
1 Computer 4 13,340.0 53,360
Right edible oil Processors PLC
Investment Cost
2 Copy Machine 1 29,842.5 29,843
3 Printer & Fax 1/1 12,198.0 12,198
4 Scanner- HP 2710 1 3,220.0 3,220
5 Desk- Executive HQ 9 3,174.0 28,566
6 Swivel- High Back 3 2,185.0 6,555
7 Swivel- High Back 6 2,012.5 12,075
8 Swivel- Secretary HQ 2 2,012.5 4,025
9 Filling Cabinet- HQ 2 3,967.5 7,935
10 Book Shelf- HQ 3 2,530.0 7,590
11 Guest Chair 12 1,897.5 22,770
12 Cash Save 2 5,290.0 10,580
Total - 198,717
7 Electric Installation
Planned Total
Ser Quantity
No
Description Installation Quantity Supply Installation
Supply
Cost (Birr) (KWh) Cost (Birr)
(KWh)
1 280 1,082,019 1,082,019
Total 1,082,019 1,082,019
8 Waterhole
-
Right Edible Oil Processors PLC
Assumptions Used In the Financial Study
Assumptions used in this study are taken from the project specific database disseminated by the Research
Process. Other cost items such as Building & Construction cost, machinery & equipment cost, office
furniture & equipments costs are taken from the bank's Civil and Mechanical Engineer's Report. Moreover, in
the absence of research reports, assumptions used by the bank to appraise other projects have been
considered.
1k of Crude & refined Oil=1.07-1.09Lt for different oil type or AVG. 1.08
http://convert-to.com/edible-cooking-oils-weight-volume-measures-conversion
1 Capacity
1.1 The Company use Bach production system
1.2 Working days per year 300 days
1.3 Number of shifts 1
1.4 Number of working
Production Estimate hours/shift
at full capacity/ 8 hrs
1.5 Production Capacity
Theoretical capacity 50 Ton/day 18,000 lit per day 2,250 lit per hour
*The production capacity is determine based on the filling machine capacity since the refine line has higher capacity.
97% Recovery
Ser. rate (crude oil Year 1 Year 2 Year 3 up to 10
Products Unit to
No.
refined oil) 60% 65% 70%
1 Refined Cotton seed Oil liter 942,840 565,704 612,846 659,988
2 Refined Rape seed Oil liter 942,840 565,704 612,846 659,988
3 Refined Niger seed Oil liter 942,840 565,704 612,846 659,988
4 Refined Linseed Oil liter 942,840 565,704 612,846 659,988
5 Safflower Seed Oil liter 942,840 565,704 612,846 659,988
6 Sesame Oil liter 942,840 565,704 612,846 659,988
Total 5,657,040 3,394,224 3,677,076 3,959,928
Ser.
Products type Year 1 Year 2 Year 3 up to 10
No.
1 Refined Cotton seed Oil 30,378,305 32,909,830 35,441,356
2 Refined Rape seed Oil 30,378,305 32,909,830 35,441,356
3 Refined Niger seed Oil 30,378,305 32,909,830 35,441,356
4 Refined Linseed Oil 30,378,305 32,909,830 35,441,356
5 Safflower Seed Oil 30,378,305 32,909,830 35,441,356
6 Sesame Oil 30,378,305 32,909,830 35,441,356
Total 182,269,829 197,458,981 212,648,134
i Refining loss 3%
ii loading/unloading loss 0.1%
Year 1 Year
Total amt. of
Refining Loss loading/unloading crude oil Pruduction Refining Loss
Ser. Pruduction (Lt) loss required/year (Lt)
No. Items 3% 0.10% (Lt) 3%
1 Refined Cotton seed Oil 565,704 16,971 566 583,241 612,846 18,385
2 Refined Rape seed Oil 565,704 16,971 566 583,241 612,846 18,385
3 Refined Niger seed Oil 565,704 16,971 566 583,241 612,846 18,385
4 Refined Linseed Oil 565,704 16,971 566 583,241 612,846 18,385
5 Safflower Seed Oil 565,704 16,971 566 583,241 612,846 18,385
6 Sesame Oil 565,704 16,971 566 583,241 612,846 18,385
Grand Total Cost 3,394,224 101,827 3,394 3,499,445 3,677,076 110,312
3.3.2. Water Requirement at Different Capacity and Total cost of Water Treatment Chemicals
Required
Price Unit of
Types of oil crude oil Types of acid rate per ton Total requirment
(birr) measurement
of soap stock
All crude oil Sulfuric acid 30 kg 6
Cotton seed crude oil kg 10
Year 1 Year 2
Clearing and sanitation chemical (disinfectant)
Caustic soda (5% concentration) 49 kg 0.125 1.67 1.81
Largo 30 Lt 0.25 3.35 3.63
Total
Source: Team survey from Addis Modjo Edible Oil Factory & research Commodity study
3.6.2 Labeling
Required rate
S. No. Description Unit of meas. Total Required Unit price/ Birr Total Cost
per plastic bottle
1 For of 1 liter Pc 1.001 0.10
2 For of 3 liter Pc 1.001 3,397,618.22 0.88 2,304,718
3 For of 5 liter Pc 1.001 1.06
Average Required rate 1.001 0.678
1
1 60% 50,400 0.5691 230.28 28,913
2
2 65% 54,600 0.5691 230.28 31,303
3
3 and then after 70% 58,800 0.5691 230.28 33,693
1 General Manager
General Manager 1 7,296 87,552
Executive Secretary 1 2,761 33,132
2 Quality Mgt. R & D
Quality Management Executive 1 5,000 60,000
3 HRM & Adm. Dept.
Sr. HRM and Administration Officer 1 4,166 49,992
General Construction Worker 1 2,500 30,000
Receptionist/Telephone Operator 1 1,500 18,000
Messenger 1 1,200 14,400
Driver IV 1 1,556 18,672
4 Finance Dept.
Finance Manager
Accounting Officer, Cost and 1 5,496 65,952
Budget 1 3,171 38,052
Right Edible Oil Processors PLC
Assumptions Used In the Financial Study
Cashier I & Customer
Marketing 1 1,556 18,672
Development
5 Customer Dept.
Development Chain
Manager 1 5,496 65,952
Sales/Marketing Representative 1 2,750 33,000
Sr. Sales Representative
Purchasing Assistant (Local & 1 3,200 38,400
Foreign) 1 1,816 21,792
Jr.CS & Internal Sales 1 1,556 18,672
Production and Technical
6 Production and Technical Dept.
Department Manager 1 5,496 65,952
Sr. Production and Technical Officer
Production Exec, Ref., Margarine, 1 4,786 57,432
bottling Plant 1 3,171 38,052
Technical Exec., Electro-Mechanical
Plant & utilities 1 3,171 38,052
Workshop 1 3,171 38,052
Operator, Solvent Extraction
Hydrogen, Ref., Bottling, 1 2,081 24,972
Margarine unit 1 2,081 24,972
Laboratory technician 1 3,171 38,052
Operator, boiler 1 2,081 24,972
Electrician 1 2,081 24,972
MechanicOperator, Hydrogen, Ref.,
Assistant 1 2,081 24,972
Bottling, Margarine
Assistant Operator, (Boiler & 1 1,556 18,672
Utility) 1 1,556 18,672
Daily Labourers 15 1,000 180,000
Guard 2 1,000 24,000
Total 46 89,503 1,254,036
* it increases by 5% per year
3.12 Insurance
Total 994,187
60,000.00
14,400.00
42,000.00
8,400.00
30,000.00
18,000.00
Right Edible Oil Processors PLC
Assumptions Used In the Financial Study
21,600.00
4,800.00
24,000.00
5,400.00
4,800.00
30,000.00
18,000.00
12,000.00
8,400.00
42,000.00
8,400.00
30,000.00
18,000.00
10,800.00
30,000.00
32,400.00
42,000.00
30,000.00
64,800.00
30,000.00
10,800.00
10,800.00
42,000.00
30,000.00
14,400.00
10,800.00
759,000.00
Total revenue
140,577
152,292
164,007
roduction &
ear3-10
Total Cost
(bir)
21,127,899
25,040,473
25,040,473
23,475,443
25,040,473
25,040,473
144,765,233
Total Cost
Total Requirment
(birr)
Ground nut
3,143
1,257 86,741
5.0 229,424 5,506,186
10.0 427,421 6,838,733
14,143 513,848
672,245 12,945,507
26 25
#REF! #REF!
Total Cost
ent
(birr)
#REF!
48 289 289 289
31 314 314 314
603 603 603
Year 3 up to
Year 3 up to 10 Year 1 Year 2
10
1.95 82 89 96
3.90 100 109 117
785 800 816
Total Cost
(Birr)
299,805
85,659
385,464
Right Edible Oil Processors PLC
Operating cost
Project Years
Description
1 2 3 4 5 6 7 8 9 10
A.Direct Cost
Local Raw Material (Crude Oil) 124,084,485 134,424,859 144,765,233 144,765,233 144,765,233 144,765,233 144,765,233 144,765,233 144,765,233 144,765,233
Refined Edibble Oil Production, Water treatment
chemicals & Soap stock splitting Chemicals 13,223,488 13,893,878 14,596,632 14,596,632 14,596,632 14,596,632 14,596,632 14,596,632 14,596,632 14,596,632
Packing Materials 16,273,972 17,087,670 17,942,054 17,942,054 17,942,054 17,942,054 17,942,054 17,942,054 17,942,054 17,942,054
Marketing costs 1,824,104 1,824,104 1,824,104 1,824,104 1,824,104 1,824,104 1,824,104 1,824,104 1,824,104 1,824,104
Electric Consumption 28,913 31,303 33,693 33,693 33,693 33,693 33,693 33,693 33,693 33,693
Sub Total 155,434,962 167,261,814 179,161,716 179,161,716 179,161,716 179,161,716 179,161,716 179,161,716 179,161,716 179,161,716
B.Indirect Costs
Land Lease Expense* - - - - - - - - - -
Wages and Salaries 1,254,036 1,316,738 1,382,575 1,451,703 1,524,289 1,600,503 1,680,528 1,764,555 1,852,782 1,945,421
Employees Medical & Insurance Benefit 125,404 131,674 138,257 145,170 152,429 160,050 168,053 176,455 185,278 194,542
Uniform & Protective(For 46 Person
Each 1200 Birr) 69,000 72,450 76,073 79,876 83,870 88,063 92,467 97,090 101,944 107,042
Telephone, Postage and Internet 36,000 37,800 39,690 41,675 43,758 45,946 48,243 50,656 53,188 55,848
Administrative Expense 60,000 63,000 66,150 69,458 72,930 76,577 80,406 84,426 88,647 93,080
Utilities 50,000 52,500 55,125 57,881 60,775 63,814 67,005 70,355 73,873 77,566
Stationary and P.T.T 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000
Travel and Perdiem 62,702 65,837 69,129 72,585 76,214 80,025 84,026 88,228 92,639 97,271
Insurance 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392
Repair and Maintenance 1,169,680 1,169,680 1,169,680 1,169,680 1,169,680 1,169,680 1,169,680 1,169,680 1,169,680 1,169,680
Spare parts 613,587 613,587 613,587 613,587 613,587 613,587 613,587 613,587 613,587 613,587
Legal & Audit Fee 25,000 26,250 27,563 28,941 30,388 31,907 33,502 35,178 36,936 38,783
Miscellaneous Expenses 60,000 63,000 66,150 69,458 72,930 76,577 80,406 84,426 88,647 93,080
Office Rental Cost 27,600 28,980 30,429 31,950 33,548 35,225 36,987 38,836 40,778 42,817
Sub Total 3,821,400 3,909,887 4,002,798 4,100,355 4,202,790 4,310,347 4,423,281 4,541,862 4,666,373 4,797,108
Total 159,256,362 171,171,701 183,164,514 183,262,071 183,364,506 183,472,063 183,584,997 183,703,578 183,828,088 183,958,824
Right Edible Oil Processors PLC
Working capital Determination
Project Years
Description Period
0 1 2 3 4 5 6 7 8 9 10
A.Direct Cost
Local
RefinedRaw Material
Edibble Oil (Crude Oil)
Production, 10 days 4,136,150 4,136,150 4,480,829 4,825,508 4,825,508 4,825,508 4,825,508 4,825,508 4,825,508 4,825,508 4,825,508
Water treatment chemicals & Soap 3 month 4,068,493 4,068,493 4,271,918 4,485,513 4,485,513 4,485,513 4,485,513 4,485,513 4,485,513 4,485,513 4,485,513
stock
Packingsplitting Chemicals
Materials 1 month 1,356,164 1,356,164 1,423,973 1,495,171 1,495,171 1,495,171 1,495,171 1,495,171 1,495,171 1,495,171 1,495,171
Marketing costs 1 month 152,009 152,009 152,009 152,009 152,009 152,009 152,009 152,009 152,009 152,009 152,009
Electric Consumption 1 month 2,409 2,409 2,609 2,808 2,808 2,808 2,808 2,808 2,808 2,808 2,808
Sub Total 9,715,225 9,715,225 10,331,336 10,961,009 10,961,009 10,961,009 10,961,009 10,961,009 10,961,009 10,961,009 10,961,009
Land Lease Expense* 1year - - - - - - - - - - -
Wages and Salaries 1 month 104,503 104,503 109,728 115,215 120,975 127,024 133,375 140,044 147,046 154,399 162,118
Employees Medical & Insurance
1 month 10,450 10,450 10,973 11,521 12,098 12,702 13,338 14,004 14,705 15,440 16,212
Benefit
Uniform & Protective(For 46
1 Year 69,000 69,000 72,450 76,073 79,876 83,870 88,063 92,467 97,090 101,944 107,042
Person Each 1200 Birr)
Telephone, Postage and Internet 1 month 3,000 3,000 3,150 3,308 3,473 3,647 3,829 4,020 4,221 4,432 4,654
Administrative Expense 1 month 5,000 5,000 5,250 5,513 5,788 6,078 6,381 6,700 7,036 7,387 7,757
Utilities 1 month 5,000 5,000 5,250 5,513 5,788 6,078 6,381 6,700 7,036 7,387 7,757
Stationary and P.T.T 1 month 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392
Travel and Perdiem 1 month 5,225 5,225 5,486 5,761 6,049 6,351 6,669 7,002 7,352 7,720 8,106
Insurance 1 Year 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392 218,392
Repair and Maintenance 6 month 584,840 584,840 584,840 584,840 584,840 584,840 584,840 584,840 584,840 584,840 584,840
Spare parts 3 month 153,397 153,397 153,397 153,397 153,397 153,397 153,397 153,397 153,397 153,397 153,397
Legal & Audit Fee 1 month 2,083 2,083 2,188 2,297 2,412 2,532 2,659 2,792 2,931 3,078 3,232
Miscellaneous Expenses 1 month 5,000 5,000 5,250 5,513 5,788 6,078 6,381 6,700 7,036 7,387 7,757
Office Rental Cost 1 month 2,300 2,300 2,415 2,536 2,663 2,796 2,935 3,082 3,236 3,398 3,568
Sub Total 1,386,582 1,386,582 1,397,160 1,408,267 1,419,929 1,432,175 1,445,032 1,458,533 1,472,709 1,487,593 1,503,222
Total 11,101,807 11,101,807 11,728,496 12,369,276 12,380,938 12,393,183 12,406,041 12,419,542 12,433,717 12,448,602 12,464,231
Incremental In Working Capital - 626,689 640,780 11,662 12,245 12,858 13,501 14,176 14,884 15,629
Existing Working Capital -
Proposed Working Capital 11,101,807
Note: Working Capital for local raw material is determined for 10 days only with the assumption that the members of the PLC will provide crude Oil in credit based sale as stated by the company.
Right Edible Oil Processors PLC
Financial Study
I. Fund Allocation
Existing
Investment Cost(In Planned Investment
Ser. No. Description
Birr) Cost(In Birr)
Balance in
Equity Amount to be Commitment To be
Disbursement Purpose of Disbursement Disbursed (In Birr) Disbursed
Plan (In Birr) to
12,123,612
Waterhole 600,944
Land Lease and
Existing 1,263,735
Compensation Fee 9,972,206 Existing
Pre-production Cost 286,727
Sub Total 2,151,406
Building and Construction Promoter/
3,271,266
(First 50% cost) Contructor
Machinery & Equipments -
Processing Plant (30% L/C 3,913,401 Supplier
1st Opening)
Disbursement Procurement of
688,500 1,017,020 Supplier
Vehicles(30%)
Electricity Installation 1,082,019 EEPCO
Sub-total 8,955,186
Building and Construction Promoter/
(First 4% cost with loan) 309,559 Contructor
Balance in
Loan Amount to be Commetment To be
Disbursement Purpose of Disbursement Disbursed (In Birr) Disbursed
Plan (in Birr) to
25,000,000
Building and Construction
Contractor/
(Second 46% cost with 2,961,707
Promoter
Equity )
Procurement of Machinaries
(refining, filling, boiler and
To the
compressor machine) 9,131,270 11,300,523
supplier
(Remaining 70% of cost of
1st Disb Machinaries)
Procurement of Vehicles
To the
(70% cost for L/C 1,606,500
supplier
settlement)
1st Disb
Sub-total 13,699,477
Working Capital for
imported raw materials (30% To the
2nd Disb 1,220,548 10,079,975
of L/C Opening for supplier
Chemicals)
Sub-total 1,220,548
Sub-total 1,587,708
Sub-total
6,984,095
Existing
May
July
Phase by phase
every four
month starting
on July
Months to
Condition for be
Disbursement Disbursed
(2015)
After verification
of the proper
utilization of the August
previous
disbursement
After verification
of the proper
utilization of the September
previous
disbursement
After verification
of the proper
utilization of the October
previous
disbursement
After verification
of the proper
utilization of the November
previous
disbursement
Right Edible Oil Processors PLC
Loan Repayment Schedule
Proejct Years
Description 1 2 3 4 5 6 7 8 9 10
Revenue 182,410,406 197,611,273 212,812,141 212,812,141 212,812,141 212,812,141 212,812,141 212,812,141 212,812,141 212,812,141
Direct Operating Costs 155,434,962 167,261,814 179,161,716 179,161,716 179,161,716 179,161,716 179,161,716 179,161,716 179,161,716 179,161,716
Indirect Operating Cost 3,821,400 3,909,887 4,002,798 4,100,355 4,202,790 4,310,347 4,423,281 4,541,862 4,666,373 4,797,108
Less Total Operating Costs 159,256,362 171,171,701 183,164,514 183,262,071 183,364,506 183,472,063 183,584,997 183,703,578 183,828,088 183,958,824
Gross profit 23,154,045 26,439,572 29,647,626 29,550,069 29,447,635 29,340,078 29,227,144 29,108,562 28,984,052 28,853,317
Less: Deprication 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730
Profit Before Interest & Tax 20,725,315 24,010,842 27,218,897 27,121,340 27,018,905 26,911,348 26,798,414 26,679,833 26,555,322 26,424,587
Less: Interest 2,361,107 1,652,773 1,298,607 944,442 550,924 177,083
Profit before tax 18,364,207 22,358,069 25,920,289 26,176,898 26,467,980 26,734,265 26,798,414 26,679,833 26,555,322 26,424,587
Less: Profit Tax (35%) 6,427,473 7,825,324 9,072,101 9,161,914 9,263,793 9,356,993 9,379,445 9,337,941 9,294,363 9,248,605
Net Profit 11,936,735 14,532,745 16,848,188 17,014,984 17,204,187 17,377,273 17,418,969 17,341,891 17,260,960 17,175,981
Right Edible Oil Processors PLC
Projected Cash Flow
Proejct Years
Description 0 1 2 3 4 5 6 7 8 9 10
Cash Inflows
Owner's Equity 12,123,612
Bank Loan 25,000,000
Net Profit 11,936,735 14,532,745 16,848,188 17,014,984 17,204,187 17,377,273 17,418,969 17,341,891 17,260,960 17,175,981
Depreciation 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730 2,428,730
Total Cash Inflows 37,123,612 14,365,465 16,961,475 19,276,918 19,443,713 19,632,917 19,806,002 19,847,699 19,770,621 19,689,689 19,604,711
Cash out Flows
Investment Costs 36,129,424
Increase In worikng Capital - 626,689 640,780 11,662 12,245 12,858 13,501 14,176 14,884 15,629
Loan Repayment 4,166,725 4,166,655 4,166,655 4,166,655 4,166,655 4,166,655
Pre-Operating Costs & Int 994,187
Dividened/Withdrwal 4,774,694 5,813,098 6,739,275 6,805,993 6,881,675 6,950,909 6,967,588 6,936,756 6,904,384 6,870,393
Replacment - - - - - 2,295,000 - - - - -
Total Cash Outflows 37,123,612 8,941,419 10,606,442 11,546,710 10,984,311 13,355,575 11,130,422 6,981,088 6,950,932 6,919,268 6,886,021
Net Cash Flow - 5,424,046 6,355,033 7,730,208 8,459,403 6,277,342 8,675,581 12,866,611 12,819,689 12,770,421 12,718,690
Cumulative Cash Balance 5,424,046 11,779,078 19,509,286 27,968,689 34,246,031 42,921,611 55,788,222 68,607,911 81,378,332 94,097,022
Retained earning 7,162,041 8,719,647 10,108,913 10,208,990 10,322,512 10,426,364 10,451,381 10,405,135 10,356,576 10,305,589
Commulative retained earning 7,162,041 15,881,688 25,990,601 36,199,591 46,522,103 56,948,467 67,399,848 77,804,983 88,161,559 98,467,147
Right Edible Oil Processors PLC
Projected Balance Sheet
Y E A R S
DESCRIPTION 0 1 2 3 4 5 6 7 8 9 10
ASSETS
CURRENT ASSETS
Cash 5,424,046 11,779,078 19,509,286 27,968,689 34,246,031 42,921,611 55,788,222 68,607,911 81,378,332 94,097,022
Inventory 11,101,807 11,101,807 11,728,496 12,369,276 12,380,938 12,393,183 12,406,041 12,419,542 12,433,717 12,448,602 12,464,231
Total Current Assets 11,101,807 16,525,852 23,507,574 31,878,562 40,349,627 46,639,214 55,327,652 68,207,764 81,041,628 93,826,934 106,561,252
FIXED ASSETS
Building and Construction 6,542,532 6,215,406 5,888,279 5,561,153 5,234,026 4,906,899 4,579,773 4,252,646 3,925,519 3,598,393 3,271,266
Machinery & Equipments -
Processing Plant 13,044,671 11,740,204 10,435,737 9,131,270 7,826,803 6,522,335 5,217,868 3,913,401 2,608,934 1,304,467 -
Vehicles 2,295,000 1,836,000 1,377,000 918,000 459,000 2,295,000 1,836,000 1,377,000 918,000 459,000 -
Office Furniture & 198,717 178,845 158,973 139,102 119,230 99,358 79,487 59,615 39,743 19,872 -
Equipments
Electricity Installation 1,082,019 973,817 865,615 757,413 649,211 541,009 432,808 324,606 216,404 108,202 -
Waterhole 600,944 540,850 480,755 420,661 360,566 300,472 240,378 180,283 120,189 60,094 -
Total Fixed Assets 23,763,883 21,485,121 19,206,360 16,927,598 14,648,836 14,665,075 12,386,313 10,107,551 7,828,790 5,550,028 3,271,266
INTANGABLE ASSETS
Land Lease and 1,263,735 1,213,186 1,162,636 1,112,087 1,061,537 1,010,988 960,439 909,889 859,340 808,790 758,241
Compensation Fee
Pre-operating cost 286,727 258,054 229,382 200,709 172,036 143,364 114,691 86,018 57,345 28,673 -
Pre-operating interest 707,460 636,714 565,968 495,222 424,476 353,730 282,984 212,238 141,492 70,746 -
Total Intangable Asset 2,257,922 2,107,954 1,957,986 1,808,018 1,658,050 1,508,082 1,358,114 1,208,145 1,058,177 908,209 758,241
Total Assets 37,123,612 40,118,928 44,671,920 50,614,178 56,656,513 62,812,370 69,072,079 79,523,460 89,928,595 100,285,171 110,590,760
LIABILITIES & Capital
Bank Loan 25,000,000 20,833,275 16,666,620 12,499,965 8,333,310 4,166,655 0.00
Sub Total 25,000,000 20,833,275 16,666,620 12,499,965 8,333,310 4,166,655 0.00 - - - -
CAPITAL
Owner's Equity 12,123,612 12,123,612 12,123,612 12,123,612 12,123,612 12,123,612 12,123,612 12,123,612 12,123,612 12,123,612 12,123,612
Retained Earnings 7,162,041 15,881,688 25,990,601 36,199,591 46,522,103 56,948,467 67,399,848 77,804,983 88,161,559 98,467,147
Sub total 12,123,612 19,285,653 28,005,300 38,114,213 48,323,203 58,645,715 69,072,079 79,523,460 89,928,595 100,285,171 110,590,760
Total Liabilities and Capital 37,123,612 40,118,928 44,671,920 50,614,178 56,656,513 62,812,370 69,072,079 79,523,460 89,928,595 100,285,171 110,590,760
- - - - - - - - - - -
Right Edible Oil Processors PLC Annex VII
Calcualtion of Financial Internal Rate of Return
V. Sensitivity Analysis
IRR
IRR Before
Description After
Tax
Tax
When Revenue decreased By 10% 16% 12%
When Operating Costs increased By 10% 24% 18%
When Investment Costs increased By 10% 64% 45%
Right Edible Oil Processors PLC
Project Implementation Plan
2015
Sr.
Type of Activiities
May
Mar
Aug
Apr
Nov
No.
Jun
Sep
Oct
Jul
1 Loan Processing
2 Errection & Installation of Machinery
3 Procurement of Vehicles
4 Building and Construction
Procurement of Machinery and
5
Equipment
6 Procurement of Imported Raw Material
7 Machinery Installation
8 Procurement of Furniture & Equipment
9 Employees recruitement and training
10 Procurement of Local Raw Material
11 Commencement of Production
Right Edible Oil Processors PLC
Loan request vs loan proposed Cost Variantion Loan Vs Plan
Variation
Requested Proposed
Ser. (Proposed -
Description Amount Amount
No. Requested
(In Birr) (In Birr)
(In Birr)
Building &
1 8,314,794 2,961,707 (5,353,087)
Construction
Machinary and
2 6,738,096 9,131,270 2,393,174
Equipment
4 - 198,717 198,717
Office Furniture &
Equipment