0% found this document useful (0 votes)
52 views1 page

Masonry Work Inspection Test Plan

Uploaded by

msss90023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

Masonry Work Inspection Test Plan

Uploaded by

msss90023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

PROJECT Name

NEW CAPITAL
INSPECTION AND TEST PLAN
MASONRY WORK

Contractor REDCON SPAIN CONTRACTING Ref.ITP NO : ITP 1


Package No. 1183 Rev. : 2
Description of Work MASONRY Date : 24-1-2021
Location ENTRADA NEW CAPITAL

Inspection Parties / Type of


Inspection
Work phase (description of Project Specification Test Method / Type Record (ICL, Test
NO Codes and Standards Acceptance Criteria Frequency ( Witness or Hold Point) Remarks
Inspection / Testing) Ref. of Inspection Report)
CONTRACTOR
MIMAR
(Q.C)

Sec04810-part 1,
1 Material approval. ASTM 140 ,1314 Sec 042000 each building Approved MIR T/H T/H
1.05

2 Mortar Proportions & Mixing ASTM C 270,476,1506 visual inspection Sec 042000 TEST RESULT v S

each floor for eah


3 CURING visual inspection S S
building

each floor for eah


4 fixed point for check level visual inspection IR H H
building

5 check line and axis IR S S

visual inspection
Application of first course of dimensional approved shop
6 IR H H
masonry and wall ties. check,alignment drawings
and plumb

In Process Wall Building visual inspection


dimensional approved shop
7 (joints,alignment,accessories, ASTM A 496 S S
Max. Hight /day work and check,alignment drawings
grouting around ties/openings) and plumb

approved shop
8 LINTEL LEVEL IR H H
drawings

approved shop
9 SILL LEVEL IR H H
drawings

visual inspection
Final Inspection of masonry
dimensional approved shop
10 work and curing BLOCK ASTM A 496 IR H H
check,alignment drawings
FILLER WITH FULL HEIGHT.
and plumb
CONSTRUCTION
DISTRIBUTION: CONSULT OTHER
MANAGER
ANT S ABBREVIATIONS : VERIFICATION CODES
SC - Subcontractor H-HOLD
C - Contractor W - WITNESS
RA - Regulatory Authority S-Surveillance
T-TEST

4.33 Inspection and Test Plan : Inspection and Test Plan