Spares For 4HMTA MEA Pumps - Hardcastle FZE
Spares For 4HMTA MEA Pumps - Hardcastle FZE
SUPPLY OF SPARES FOR 4HMTA MEA PUMPS FOR SUI PURIFICATION PLANT
MANUFACTURER DETAILS:
MFG: FLOWSERVE B.V.:P/N: 12NFV27X1-STEEL
20 05-04-104 2.00 Each 1,130.00 2,260.00
SEAL:
SHAPE: RING
Page 2 of 6
09.05.2024 01:19:44
4500116197/09.05.2024/206389
Purchase Order
Version 0
Item Material/Description Quantity UM Net Price Net Amount
APPLICATION: PUMP
TEXT:THRUST
OLD P/NO. 20A19W08
REF ITEM NO. 241B
PARENT EQUIPMENT DETAILS:
APPLICATION: 4HMTA MEA PUMP 6, 7, 8, 9 & 11
EQUIPMENT MFG: FLOWSERVE
EQUIPMENT TYPE: I/R 4HMTA-7
EQUIPMENT S/NO. 0345039
MANUFACTURER DETAILS:
MFG: Flow Solutions Group:P/N: E3090008-ZZ000
MFG: FLOWSERVE B.V.:P/N: E3090008-ZZ000
40 05-04-033 18.00 Each 126.75 2,281.50
SPRING:
APPLICATION: PUMP
MANUFACTURER DETAILS:
MFG: Flow Solutions Group:P/N: 156558223
MFG: FLOWSERVE B.V.:P/N: 156558223
50 05-04-045 6.00 Each 236.00 1,416.00
O-RING:
INSIDE DIAMETER: 6-1/2"
OUTSIDE DIAMETER: 6-7/8"
MATERIAL: NBR
APPLICATION: BAL SLEEVE TO DIFFUSER
MANUFACTURER DETAILS:
MFG: Flow Solutions Group:P/N: 20A11CM363-NM-75
MFG: FLOWSERVE B.V.:P/N: 20A11CM363-NM-75
60 05-04-049 2.00 Each 39,425.00 78,850.00
DIFFUSER:
TYPE: INTERMEDIATE STAGE
PAYMENT TERMS
==========
100% thru' Unconfirmed Irrevocable Letter of Credit at sight, in following milestones:
L/C charges inside Pakistan shall be borne by the applicant, whereas L/C charges in beneficiary country shall be borne by the
beneficiary.
HS-CODE:
SPECIAL NOTE
=========
"Commercial invoice and packing list to be place inside the cargo or attached else Pakistan Customs will impose penalty
against SRO 567"
IMPORTANT:
Please ensure that shipping documents are E-mailed to us immediately upon availability of Air ways bill i.e. before arrival of
flight to avoid Goddown rent and original documents should reach us accordingly.
(Email: [email protected]; [email protected]; [email protected];).
Please ensure that negotiable shipping documents are presented to your Bank immediately after shipment and we are advised
by E-mail the date of presentation.
DISPATCH DETAILS:
If shipment arrives at consignee's port (sea/air) but could not get cleared from Customs due to non compliance/submission of
original shipping documents, the demurrage charges/ amount incurred will be on seller's account and will be recovered from
seller's invoice.
NOTE:
Kindly therefore, let us have acceptance letter by Airmail and also communicate your acceptance by Email.
It is imperative that you indicate International Harmonized System Heading and Sub-Heading codes of the above item in your
shipping invoice, meanwhile, shall appreciate if you will please advise Harmonized Code Number, Sub-heading by Email
immediately on receipt of Purchase Order.
General Instructions
1. Packing Protection
a. Packing must be sufficiently robust to withstand rough handling during ocean shipment and up-country journey. Protection
of the plant and equipment against corrosion/ deterioration must be given special attention.
b. Machined steel and iron parts are to be heavily greased/varnished as a preventative against rust. Grease, where used
must be such that it retains its consistency, does not melt at tropical temperatures and is acid free.
c. In the case of internal combustion engines, compressors similar equipment, internal parts are to be sprayed with an
Page 5 of 6
09.05.2024 01:19:44
4500116197/09.05.2024/206389
Purchase Order
Version 0
Item Material/Description Quantity UM Net Price Net Amount
inhibitor or water splitting preservative, and all openings covered with masking tape to prevent ingress of water.
d. Box(es) packing case(s) containing electrical equipment to be waterproof lined.
e. All items are to have their respective identification letters or numbers painted on them and they must be suitably packed
to provide ease of handling and storage, and maximum protection during transport and storage periods.
f. Crates or boxes should have a list of items contained therein secured to the exterior by means of an enveloping piece of
tin sheet nailed to the wood. A duplicate list should also be included inside with the contents.
g. Items of a pilferable nature, particularly pipe fittings, should be packed in casks, not bags.
3. Shipping Specification
Shipping specifications must clearly indicate the contents, gross weight, net weight and measurements of each package.
4. Marking of goods
All goods should bear an identification mark or serial number or other marking by which that particular article can be identified
in the event of packages being landed damaged; please show these clearly on your invoice and shipping specification. If any
article of other than UK manufacture bears any wording in English the country of origin must be clearly indicated thereon.
6. Paints
All invoices must clearly indicate the brand name and flash point of paints, gross and net weights and gallonage are to be
stenciled on the containers.
7. Electrical
All electrical equipment must be suitable for use in a humid. Tropical climate and be specially treated/finished to prevent and
deterioration/corrosion. Insulation is to be non-hygroscopic and preferably vacuum dried and pressure impregnated. Substances
such as bakelite, etc. which are impervious to moisture and attack by insects must be used instead of fiber.
8. Instruments
All instruments are to be provided with plain glass and not plastic windows.
Shipments to Pakistan
2. Shipping marks
In addition to the undernoted shipping marks, we require gross weight to be stenciled on the outside of each package. To
facilitate identification in cases of shipping marks becoming obliterated, all packages where possible should have a label. Inside
the box bearing a clear impression of external marks.
Page 6 of 6
09.05.2024 01:19:44
4500116197/09.05.2024/206389
Purchase Order
Version 0
Item Material/Description Quantity UM Net Price Net Amount
The attached standard terms and conditions as Appendix-II form an integral part of this
Purchase Order unless mentioned. For Managing Director
Pakistan Petroleum Limited