100% found this document useful (2 votes)
361 views3 pages

Curbstone and Interlock

Curbstone and interlock risk assessment

Uploaded by

sadafnoor997
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
361 views3 pages

Curbstone and Interlock

Curbstone and interlock risk assessment

Uploaded by

sadafnoor997
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Risk Assessment

Risk Assessment Title Curbstone and interlock Revision: 00


TASK /
SPECIFIC LOCATION
OPERATION / TOOLS &
ACTIVITY
Curbstone and interlock EQUIPMENT IN USE:
Hand tools, forlift, power tools, boom truck, Transit mixer and plate compactor etc.
Develop sport in Alula School
DESCRIPTION:
WITH CONTROLS

PROBABILITY (P)

PROBABILITY (P)
RISK RATING

RISK RATING
SEVERITY (S)

SEVERITY (S)
Hazards identified with

RISK SCORE

RISK SCORE
Tasks Harm / Consequence /
Ser No.

each task Additional & or Site Controls


(What one does Parties affected (What can Current Controls / Safeguards (What do Responsible Person
(What can hurt one / (What additional could we do
in logical steps) happen / go wrong) we do to prevent incidents?)
others?) to reduce the risk?)

1. Construction Manager for


Site inspection by non compliance with PPE can cause All persons that are coming to the workplace either labor,
Management shall show commitment to providing PPE
1 engineers, QC, Non Compliance with PPE injury to any one on the site not wearing 3 3 9 medium managers or engineers shall comply with PPE at all time 1 3 3 Low
proof safety at site 2.Safety officer for checking the
Supervisor PPE during their stay at site.
compliance

collision with other vehicles


Damage to the property trailor/truck movement shall be controlled by flagman.
collision with property or site structures Speed limit shall be reduced to 10KM/Hr at
multiple fatality at site 4 5 20 High Route shall be designated and drop points of load shall be 2 4 8 Medium site engineer/site supervisor
site
injuries to the workers pre planned to avoid any coillision
uncontrolled movement of the
truck/trailor

load not properly tied or unbalanced load shall be properlyt tied with laches or belts.
fall of load at site
transporting material to load Make sure all belts and latches are damage free. all loads shall be checked prior to entring
2 injury to the workers near to trailor 3 4 12 High 2 3 6 Medium site engineer/site supervisor
site No workers shall be allowed to come near the trailor when the site.
property damage
Damaged latched chains or belts they are loaded with materials

obstruction to the vehicle or pedestrian


parking of trailors/trucks at All trailors/trucks shall be guided to the designated parking
routes trailors shall be kept out of site and only
undesignated area area.
injury to the workers working without 2 3 6 medium those trailors shall be allowed at site from 1 3 3 Low site engineer/site supervisor
trailors driver roaming at site without All trailors driver shall be guided to the rest shelter and shall
PPE which slabs are to be unloaded
PPE not be allowed to roam at site without PPE

forklift operator is not certified


damage to the property forklift operatior shall have 3rd part training certificate all these documents shall be checked prior
forklift does not have third party 4 5 20 High 1 5 5 Low site engineer/site supervisor
injury to the workers forklift shall have 3rd party inspection certificate entry of forklift to the site
inspection

areas shall be clearly marked for setting up forklift and


wrong positioning of the trailor/truck toppling over of the equipment positioning the trailor/trucksr for unloading.
pre task briedings and method of statement
and forklift for operation restricted view which may cause striking Activity shall be pre planned and shall be communicated with
3 5 15 High shall be communicated with whole crew 1 5 5 Low site engineer/site supervisor
worker standing on the top of forklifts of load with propery or workers both crane operator and trailor driver.
involve in the activity
using Forklift to unload forks Never stand on the top of forks.
3
the material Do not use forks for lifting workers

always use the equipmet as per manufacturer instructions


toppling over of the forklift
using wrong equipment for unloading do no overload the equipment
fall of load
using equipment beyond its lifting 3 5 15 High every unloading or lifting activity shall be pre planned and proper supervision is needed for the activity 1 5 5 Low site engineer/site supervisor
damage to the property
capacity shall be done accordingly.
multiple fatalitites at site
All lifting gears shall be properly inspected prior to use

storage not properly designated storage area shall be properly designated and signage shall
injury to the workers
area is not properly barricaded be posted. proper planning shall be done befre
4 storage of material at site striking of vehicles with the stored 2 3 6 medium 1 2 2 Low site engineer/site supervisor
storing material on the vehical or Storage shall not be made on vehicle and pdestrian routes material arriving at site
material
pedestrian routes

Vibration
Noise
Using earmuff/earplus when worker operating with plate
working around movement of
permanent hearing loss compactor proper planning shall be done befre starting
Equipment
Hand-Arm Vibration Cause Ensure that equipment is well maintained to avoid excessive work
Don,t wear the right gear
Worker injuries 4 4 16 High vibration and Limit the time spent by workers on a vibrating Wear proper PPE,s 1 4 4 4
Trip over walking backward
property damage surface Safety training shall be provide to operator
Danger of explosion 1-site engineer/site supervisor
5 isolate the area where the compactor is working by cones. before start work
using plate compactor 2-safety officer for checking the
compliance.
WITH CONTROLS

PROBABILITY (P)

PROBABILITY (P)
RISK RATING

RISK RATING
SEVERITY (S)

SEVERITY (S)
Hazards identified with

RISK SCORE

RISK SCORE
Tasks Harm / Consequence /
Ser No.
each task Additional & or Site Controls
(What one does Parties affected (What can Current Controls / Safeguards (What do Responsible Person
(What can hurt one / (What additional could we do
in logical steps) happen / go wrong) we do to prevent incidents?)
others?) to reduce the risk?)

problem in inhalation
Dust 4 4 16 High Regular morning time water sprinkler on site Dust mask shall be provide 1 4 4 4
damage to lungs and respiratory system

movement of the equipment shall be controlled with the help


bringing curbstones to the work of flagman.
location with forklift. injury to the worker by striking of All workers shall be informed warned of the equipment
4 5 20 High direct supervison is to be provided 2 5 10 Medium site engineer/site supervisor
Workers working very close to the equipment. coming closer to the work site.
equipment while carrying the load wrokers shall move away while equipment is offloading the
curbstones.

injury on hands while carryig the always wear protective gloves (leather gloves) for handling
curbstone the curbstones manually all workers shall be given TBT prior to start
manual handling of curbstones 4 5 20 High 2 5 10 medium site engineer/site supervisor
crushing of hand/ feet if curbstone slip steel toe boots shall be worn all the time to protect feet from of work.
from hand any kind of uinjury uring work

6 curbstone installation

risk of cut on hands feet while cutting use manual cutter for cutting the interlocks or curbstones
cutting of curbstones/interlocks Pre task briefing shall be conducted with
and holding the curbstones or interlocks 4 5 20 High use speed cutter for cutting the inerlocks (precast paving 2 5 10 Medium site engineer/site supervisor
(precast paving blocks) with grinder the crew,
(precast paving blocks) blocks) and curbstones.

irritation, skin damage if comes in


preparation of concrete for bed contact with wet cement always wear proper PPE (hand gloses, face mask, steel toe Pre task briefing shall be conducted with
4 5 20 High 2 5 10 Medium site engineer/site supervisor
grouting inhalation of dry cement can cause safety shoes. Hard hat) to avoid any contact with the Cement the crew,
respiratory problems.

movement of the equipment shall be controlled with the help


of flagman.
Collision with other equipment
movement of equipment using for All workers shall be informed warned of the equipment all workers shall be given TBT prior to start
7 laying granite paving. collision with other workers working 4 5 20 High 2 5 10 Medium site engineer/site supervisor
laying the granite coming closer to the work site. of work.
around
wrokers shall move away while equipment is laying the
granite and leveling it.

always wear protective gloves (leather gloves) for handling


injury on hands while carryig the block
manual handling of precast paving the curbstones manually all workers shall be given TBT prior to start
crushing of hand/ feet if block slip from 4 5 20 High 2 5 10 medium site engineer/site supervisor
concrete steel toe boots shall be worn all the time to protect feet from of work.
hand
any kind of uinjury uring work

laying precast paving


8
block

cutting of precast paving blocks with risk of cut on hands feet while cutting use manual cutter for cutting the blocks Pre task briefing shall be conducted with
4 5 20 High 2 5 10 Medium site engineer/site supervisor
grinder and holding the precast paving blocks use speed cutter for cutting the blocks the crew,

Std PPE: Head protection, Eye protection, hand protection, foot protection Additional PPE: face mask, leather gloves

PROBABILITY (P) SEVERITY Risk Rating = SEVERITY


1 Unlikely 1 First Aid or slight injury Probability x Severity 1 2 3 4 5

2 Rare 2 Recordable, medical and restricted work 1 1 - Low 2 - Low 3 Low 4 - Low 5 - Med
Probability (P)

3 Possible 3 Lost time injury or permanent disability 2 2 - Low 4 - Low 6 - Medium 8 - Medium 10 - High

4 Likely 4 Single fatality or permanent disablity of 3 or more person 3 3 Low 6 - Medium 9 - Medium 12 - High 15 - High

5 Very Likely 5 multiple fatalities 4 4 - Low 8 - Medium 12 - High 16 - High 20- High

5 5 - Medium 10 - High 15 - High 20- High 25 - High

Page 2 Safety
WITH CONTROLS

PROBABILITY (P)

PROBABILITY (P)
RISK RATING

RISK RATING
SEVERITY (S)

SEVERITY (S)
Hazards identified with

RISK SCORE

RISK SCORE
Tasks Harm / Consequence /
Ser No.

each task Additional & or Site Controls


(What one does Parties affected (What can Current Controls / Safeguards (What do Responsible Person
(What can hurt one / (What additional could we do
in logical steps) happen / go wrong) we do to prevent incidents?)
others?) to reduce the risk?)

Name Designation Date


Prepared by: Muhammad bilal HSE Engineer 10/3/2024

Reviewed by: Engr Nidal Project Manager 10/3/2024

Approved by Engr Abdullah Site Manager sign 10/3/2023