0% found this document useful (0 votes)
32 views16 pages

11 Controlplan

Uploaded by

Aditya Deb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views16 pages

11 Controlplan

Uploaded by

Aditya Deb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

CONTROL PLAN

Control Plan No. Key Contact Person


Customer Part No. ED002108638 Core Team
Part Name / Description MWC2 CRADLE Supplier Approval Date
Supplier/Plant CAMTECH Engg. Other Approval Date
CONTROL PLAN FOR

Characteristics
Process Machine, Device/ Special
Part/ Process
Name/Operation Jig/ Tools for Char.
Number
Description manufacturing Class
Product /
No Product Process Process
Specification

Classification: Public Information


Classification: Public Information
Classification: Public Information
Doc No. Rev.No. Date
Date (Original) Date Revised
Customer Engineering Approval / Date
Customer Quality Approval / Date
Rev. No. : 0
Page 1 of 1

Methods

Reaction Plan
Evaluation / Sample
Tolerance Measurement Control Method Resp
method
Qty Frequency

Classification: Public Information


Classification: Public Information
Classification: Public Information
Part/ Process
Number

10. Material
Collection

30. Groove
Grinding

40. CNC
1st Setup

Classification: Public Information


40. CNC
1st Setup

50. CNC
1st Setup

60. VMC
1st up

Classification: Public Information


70 VMC
1st up

80.0 VMC
1st up

90.0
Grinding
op.

100.Deburri
ng &
Cleaning
100.Final
Inspection

Classification: Public Information


Machine, Characteristics Methods
Process
Device/ Jig/ Special Char. Product / Evaluation /
Name/Operati Sample
Tools for No Product Process Class Process Tolerance Measurement
on Description Qty
manufacturing Specification method
Cutting
Material Machine Material Spring MTC report
1 1
Specificatio Properties Steel verification
n
Thickness ±0.04 V/C 10%
As per
Width ±0.2 V/C 10%
Pattern Drg
Length ±0.5 M/T 10%
Burr, Rusty
Visul
3 and Visually 10%
Inspection
Cleaning
4 Qrder Qty As per PO Visully 100%

Gringing Flyer Strip Fix-20-1


Machine. 1 Fixture Alighment, Fix-20-2 Visually 100%
process Fix-20-3
parameter
2 Positiong
Groove <0.15 V/C 100%
length(Dim Vernier
3 75.00 ±10 1
Pos as per Caliper
drawing)
Groove Vernier
Grinding 4 2.70 ±0.1 1
Width Caliper
Groove Vernier
5 0.60 ±0.05 1
Depth Caliper
Groove
6 0.40 Comprator 1
Roughness
Bed
7 Visually 100%
Cleaning
CNC Over all Insert
machine, length Wear, Height
Facing Turning 1 Speed, 108 ±0.3 1
(proof Gauge
tool Insert length) Feed, Jaw
CNMG 0.8, Process
Boring Bar
Insert
Ø25mm
CNMG 0.8,
TNMG 0.8 Classification: Public Information
CNC Insert
machine, Wear,
Turning Speed,
tool Insert Feed, Jaw
CNMG 0.8, Process
Boring Bar 2 Outer Dia. 180 (-0.5) Micrometer 1
OD Turning Insert
Ø25mm OD Chamfer
3 1*45 ±0.2 1
CNMG 0.8, Chamfer gauge
TNMG 0.8 Bore Dial
4 Thru Bore 99.70 (+0.025) 1
Gauge
Chamfer
5 ID Chamfer 1.5*45 1
gauge
Id Turning Vernier
6 Step ID 136.00 ±0.2 1
Caliper
Depth
7 Step ID Dept 5.00 ±0.2 1
Vernier
8 Perpandicula 0.01 Max Dial Gauge 1
CNC Insert Venier
Facing machine, 1 Total length Wear, 107 ±0.1 1
caliper
Turning Speed,
tool Insert 2 Outer Dia. Feed, Jaw 135.3 (+0.1) Micrometer 1
CNMG 0.8, Process
OD Turning Boring Bar 3 Thickness 15 (+0.1) Micrometer 1
Insert
Ø25mm OD Chamfer
4 1*45 ±0.2 1
CNMG 0.8, Chamfer gauge
TNMG 0.8 Chamfer
5 ID Chamfer 1*45 ±0.2 1
gauge
Face runout Runout
6 0.01 Max 1
wrt bore Guage
7 Face Parality 0.01 Max Micrometer 1
Id Turning
8 Step OD 140.30 (+0.1) Micrometer 1
9 Dist 25.00 ±0.2 HG 1
10 Dist 20.00 ±0.2 HG 1
11 Undercut O 133.00 ±0.2 Micrometer 1
VMC 2 Hole Drill Wear, Thread
machine, 1 Speed, M10*1 Go/ NO Go 1
Tapping gauge
Dia 8.5 & 2 holes Feed, Jaw Vernier
5.0 carbide 2 Process 155.00 ±0.1 1
PCD Caliper
drillM6*1
& ,M10*1 Vernier
3 4 holes drill 11.00 ±0.1 1
Tap, Dia Caliper
11.0 Drill, 4 Holes Vernier
4 18.00 ±0.1 1
Dia 18.0 Counter Caliper
End mill Counter Depth
Cutter 5 10.30 (+0.2) 1
Depth Vernier
Chamfer
Drilling, 4 Holes Vernier
Cutter, 6 155.00 ±0.1 1
Chamfring Locating PCD Caliper
& Tapping Fixture 4 holes
7 M6*1 TG 1
Ta[pping
TG &
Tapping
8 10.00 Min vernier 1
Depth
caliper
4 Hole tap Vernier
9 115.00 ±0.1 1
PCD Caliper

Classification: Public Information


2 Holes Vernier
10 5.00 ±0.1 1
Drill Caliper
2 holes Vernier
11 120.00 ±0.1 1
PCD Caliper
VMC 4 Hole Drill Wear, Thread
machine, 1 Speed, M6*1 Go/ NO Go 1
Tapping gauge
Dia Feed, Jaw
Drilling, TG &
5.0carbide Process
Chamfring 2 Tap Depth 10.00 Min vernier 1
drill,M6*1
& Tapping caliper
Tap,
Chamfer Digital
3 PCD 115 ±0.1 1
Cutter, Veriner
VMC Drill Wear,
machine, 2 Hole thru Speed,
Dia drilling & Feed, Jaw Thread
Drilling, 1 M6*1 Go/ NO Go 1
5.0carbide Oil cap Process gauge
Chamfring Tapping
drill,M6*1
& Tapping
Tap,
Chamfer 2 Dist 28.00 ±0.25 HG 1
Cutter, 3 Dist 76.00 ±0.25 HG 1
Gringing Wheel
Machine. 1 Bore Wear, © 100 (-0.01/-0.03) Bore Gauge 1
Speed,
2 OD Feed, Jaw © 135 (-0.01/-0.03) Micrometer 1
Process
Grinding
3 OD © 140 (-0.01/-0.03) Micrometer 1
Operation
OD & ID
4 0.01 Max Dial Gauge 1
Runout
Surface
5 Ra0.8 max Surface tester 1
Finish
Drilling, Manually Remove
Free From
Chamfring 1 Sharpe Visually 1
Burr
& Tapping Edges
Final InspectionManually
1 Bore © 100 (-0.01/-0.03) Bore Gauge 1

2 OD © 135 (-0.01/-0.03) Micrometer 1

3 OD © 140 (-0.01/-0.03) Micrometer 1


OD & ID
4 0.01 Max Dial Gauge 1
Runout
Surface
5 Ra0.8 max Surface tester 1
Finish
FREE
FROM
Visual VISUALL
6 BURR, 1
Inspection Y
DAMAGE
S & RUST

Classification: Public Information


Methods
Sample Control Reaction Plan
Resp
Frequency Method

Every Coil

Every Lot
Every Lot Incoming Rework/
Operator
Every Lot Insp.Report Reject

Every Lot

Every Lot

Every Cycle

Every Cycle
10

10
Insprocess Rework/
10 Operator
Checksheet Reject
10

Every Cycle

10

Inprocess Machine Rework/ Classification: Public Information


Insp.Report Operator Reject
10

10
Inprocess Machine Rework/
5 Insp.Report Operator Reject

Setup

5
10
10

10

10

10

5
Inprocess Machine Rework/
Insp.Report Operator Reject
5

5
10
10
5

10

10

10

10

10

10 Inprocess Machine Rework/


Insp.Report Operator Reject
10

10

10

Classification: Public Information


10

10

10

Inprocess Machine Rework/


10
Insp.Report Operator Reject

10

10
Inprocess Machine Rework/
Insp.Report Operator Reject

10
10
1

1
Incoming Machine Rework/
1
Inspection Operator Reject
1

Helper &
Viaully
1 Job Rework
Inspection
Inspector

1 Job Rework/
PDI
Inspector Reject
5

Classification: Public Information


Sr No Rev No Rev Date Revision detail
1 00 12.10.2022 Newly prepared

Classification: Public Information

You might also like