0% found this document useful (0 votes)
34 views5 pages

Secondary Beam Example

Uploaded by

kheang amg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views5 pages

Secondary Beam Example

Uploaded by

kheang amg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Project Job Ref.

Section Sheet no./rev.


1
Calc. by Date Chk'd by Date App'd by Date
P 14-Aug-24

STEEL COMPOSITE BEAM DESIGN (AISC 360)


In accordance with AISC 360-16 using the load and resistance factor design method
Tedds calculation version 1.0.16

Design summary
Overall design status; Pass
Overall design utilisation; 0.117
Description Unit Provided Required Utilization Result
Moment, constr (kip_ft) 2013.75 150.83 0.075 PASS
Shear, constr (kips) 797.07 20.11 0.025 PASS
Moment, comp (kip_ft) 2402.01 281.05 0.117 PASS
Shear, comp (kips) 797.07 37.47 0.047 PASS
Deflection, constr (in) 1.5 -1.56 -1.043 PASS
Deflection, comp (in) 1.5 -1.44 -0.961 PASS

10.000
Primary beams

Secondary beam for design

10.000

30.000

Basic dimensions
Beam span; L = 30.000 ft
Beam spacing on one side; b1 = 10.000 ft
Beam spacing on other side; b2 = 10.000 ft
Deck orientation; Deck ribs perpendicular to beam
Profiles are assumed to meet all dimensional criteria in AISC 360-16
Overall depth of slab; t = 5.000 in
Height of ribs; hr = 1.500 in
Centers of ribs; ribccs = 6.000 in
Average width of rib; wr = 2.500 in
Material properties
Concrete
Project Job Ref.

Section Sheet no./rev.


2
Calc. by Date Chk'd by Date App'd by Date
P 14-Aug-24

Specified compressive strength of concrete; f’c = 3.00 ksi


Wet density of concrete; wcw = 150 lb/ft3
Dry density of concrete; wcd = 130 lb/ft3
Modulus of elasticity of concrete; Ec = wcd1.5 × (f’c × 1 ksi) /(1 lb/ft3)1.5 = 2567 ksi
Steel
Specified minimum yield stress of steel; Fy = 50 ksi
Modulus of elasticity of steel; ES = 29000 ksi
Loading – secondary beam
Weight of slab construction stage; wslab_constr = [t – hr  (1 – wr / ribccs)]  wcw = 51.563 psf
Weight of slab composite stage; wslab_comp = [t – hr  (1 – wr / ribccs)]  wcd = 44.687 psf
Weight of steel deck; wdeck = 3.000 psf
Additional dead load; wd_add = 0.000 psf
Weight of steel beam; wbeam_s = 305.000 lb/ft
Weight of construction live load; wconstr = 20.000 psf
Superimposed dead load; wserv = 10.000 psf
Weight of wall parallel to span; ww_par = 0.000 lb/ft
Weight of wall perpendicular to span; ww_perp = 0.000 lb/ft ;assumed to be at mid-span.
Floor live load; wimp = 80.000 psf
Lightweight partition load; wpart = 10.000 psf
Total construction stage dead load; wconstr_D = [(wslab_constr+wdeck+wd_add)×((b1+b2)/2)] + wbeam_s = 850.625 lb/ft
Total construction stage live load; wconstr_L = wconstr × (b1 + b2) / 2 = 200.000 lb/ft
Total composite stage dead load(excluding walls); wcomp_D = [(wslab_comp+wdeck+wd_add+wserv)(b1+b2)/2]+wbeam_s = 881.875 lb/ft
Total composite stage live load; wcomp_L = (wimp + wpart)  (b1 + b2)/2 = 900.000 lb/ft;

Design forces – secondary beam


Max ultimate moment at construction stage; Mconstr_u = ( 1.2  wconstr_D + 1.6  wconstr_L )  L2/ 8 = 150.834 kips_ft
Max ultimate shear at construction stage; Vconstr_u = ( 1.2  wconstr_D + 1.6  wconstr_L )  L / 2 = 20.111 kips
Maximum ultimate moment at composite stage;
Mcomp_u = ( 1.2  wcomp_D + 1.6  wcomp_L )  L2/ 8 + 1.2 × ww_par × L2/8 + 1.2 × ww_perp × (b1 + b2)/2 × L/4= 281.053 kips_ft
Maximum ultimate shear at composite stage;
Vcomp_u = ( 1.2  wcomp_D + 1.6  wcomp_L )  L / 2 + 1.2  ww_par  L / 2 + 1.2  ww_perp × (b1 + b2)/2 × 1/2= 37.474 kips
Point of max. B.M. from nearest support; LBM_near = L/2 =15.00 ft
Steel section check
Trial steel section; W12X305
Plastic modulus of steel section; Zx = 537.00 in3
Elastic modulus of steel section; Sx = 435.00 in3
Width to thickness ratio; f= bf / ( 2  tf ) = 2.435
Limiting width to thickness ratio (compact); pf = 0.38  (ES / Fy) = 9.152
Limiting width to thickness ratio (noncompact); rf = (ES / Fy) = 24.083
Flange is compact
Depth to thickness ratio (h/tw); w = 5.980
Limiting depth to thickness ratio (compact); pw= 3.76  (ES / Fy) = 90.553
Limiting depth to thickness ratio (noncompact); rw= 5.70 (ES / Fy) = 137.274
Web is compact
Project Job Ref.

Section Sheet no./rev.


3
Calc. by Date Chk'd by Date App'd by Date
P 14-Aug-24

Strength check at construction stage for flexure


Check for flexure
Plastic moment for steel section; Mp = Fy Zx = 2237.500 kip_ft
Resistance factor for flexure; b = 0.90
Design flexural strength of steel section alone; Mconstr_n = b × Mp = 2013.750 kip_ft
Required flexural strength; Mconstr_u = 150.834 kip_ft
PASS - Beam bending at construction stage loading

Strength check at construction stage for shear


Web area; Aw = d × tw = 26.569 in2
Web plate buckling coefficient; kv = 5.34
Depth to thickness ratio (h/tw); w = 5.980
Web shear coefficient; Cv1 = 1.00
Resistant factor for shear; v = 1.0
Design shear strength; Vconstr_n = v × (0.6  Fy × Aw × Cv1) = 797.070 kips
Required shear strength; Vconstr_u = 20.111 kips
PASS - Beam shear at construction stage loading
Design of steel anchors
Note - for non-uniform stud layouts a higher concentration of studs should be located towards the ends of the beam
Effective slab width of composite section; b = min(L/8, b1/2) + min(L/8,b2/2) = 90.000 in
Effective area of concrete flange; Ac = b  (t – hr) = 315.00 in2
Diameter of stud anchor; dia = 0.750 in
Length of stud anchor after weld; Hs = 3.00 in
Specified tensile strength of stud anchor; Fu = 65 ksi
Cross section area of one stud anchor; Asa =   dia2 / 4 = 0.442 in2
Maximum diameter permitted; diamax = 2.5 × tf = 6.775 in
PASS - Diameter of stud anchor provided is OK
Point of max. B.M. from nearest support; LBM_near = 15.00 ft
No. of ribs from points of zero to max moment; ribnumbers = int(LBM_near /ribccs -1) = 29
No. of ribs with 1 stud per rib; Nr1 = 29
No. of ribs with 2 studs per rib; Nr2 = 0
No. of ribs with 3 studs per rib; Nr3 = 0
Total number of studs; Nprov = Nr1 + 2Nr2 + 3Nr3 = 29
Group effect factor for 1 stud per rib; Rg1 = 1.00
Group effect factor for 2 studs per rib; Rg2 = 0.85
Group effect factor for 3 studs per rib; Rg3 = 0.70
Value of emid-ht is less than 2 in (51 mm)
Position effect factor for deck perpendicular; Rp = 0.60
Nom. strength of one stud with 1 stud per rib; Qn1 = min(0.5 × Asa × (f’c × Ec) , Rg1 × Rp × Asa × Fu ) = 17.230 kips
Nom. strength of one stud with 2 studs per rib; Qn2 = min(0.5 × Asa × (f’c × Ec) , Rg2 × Rp × Asa × Fu ) = 14.645 kips
Nom. strength of one stud with 3 studs per rib; Qn3 = min(0.5 × Asa × (f’c × Ec) , Rg3 × Rp × Asa × Fu ) = 12.061 kips
Total strength of provided steel anchors; Ssc = Nr1Qn1 + 2Nr2Qn2 + 3Nr3Qn3 = 499.66 kips
Resistance of concrete flange; Ccf = 0.85 × f’c × Ac = 803.250 kips
Resistance of steel beam; Tsb = A × Fy = 4475.000 kips
Project Job Ref.

Section Sheet no./rev.


4
Calc. by Date Chk'd by Date App'd by Date
P 14-Aug-24

Beam/slab interface shear force; C = min(Ccf, Tsb) = 803.250 kips


Strength of studs is less than maximum interface shear force therefore partial composite action takes place
Strength check at partial composite action
Actual net tensile force ; Vh = C = 803.250 kips
Assuming plastic neutral axis at the bottom of the steel beam flange.
Resultant compressive force at flange bottom; Pyf = bf × tf × Fy = 1788.600 kips
Net force at steel and concrete interface; Cnet = Tsb – 2  Pyf = 897.800 kips
PNA is in the web of the I Section
Shear connection force; Fshear = Ssc = 499.66 kips
Total depth of concrete at full stress; dc = Fshear / (0.85 × f’c × b) = 2.177 in
Depth of compression from top of the steel flange; t’ = A / (2 × tw ) – bf  tf / tw - 0.85 f’c/ Fybdc / (2 × tw)+tf = 5.153 in
Tension
Bottom flange component; Fbf = Fy  bf × tf = 1788.600 kips
Moment capacity of bottom flange; Mbf = Fbf  (d – (tf /2) – t’) = 1459.561 kip_ft
Web component; Fweb_t = Fy  (A – (2 bf × tf )-(t’-tf)tw)= 698.730 kips
Moment capacity of web; Mweb_t = Fweb_t  (d –t’ - tf)/2 = 245.645 kip_ft
Compression
Web component; Fweb_c = Fy  (t’-tf)tw= 199.070 kips
Moment capacity of web; Mweb_c= Fweb_c  (t’ - tf)/2 = 20.260 kip_ft
Top flange component; Ftf = Fy  bf × tf = 1788.600 kips
Moment capacity of top flange; Mtf = Ftf  (t’– tf/2) = 566.028 kip_ft
Concrete flange component; Fcf = 0.85 × f’c × b  dc = 499.660 kips
Moment capacity of concrete flange; Mcf = Fcf  (t - dc/2 +t’) = 377.410 kip_ft
Design flexural strength of beam; Mcomp_n = b ( Mbf + Mweb_t + Mweb_c + Mtf + Mcf) = 2402.014 kip_ft
Required flexural strength; Mcomp_u = 281.053 kip_ft
PASS - Beam bending at partial composite stage
Check for shear
Design shear strength; Vcomp_n = Vconstr_n = 797.070 kips
Required shear strength; Vcomp_u = 37.474 kips
PASS - Beam shear at partial composite stage loading
Check for deflection (Commentary section I3.1)
Calculation of immediate construction stage deflection;
Deflection due to dead load; short_D = 5 × wconstr_D × L4 / (384 × ES × Ix) = 0.1506 in
Amount of beam camber; camber = 1.750 in
WARNING - The camber exceeds the construction stage dead load deflection
Deflection due to construction live load; 2 = 5 × wconstr_L × L4 / (384 × ES × Ix) = 0.0354 in
Net total construction stage deflection; short = short_D + 2 - camber = -1.564 in
For short term loading:-
Short term modular ratio; ns = ES / Ec = 11.3
Depth of neutral axis from top of concrete;
ys = [b(t-hr)/ns(t-hr)/2 + A(t+d/2)] / [b(t-hr)/ns+A]
ys = 10.442 in
Moment of inertia of fully composite section;
Project Job Ref.

Section Sheet no./rev.


5
Calc. by Date Chk'd by Date App'd by Date
P 14-Aug-24

Is = Ix + A(d/2+t-ys)2 + b(t - hr)3/(12ns) + b(t - hr)/ns  (ys - (t-hr)/2)2


Is = 6342 in4
Effective mt of inertia for partially composite; Is_eff = 0.75  [Ix + (Fshear / C)  (Is - Ix)] = ;4313.8; in4
Proportion of live load which is short term; rL_s = 67 %
Deflection due to short term live load; L_s = 5 × rL_s  wcomp_L × L4 / (384 × ES × Is_eff) = 0.0878 in
For long term loading:-
Long term concrete modulus as % of short term; rE_l = 50 %
Long term modular ratio; nl = ES / (Ec  rE_l) = 22.6
Depth of neutral axis from top of concrete;
yl = [b(t-hr)/nl(t-hr)/2 + A(t+d/2)] / [b(t-hr)/nl+A]
yl = 11.613 in
Moment of inertia of fully composite section;
Il = Ix + A(d/2+t-yl)2 + b(t - hr)3/(12nl) + b(t - hr)/nl  (yl - (t-hr)/2)2
Il = 5132 in4
Effective mt of inertia for partially composite; Il_eff = 0.75  [Ix + (Fshear / C)  (Il - Ix)] = ;3598.3; in4
Proportion of live load which is long term; rL_l = 1 - rL_s = 33 %
Deflection due to long term live load; L_l = 5 × rL_l  wcomp_L × L4 / (384 × ES × Il_eff) = 0.0519 in
Dead load due to parallel wall & superimp. dead; wD_part = ww_par + (wserv(b1+ b2) / 2) = 100.0000 lb/ft
Long term deflection due to superimposed dead load (after concrete has cured):-
Wall parallel to span and superimposed dead; 4 =5 × (wD_part) × L4 / (384 × ES × Il_eff) = 0.0175 in
Wall perpendicular to span; 5 =(ww_perp (b1+ b2) / 2) × L3 / (48 × ES × Il_eff) = 0.0000 in

Combined deflections
Net total construction stage deflection; short = short_D + 2 - camber = -1.564 in
Net total long term deflection; long = short_D + L_s + L_l + 4 + 5 - camber = -1.442 in
Combined short and long term live load deflectn; live = L_s + L_l = 0.140 in
Net long term dead and super imposed dead defln; dead = short_D +4 + 5 - camber = -1.582 in
Post composite deflection; comp = L_s + L_l + 4 + 5 = 0.157 in
Allowable max deflection; Allow = 1.500 in
PASS - Deflection less than allowable
Arrangement of steel anchor
Note - for non-uniform stud layouts a higher concentration of studs should be located towards the ends of the beam;

Location of maximum bending moment

15.000 15.000
29 ribs with 1 stud per rib Studs as other half of beam