CSCEC Inspection Checklist - Falsework Formwork
CSCEC Inspection Checklist - Falsework Formwork
中 国 建 筑 (东 南 亚) (马 来 西 亚) 有 限 公 司 EFF:21/02/2020
1.0 MATERIALS
1.1 Use of SIRIM or above approved type materials.
BOWEC Reg. 74(2).
3.6 Height of adjustable base plate shall not more than 3/4
of overall height.
MS1462-1:2012, Figure 4.
4.0 OTHERS
4.1 Identify and inform of any unsafe act/ condition during
inspection if any.
BOWEC Reg. 29(4).
COMMENTS:
Name: Name:
Position: Position:
Date: Date: