Jembatan Kali Butu (Goin-Kedi) Halbar - Ok Fix

ok

Uploaded by

Hendi Hidayat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views40 pages

Jembatan Kali Butu (Goin-Kedi) Halbar - Ok Fix

ok

Uploaded by

Hendi Hidayat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PEMERINTAH KABUPATEN HALMAHERA BARAT

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


BIDANG BINA MARGA

NAMA JEMBATAN : JEMBATAN KALIBUTU


KELAS / TYPE : KELAS A50 / RANGKA BAJA
LOKASI : KEC LOLODA

TAHUN 2022
195.0

165.0
197.3

190.0

160.0

145.0
155.0

140.0

135.0
185.0

175.0

150.0

130.0

125.0
180.0

170.0

120.0
117.3

SKALA V :
SKALA H :
:
HAL

PROFIL MEMANJANG
JUDUL GAMBAR

Nip.196502101997031001
Ir ABUBAKAR A RAJAK

GRID N:180225.000
GRID
LATITUDE: E:345100.000
1°37'48.228"
LONGITUDE: 127°36'27.11
1"
GRID N:180225.000
GRID
LATITUDE: E:345125.000
1°37'48.228"
LONGITUDE: 127°36'27.92
0"
GRID N:180225.000
GRID E:345150.000
LATITUDE:
1°37'48.229"
LONGITUDE: 127°36'28.72
9"
DISETUJUI OLEH

GRID N:180225.000
GRID
LATITUDE: E:345175.000
1°37'48.229"
LONGITUDE: 127°36'29.53
8"
PPK

118
142.545
T
111
142.322
T
110
137.332
GRID N:180200.000
T
.00
GRID
LATITUDE: E:345100.000
1°37'47.413"
LONGITUDE: 127°36'27.11
117
2"
142.564 GRID N:180200.000
1 40
0

GRID
LATITUDE: E:345125.000
T 1°37'47.414"
LONGITUDE: 127°36'27.92
0"
72
137.211
0

AS
189
.9

GRID N:180200.000
2

GRID E:345150.000
113 LATITUDE:
18

1°37'47.415"
14
LONGITUDE: 127°36'28.72
9"
142.000
0. 0 T 109 GRID N:180200.000
9.

137.111
0
GRID
LATITUDE: E:345175.000
1°37'47.415"
LONGITUDE: 127°36'29.53
T 8"
92

76
Nip.19810328201001013

136.783
R 112
136.882
T
ST

69
ST
= 0+

135.209
74
17

O
3.

136.354
91

73 71
.00
P
=

135.679 136.684
SONDIR AS
DIPERIKSA OLEH

135
FACHLIS, ST
0+

143
SS 136.000
17

t
SS
135.00 =
=
0+
16 2.
3.

70
0
77
134.844
+ 16
91

S
PPTK

2.
70
134.496
70
GRID N:180175.000
GRID
LATITUDE: E:345125.000
AS 67
1°37'46.600"
LONGITUDE: 127°36'27.92
126.249
TS =
1"
GRID N:180175.000
M
0+151
GRID E:345150.000
LATITUDE:
1°37'46.601"
LONGITUDE: 127°36'28.73
TS =
0
0+151 0"
.49
0 150
1 50 .49 68
131.172
66
126.027
GRID N:180175.000
GRID
LATITUDE: E:345175.000
1°37'46.601"
LONGITUDE: 127°36'29.53
N L
9"
.00

65
125.787
1 K
132.000 114
1 30

t 131.030
75
133.796 T
Q
132.945
0
130.0
125
128.500
t
119
124.000
0+190
8.18' @ 2.53%

t
125.00

137.200

FARID BACHMID, ST
79
125
124.013
2.531%

MUKA
5
. 00

TEAM LEADER
121.650
DIBUAT OLEH
0 T 78
.0
GRID N:180150.000
4
GRID E:345125.000
LATITUDE:
1°37'45.786"
LONGITUDE: 127°36'27.92 122.500 126.019
125
2"
T TEBING EVCE: 136.993
62 61
123.379
GRID N:180150.000
GRID
LATITUDE: E:345150.000
1°37'45.787"
80 115 124.6 49
121.700 H G
LONGITUDE: 127°36'28.73
0" 121.557
MUKA T EVCS: 0+181.74
0+180 136.993
GRID N:180150.000
GRID
LATITUDE: E:345175.000
1°37'45.787"
LONGITUDE: 127°36'29.53
63
12 1

9"
123.880
81 I
44.4179m 122.158
MUKA 64 LATITUDE:
1°37'45.788"
LONGITUDE: 127°36'30.34
.00

122.023 8"
121.0
12

J
3
120.224
0
2.

PVI STA = 0+169.24


PVI ELEV = 136.677

t 82
120.334 119.969
A.D. = -8.75%
00

A.D. = -8.753

AS
25.0000m VC
K = 2.856
K = 2.86

0+170
L = 25'

43
120.523
T
54
45 55 121.563
120.000 121.574 BM
T A
38
44 121.678
6 123.211 T
122 T
120.950 121.000 35
T t 126.445
39
124.00

1 21 121 T 0+160
123.000 121.777
125.00

.00 t T
GRID N:180125.000
GRID
LATITUDE: E:345125.000
37
125.442
1°37'44.972"
LONGITUDE: 127°36'27.92
126

2" 124
T 121.900
BVCE: 135.266
120
0
t
GRID N:180125.000
2
7.0000m 120.777 40
GRID
LATITUDE: E:345150.000
1°37'44.973"
19 LONGITUDE: 127°36'28.73
10
12 132.5 00 t 121.330
1"
ST =0
0 100
135.445
.

132.700 t T 46
11
11.01' @ 11.28%

T BVCS: 0+156.74
00

T 93 GRID N:180125.000
GRID
LATITUDE: E:345175.000 126.333
132.000 123.648 1°37'44.973"
LONGITUDE: 127°36'29.54
T
0+096
T
0"
ST = BS 90 47
122.0
00
0+096
11.284%

.96
126.871 00
GRID N:180125.000
.96
GRID
LATITUDE: E:345200.000
TS T 127°36'30.34
LONGITUDE: 1°37'44.974"
5.
94
120.758 50
9"
0+150 137.880
91
13
BS2 127.332
125
9 36123.710
TS 80 123 T 134.506
20 127.332 122.1 126.443 51
.00
134.223 14 T T t 121.993
T 131.800 13 126 T PVI ELEV = 134.024
T 131.800 122.320
.00
92
T t
SS = 0+086.96
122.190
TS 49
134
88 125.721 = 0+145.73 PVI STA
125.918 T

PEMBANGUNAN JEMBATAN KALI BUTU


SS = 0+086.96
17 TS 52
15 126.332 34 121.832
127.820 T 122.442 T 0+140
T 161 160 T

SUMURAN
126.0 00 128
6
42

PONDASI
t 124.000162 122.111 134
133.00 6.9
133.200 t 126.0t 00 48 121.662 134.024
T 127 t
+07
t 126.1 123.432
14 T
= 0
t
144
TS
121.772
26 t
2.00 76.
GRID N:180100.000
96
GRID E:345125.000
LATITUDE: 127.334 89 83
84
TS
0+0
=LONGITUDE: 1°37'44.158"
127°36'27.92
3"
T 122.441 121.861
TS AS
GRID N:180100.000
122.00

105 GRID
LATITUDE: E:345150.000 136
103 1°37'44.159"
LONGITUDE: 127°36'28.73 145125.000
131.442 131.000
2" 18 121.6 0+130
10 126.000 t 66
T P4 128.453 t 139
T GRID N:180100.000
GRID
LATITUDE: E:345175.000 121.900
T 1°37'44.159"
LONGITUDE: 127°36'29.54
0"
t 134.024
GRID N:180100.000
GRID
LATITUDE: E:345200.000
1°37'44.160"
LONGITUDE: 127°36'30.34
9"

muka air normal (man) +120.4


muka air banjir (mab) + 122.4
25
127.332
T 85
50' @ 0.00%

127.00
121.562
AS

0.000%
23
126.442 0+120

KONSULTAN PERENCANA CV. ARCHIE PLAN


T
31
24 121.886 140
4 126.882 87
134.024
4.6 8
T 121.900
159 T 32 121.986
75 t
+05
126.320 121.882 P1 121.8
t T 75
= 0 051.7
158 AS
124.900
16
ST
t 126.000

GOIN - KEDI
+ 44
= 0
T 137
126.00
64
47. 8
ST
= 0+0
54.
126.000
t
131.00

CS
116 147 146
+ 0 .5
126.000 123.2123.0 0+110
.78
T 21 00 148
050= 0 044
051
CS
= 0+ t t 123.111
GRID N:180075.000
GRID
LATITUDE: E:345125.000
1°37'43.344"
t
0 SC = 0+
LONGITUDE: 127°36'27.92
3"
05
0
134.024
1 25 .

0
GRID N:180075.000
4

2022
GRID
LATITUDE: E:345150.000
7.4
138
125.00

04 1°37'43.345"
LONGITUDE: 127°36'28.73
= 0+

TIANG PANCANG PIPA


102 SC
2"
127.000
TS
130.018 164 t
126.5163

BETON PRACETAK
P3 8
00
t 124.950 165
4.5 GRID N:180075.000
04
00

GRID
= 0+ LATITUDE: E:345175.000
t 126.500 1°37'43.345"
126.00

LONGITUDE: 127°36'29.54
TS 1"
108 t GRID N:180075.000
GRID
LATITUDE: E:345200.000
131.445 1°37'43.346"
LONGITUDE: 127°36'30.35

Ø400 MM
0

0"
T 95 0+100 130.769
125.471
.0

BJ 96
125.426
0

BJ 134.024
13

PVI ELEV = 134.024


149
125.498
t 150
129.000
t
= 0+095.73 PVI STA

TAHUN ANGGARAN
171
0+090
127.000
t 169
124.999 133.427
104 t 172
128.823 127.000
33 TITIK t
.00

RUAS JALAN
0.000%
128.565
GRID N:180050.000
GRID
LATITUDE: E:345125.000
1°37'42.530"
LONGITUDE: 127°36'27.92

T 154
128.0
17000
t 127.000
127
4"
155 167
125.443 166
128.0 t 101
168 00
125.2 GRID100
GRID N:180050.000
t t 00 125.060LONGITUDE:
t128.000
LATITUDE: E:345150.000
156 B 127.0
1°37'42.531"
127°36'28.73
3"47
128.465 t 153 A 0+080
t 127.020 14°m GRID N:180050.000

PAKET
t 11°m GRID E:345175.000
LATITUDE:
1°37'42.531"
LONGITUDE: 127°36'29.54
2"
GRID N:180050.000

132.384
GRID
LATITUDE: E:345200.000
1°37'42.532"
LONGITUDE: 127°36'30.35
0"
97 13 0
128.046
P2 .00
.00

57.39' @ 10.42%
1 30 0+070

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


131.342
0
00

PEMERINTAH KABUPATEN HALMAHERA BARAT


00
0 28 151
0 98 129.538 132.000
0
152 27 129.567T
132.000 129.535AS t
t T
0+060

6 8.2734
GRID N:180025.000
GRID
LATITUDE: E:345125.000
1°37'41.716"
LONGITUDE: 127°36'27.92
4"
GRID N:180025.000

130.300
GRID
LATITUDE: E:345150.000
1°37'41.717"
LONGITUDE: 127°36'28.73
3"
GRID N:180025.000
GRID E:345175.000
LATITUDE:
1°37'41.717"
LONGITUDE: 127°36'29.54
2"
GRID N:180025.000
GRID
LATITUDE: E:345200.000
1°37'41.718"
LONGITUDE: 127°36'30.35
1"
0+050 134.227

BIDANG BINA MARGA


4 .9 570
129.257

-9.661%
0+040
128.215
13
GRID N:180000.000
GRID
LATITUDE: E:345125.000
1°37'40.902"
LONGITUDE: 127°36'27.92

5.
5"
00
GRID N:180000.000
GRID
LATITUDE: E:345150.000
1°37'40.903"
LONGITUDE: 127°36'28.73
4"
GRID N:180000.000
GRID
LATITUDE: E:345175.000

0+030
1°37'40.903"
LONGITUDE: 127°36'29.54
3"
GRID N:180000.000
GRID
LATITUDE: E:345200.000
1°37'40.904"
LONGITUDE: 127°36'30.35
99
30
2" 127.406
29 136.443
136.6
136.442AS 25T
T
0+020
127.508

19.70' @ -9.66%

27.04 97
0+010
128.445
0+000 129.411
129.411

.\LAMBANG DAN LOGO\Lambang_Kabupaten_Halmahera_Barat - Copy.png


.\L AMBANG DAN L OG O\Lambang_ Kabupaten_ Halmahera_ Barat - Copy.p ng
195.0

165.0
197.3

190.0

160.0

145.0
155.0

140.0

135.0
185.0

175.0

150.0

130.0

125.0
180.0

170.0

120.0
117.3
= 0+095.73

= 0+145.73
PVI ELEV = 134.024

PVI ELEV = 134.024

BVCS: 0+156.74

BVCE: 135.266
000% 0.000%
PVI STA

PVI STA
11.284%

TIANG PANCANG PIPA


PONDASI
BETON PRACETAK
SUMURAN
Ø400 MM

muka air banjir (mab) + 122.4


muka air normal (man) +120.4
134.02

134.51
130.8

133.3
0+100

PAKET PEMBANGUNAN JEMBATAN KALI BUTU DIBUAT OLEH DIPERIKSA OLEH JUDUL GAMBAR HAL :
DISETUJUI OLEH
PEMERINTAH KABUPATEN HALMAHERA BARAT RUAS JALAN GOIN - KEDI PPTK PPK SKALA H :
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG TANAH & MUKA AIR
.\LAMBANG DAN LOGO\Lambang_Kabupaten_Halmahera_Barat - Copy.png
.\L AMBANG DAN L OG O\Lambang_ Kabupaten_ Halmahera_ Barat - Copy.p ng

TAHUN ANGGARAN 2022 FARID BACHMID, ST FACHLIS, ST Ir ABUBAKAR A RAJAK SKALA V :


BIDANG BINA MARGA KONSULTAN PERENCANA CV. ARCHIE PLAN TEAM LEADER Nip.19810328201001013 Nip.196502101997031001
TAMPAK SAMPING

GOIN A1 A2 KEDI
5000

TEMBOK LINING TEMBOK LINING

PLAT INJAK PLAT INJAK

500 500 500 500 500 500 500 500 500 500

590
RANGKA BAJA KELAS A BINA MARGA
BENTANGAN 50 M
400 400

TIANG PANCANG PIPA


PONDASI TIPE
BETON PRACETAK
800

SUMURAN
Ø400 MM

TAMPAK SAMPING
DENAH JEMBATAN

GOIN A1 A2 KEDI
5000

TEMBOK LINING TEMBOK LINING

PLAT INJAK PLAT INJAK

500 500 500 500 500 500 500 500 500 500
590

590
RANGKA BAJA KELAS A BINA MARGA
BENTANGAN 50 M
400 400

TIANG PANCANG PIPA PONDASI TIPE


BETON PRACETAK SUMURAN
Ø400 MM

TAMPAK SAMPING

BAJA BERGELOMBANG (STEEL DECK)


PAS. BATU
TEMBOK PENAHAN
TROTOAR PAS. BATU
TEMBOK PENAHAN

400 400
500 500

500

TROTOAR

KEDI
GOIN AS JEMBATAN

700
700

TROTOAR

250
250 250
PLAT LANTAI
PAS. BATU
PAS. BATU
TEMBOK PENAHAN
5000 TEMBOK PENAHAN

DENAH JEMBATAN
DENAH TIANG PANCANG

A1 GOIN KEDI A2

5000

100
140
140
915

915
140
140
140
100

60 140 140 60
400

400

KETERANGAN: KETERANGAN:

ABUTMEN ARAH KEDI ABUTMEN ARAH GOIN


- JENIS PONDASI : PONDASI TIPE PANCANG 8 M DENAH PONDASI - JENIS PONDASI : PONDASI SUMURAN
SKALA 1 : 100
TAMPAK RANGKA BAJA

250 48 107

PLAT INJAK

9130
9000
500

150
210

35

50 60
590

700
80

330

637
110 100 350 350 100 100

125

125
80 30

75
150
TAMPAK SAMPING

43
400

50 60
TIANG PANCANG BETON PRACETAK 110 170 170 170 170 110
Ø- MM, TEBAL - MM

700
400

330
50
110

80 30
250

LANTAI KERJA
BETON K-125
T=10 CM

178 140 140 140 140 178

9150
700

TAMPAK DEPAN

KETERANGAN:

- UKURAN DALAM CENTIMETER


- ABUTMEN BETON K.300
500
- LANTAI JEMBATAN BETON K.350
- PLAT INJAK BETON K.300
- TIANG PANCANG BETON PRATEGANG K.600
- BETON ISIAN TIANG PANCANG K.300
- TEMBOK LINING BETON CYCLOP K.175
DENAH - RANGKA BAJA BJ.50
50 150 150 50
- TIANG PANCANG BETON K.600
PENULANGAN ABUTMEN

250 48 107

125
Ø12-200
A14

6Ø12
A10
Ø12-200
A12
Ø12-400/200 6Ø12
500 A14 LS1

150
D16-200 D16-200 18
A8 A9 D16-200
A9a
11D19 D16-200
A16 LS2

90
9D19
A11
35

67
Ø12-200
A13b

60
Ø12-200
A13a

D19-200
A7

50
Ø12-400/200
A13

D25-100

700
A6

Ø12-200
550

A10

330
D25-100 D25-100
A6 A6

D19-200
A4
D19-200
D16-300 D19-200 A4
A5 A2

30
Ø12-200/400
Ø12-400/200 A13
A12 80
VAR

D22-200 D19-200
A3 A3
D22-100
A1

TIANG PANCANG PIPA BETON PRACETAK

100 140 140 140


400
PENULANGAN ABUTMEN

POTONGAN. 1
PENULANGAN ABUTMEN SKALA 1 : 50
SKALA 1 : 50
TABEL PENULANGAN

KETERANGAN
- UKURAN DALAM CENTIMETER
- BAJA TULANGAN ULIR DIA.> 12 MM : fy-240 MPa

D16-100
A9a - BAJA TULANGAN POLOS DIA. <= 12 MM : fy-240 MP a

D16-100
A9 A12
Ø12-400/200
VARIASI TULANGAN ABUTMEN (1 BH)

PANJANG JUMLAH JUMLAH BERAT


Ø PANJANG TULANGAN SATUAN
BERAT
D25-100

D25-100

TIPE BESI a b c d e kait


A6
(MM) (CM) (CM) (CM) (CM) (CM) (CM) (M) (BH) (KG/M) (KG)

A1 22 70 388 70 0 0 20.00 5.48 94 2.984 1537.0


A14 A2 19 50 158 70 158 50 20.00 5.06 48 2.226 534.9
A3 22 922 0 0 0 0 20.00 9.42 23 2.984 646.5
Ø12-200/400 A4 19 922 0 0 0 0 20.00 9.42 23 2.226 482.2
A5 16 388 0 0 0 0 20.00 4.08 32 1.577 206.1
D16-200

A6 25 50 530 0 0 0 20.00 6.00 94 3.853 2173.2


A8
A7 19 150 54 200 54 100 20.00 4.28 48 2.226 452.5
A13b
A8 16 205 67 18 60 0 19.20 3.69 47 1.577 273.499
Ø12-200 A9 16 205 0 0 0 0 19.20 2.24 47 1.577 166.027
A9a 16 205 20 205 0 0 19.20 4.49 47 1.577 332.794
A10 12 930 0 0 0 0 14.40 9.10 44 0.887 355.155
A13a A10a 690 14.40 7.04 6 0.887 37.467
12 0 0 0 0
A2
Ø12-200 A11 19 930 0 0 0 0 22.80 9.10 9 2.224 182.146

D19-100 A12 10 80 0 0 0 0 12.00 0.92 47 0.616 26.636


A13 10 70 0 0 0 0 12.00 0.82 47 0.616 23.741
A13a 10 160 0 0 0 0 12.00 1.72 47 0.616 49.797
A13b 10 205 0 0 0 0 12.00 2.17 47 0.616 62.826
A14 10 20 0 0 0 0 12.00 0.32 47 0.616 9.265
A14a 10 68 0 0 0 0 12.00 0.80 47 0.616 23.162
LSI 12 190 0 0 0 0 14.40 2.04 6 0.887 10.857
LS2 16 90 15 60 0 0 19.20 1.84 8 1.577 23.213
JUMLAH 11410.87
JUMLAH ABUTMEN 2
TOTAL BERAT BESI 22821.74
D22-100

A1
WING WALL

BACK WALL

D16-200
W3

2 Ø12-200
W1 W2

W6
2Ø12 250 ℄

30
Ø12-200 2Ø12
W5 W6

AS ABUTMEN
Ø12-200
W5 250

2D16 2D16
W4 W7 POTONGAN. 1-1
1 1 SKALA 1 : 50
Ø12-200
W1
VAR

2D16 Ø12-200
W4 W2
VAR
Ø12-200 D16-200
W1 W2 W3
D16-200
W3
495

VAR

Ø12-200
W2

322
296

282
262
125

242
221
201 KETERANGAN:
- UKURAN DALAM CENTIMETER
D16-200
W3b - BAJA TULANGAN ULIR DIA.> 12 MM : fy-320 MPa
- BAJA TULANGAN POLOS DIA. <= 12 MM : fy-240 MPa

100 140 140 140

PENULANGAN SAYAP ABUTMEN POTONGAN. 2-2


SKALA 1 : 50 SKALA 1 : 50
TABEL TULANGAN WING WALL

2D16

W4

TULANGAN SAYAP ABUTMEN (1 BH)


W5
Ø12-200
DIAMETER BERAT
PANJANG JUMLAH BERAT
BESI SATUAN
TIPE BESI
(MM) (M) (BH) (KG/M) (KG)

W1 12 6.900 13 0.887 79.564


VAR VAR

Ø12-200
Ø12-200
W2 12 5.950 13 0.887 68.609 W1 W2

W3 16 2.600 30 1.577 123.006 D16-200

W3a 16 3.550 18 1.577 100.770 W3

W3b 16 2.850 12 1.577 53.933


D16-200
W4 16 2.600 2 1.577 30.909
W3a
W5 12 1.150 12 0.887 12.241
D16-200
W6 12 2.400 2 0.887 4.258
W3b
W7 16 2.400 2 1.577 7.570

JUMLAH 480.79

JUMLAH SAYAP 4

TOTAL BERAT BESI 1923.16


PENULANGAN LANTAI

D16-200
R3
D16-200
R1

25
900

D13-100
R6
D16-100
R5

STEEL DECK
GELAGAR MEMANJANG
GELAGAR MELINTANG

637
100 700 100
TULANGAN LANTAI
DIAMETER BERAT
PANJANG JUMLAH BERAT
BESI SATUAN
TIPE BESI
D13-200
R4 (MM) (M) (BH) (KG/M) (KG)
D13-200 D16-200 R1 16 11.030 251 1.577 4365.97
R2 R3
D16-200 PIPA UTILITAS Ø 15 CM R2 13 1.600 251 1.041 418.07
R1
R3 16 50.600 92 1.577 7341.25
R4 13 50.620 16 1.041 843.13

R5 16 11.120 501 1.577 8848.86


D16-100
R5 R6 13 0.560 6012 1.041 3504.76

JUMLAH 25322.04

KETERANGAN:
- UKURAN DALAM CENTIMETER
- BAJA TULANGAN ULIR DIA.> 12 MM : fy-320 MPa
- BAJA TULANGAN POLOS DIA. <= 12 MM : fy-240 MPa

PENULANGAN LANTAI JEMBATAN


SKALA 1 : 50
DETAIL TIANG
PANCANG

STEK TULANGAN 7D16[TP-2]


BETON ISIAN
SPIRAL Ø8-150[TP-1]
TIANG K.300

SPIRALØ8-150[TP-1]
BAJA PRATEGANG (TYP)

7D16[TP-2]
TIANG PANCANG BETON
PRATEGANG PRACETAK
DIA.40 CM b

POTONGAN 1
SKALA 1 : 10

JOIN PLATE

60
STEEL BAND

3
WEL DED

3
PC WIRE

60
STEK TIANG
MIN.50 CM BAJA PRATEGANG (PC WIRE)
SPIRAL
DIMUNCULKAN SEBAGAI STEK MIN.40 CM
DARI BATAS PEMOTONGAN UJUNG TIANG
50

7D16 DETAIL PENYAMBUNG TIANG


SKALA 1 : 5
BETON K.300 BATAS PEMOTONGAN UJUNG TIANG
7D16 [TP-2]
SPIRALØ8-15 [TP-1]
KETERANGAN
- UKURAN DALAM CENTIMETER
- BAJA TULANGAN ULIR DIA.> 12 MM : fy-240 MPa
1
- BAJA TULANGAN POLOS DIA. <= 12 MM : fy-240 MP a

PASIR PASANG
TULANGAN ISI TIANG PANCANG
PANJANG JUMLAH JUMLAH BERAT
Ø PANJANG TULANGAN SATUAN
BERAT
TIPE BESI a b c d e kait

(MM) (CM) (CM) (CM) (CM) (CM) (CM) (M) (BH) (KG/M) (KG)

DETAIL PENULANGAN ISIAN TIANG PANCANG TP-1 8 820 0 0 0 0 10.00 8.38 1 0.394 3.305
SKALA 1 : 50 TP-2 16 30 165 0 0 0 16.00 2.27 7 1.577 25.066
JUMLAH 28.371
JUMLAH TIANG PANCANG 42
JUMLAH 1191.575
PLAT INJAK

500

D19-100
S3

D13-100
S2

30

35
D13-100
D13-100
D19-100
S2

S2
S1
500

TIMBUNAN PILIHAN

S3
POTONGAN 1-1
D19-100 SKALA 1 : 50
D19-100
S1
900

1 1

KETERANGAN
- UKURAN DALAM CENTIMETER
- BAJA TULANGAN ULIR DIA.> 12 MM : fy-240 MPa
- BAJA TULANGAN POLOS DIA. <= 12 MM : fy-240 MP a

TULANGAN PLAT INJAK


PANJANG JUMLAH JUMLAH BERAT
Ø PANJANG TULANGAN SATUAN
BERAT
TIPE BESI a b c d e kait

(MM) (CM) (CM) (CM) (CM) (CM) (CM) (M) (BH) (KG/M) (KG)

S1 19 490.00 0 0 0 0 19.00 5.09 70 2.224 792.583


50

S2 13 690.00 0 0 0 0 13.00 7.03 100 1.041 732.089


S3 19 18.50 15 490.00 15 18.50 19.00 5.76 70 2.224 896.911
250 JUMLAH 2421.583
JUMLAH PLAT INJAK 2
TOTAL BERAT BESI 4843.166
PENULANGAN PLAT INJAK
SKALA 1 : 50
DETAIL PANCANG

12D25
T1

Ø8-150
T2
SPIRAL
930

PENGAKU TIANG
PROFIL C.200X75
PENGAKU TIANG
PROFIL C.200X75
STEK TIANG
MIN. 30 CM
T1
12D25

20 30
LANTAI KERJA
Ø8-150 BETON K.125
T2
SPIRAL
T=20 CM

TIANG PANCANG PIPA BAJA


DIAMETER 450 MM, T=12 MM
BETON ISI TIANG
K.300
400 L=8 M
ISIAN TIANG PANCANG (1 BH)
400

DIAMETER BERAT
PANJANG JUMLAH BERAT
BESI SATUAN
TIPE BESI
KETERANGAN:
- UKURAN DALAM CENTIMETER (MM) (M) (BH) (KG/M) (KG)
- BAJA TULANGAN ULIR DIA.> 12 MM : fy-320 MPa
- BAJA TULANGAN POLOS DIA. <= 12 MM : fy-240 MPa
T1 22 8.50 12 2.982 304.206

T2 8 75 1 0.394 29.578

JUMLAH 333.783
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :

-UKURAN DIMENSI/JARAK DALAM mm KECUALI DISEBUTKAN LAIN


-REFRENSI DARI DIREKTORAT JENDERAL BINA MARGA
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :

G B C G E
2 PENGAKU 2 PENGAKU 2 PENGAKU 2 PENGAKU
700X700X10 700X700X10 700X700X10 700X700X10

88.75
300

G B H 450X200 (YP)
C
35
L 60X60X6
G L 60X60X6

L 60X60X6

PLAT PENGISI 40X40X18

GELAGAR MELINTANG UJUNG (GMJ) 8 LUBANG Ø 18

BAUT M 16X65 (4.60)


2 PENGAKU BAUT M 16X65 (4.60) 2 PENGAKU 2 PENGAKU
LUBANG Ø 18 (TYP)
700X700X10 LUBANG Ø 18 (TYP) 700X700X10 700X700X10

150
330
150 130
10
8 PENGAKU 235X150X10
H H
125 125 BADAN T:18MM 6 MM BADAN T:18MM

6 LUBANG Ø 18
PENEMBUSAN
DENGAN CARA DILAS
F F PENEMBUSAN
DENGAN CARA DILAS
6 LUBANG Ø 18 GELAGAR MELINTANG UJUNG (GMJ)
DARI DETAIL.2 PLAT BUHUL DARI DETAIL.2 PLAT BUHUL

12 LUBANG Ø 26

6 MM (TYP)

85
330
160
DEK BAJA GELOMBANG 330
8 MM
400
8 PENGAKU 235X150X10

85
52.25 52.25
66.75 45 45 66.75

25
50 50 50 50 50 50 50 50 50 45 25

25
5 MM 5 MM 10 MM
8 MM
10 MM
150

25

55
2L 120X120X10 T:15 MM
35 40 40 40 40 40 40 40 40 40
35 40 40 40 40 40 40 40 40 40

750
700

750
700
750

25 2 PENGAKU 2 PENGAKU
360

930

700X700X10
360

6 MM 700X700X10
25

(TYP)
750
700

147

BAUT M-24X65(10.9) 6 MM 6 MM
BAUT M-24X65(10.9) 8 LUBANG Ø 26 (TYP) (TYP)
42 83 83 42
10 8 LUBANG Ø 26 BAUT M-24X65(10.9)
166

25
42 68

25
H 450X200 (TYP) 2L 120X120X10 125
BAUT M-24X65(10.9) 4 LUBANG Ø 26
77

GELAGAR MELINTANG UJUNG (TYP) 4 LUBANG Ø 26


10 GELAGAR MELINTANG UJUNG (TYP) 65 60 100 60 65
25

400 400

-UKURAN DIMENSI/JARAK DALAM mm KECUALI DISEBUTKAN LAIN


-REFRENSI DARI DIREKTORAT JENDERAL BINA MARGA
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :

A
1700

C G
40 55

B C
25 35

1100

40 55

125 125

8 LUBANG Ø 26

360 GELAGAR MELINTANG TENGAH (GMT)


DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :

PIPA SANDARAN L=4993MM

PIPA SANDARAN L=4993MM


DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :

RING 2

MUR

7MM

15

C C

560
335 335

20
D

DETAIL 2

B E E

D
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :

M-24

M-16

29.56
M-16
M-24

M-16
27.0

M-12
M-24

M-20

M-25
M-24

500

615

M-12

21.9
M-24

M-16
17.5

30.0
DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :

B A C

B A C

50
DECK SEAL
LUBANG 0 12 UNTUK DIPASANG
DIATAS KAYU

-REFRENSI DARI DIREKTORAT JENDERAL BINA MARGA


DiBuat Oleh Diperiksa oleh DiSetujui oleh

Nama Jembatan JEMBATAN KALI BUTU Team leader PPTK Pejabat Pembuat Komitmen Judul Gambar : Gambar No :
PERENCANAAN JEMBATAN Provinsi/Kabupaten HALMAHERA BARAT
Skala :
KALI BUTU Tahun Anggaran 2022
Farid Bachmid, ST FACHLIS, ST Ir ABUBAKAR A RAJAK
Konsultan Perencana CV. ARCHIE PLAN Leader Nip.19810328201001013 Nip.196502101997031001 Tanggal :

R E P U B L I K I N D O N E S I A
KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA

NAMA JEMBATAN : KALI BUTU

NOMOR JEMBATAN :-

KM : 13 + 100

KOORDINAT : N : 01° 37' 44.03", E : 127° 36' 26.76"

TAHUN ANGGARAN 2018

R E P U B L I K I N D O N E S I A
KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA

NAMA JEMBATAN : KALI BUTU PARAPET


NOMOR JEMBATAN :-

KM : 13 + 100

KOORDINAT : N : 01° 37' 44.03", E : 127° 36' 26.76"

TAHUN ANGGARAN 2024

-MUTU BETON :
-PARAPET Fc'20Mpa
TABEL BERAT
PROFIL JEMBATAN

DAFTAR KUANTITAS/ BERAT JEMBATAN RANGKA A 50


Kelas A : Lebar jembatan 7,0 m; Trotoar 2 x 1,0 m; Vertical clearance 5,10 m
Daftar berat rangka batang Lantai jembatan beton bertulang

Dimensi Panjang Total Dimensi Panjang Total Panjang Lebar Tebal (cm)
Frame Profil Berat Frame Profil Berat No Volume Berat
(mm) (cm) (kg/m) (kg) (mm) (cm) (kg/m) (kg) (m) (m) tepi tengah (m3) (kg)
No No rata-rata
1 BSB 1 350x350-12/22 4,996 150,54 752,1 20 BSD 1 350x350-16/22 6,700 160,2 1.073,3 1 50 7 22 29 25,5 89,25 214,20
2 BSB 2 350x350-12/22 4,996 150,54 752,1 21 BSD 2 350x350-12/19 6,700 134,9 903,8 Total 214,20
3 BSB 3 350x350-12/22 4,996 150,54 752,1 22 BSD 3 350x350-12/19 6,700 134,9 903,8
4 BSB 4 350x350-12/22 4,996 150,54 752,1 23 BSD 4 350x350-12/19 6,700 134,9 903,8 Trotoar jembatan beton bertulang

5 BSB 5 350x350-12/22 4,996 150,54 752,1 24 BSD 5 350x350-12/19 6,700 134,9 903,8 Panjang Lebar Tebal Volume Berat
No
4,996 150,54 752,1 6,700 89,6 600,3 (m) (m) (cm) (m3) (kg)
6 BSB 6 350x350-12/22 25 BSD 6 350x350-9/12
7 BSB 7 350x350-12/22 4,996 150,54 752,1 26 BSD 7 350x350-9/14 6,700 100,3 672,0 1 50 2 52 52 124,80
8 BSB 8 350x350-12/22 4,996 150,54 752,1 27 BSD 8 350x350-9/12 6,700 89,6 600,3 Total 124,80
9 BSB 9 350x350-12/22 4,996 150,54 752,1 28 BSD 9 350x350-9/12 6,700 89,6 600,3
10 BSB 10 350x350-12/22 4,996 150,54 752,1 29 BSD 10 350x350-9/12 6,700 89,6 600,3 Trapezoid steel sheets

11 BSA 1 350x350-16/22 4,996 160,2 800,4 30 BSD 11 350x350-9/12 6,700 89,6 600,3 Panjang Lebar Berat Total
No
4,996 160,2 800,4 6,700 89,6 600,3 (m) (m) (kg) (kg)
12 BSA 2 350x350-16/22 31 BSD 12 350x350-9/12
13 BSA 3 350x350-16/32 4,996 212,93 1.063,8 32 BSD 13 350x350-9/12 6,700 89,6 600,3 1 50 9,13 51,26 23.400
14 BSA 4 350x350-16/32 4,996 212,93 1.063,8 33 BSD 14 350x350-9/14 6,700 100,3 672,0 Total 23.400
15 BSA 5 350x350-16/32 4,996 212,93 1.063,8 34 BSD 15 350x350-9/12 6,700 89,6 600,3
16 BSA 6 350x350-16/32 4,996 212,93 1.063,8 35 BSD 16 350x350-12/19 6,700 134,9 903,8 Overlay Aspal

17 BSA 7 350x350-16/32 4,996 212,93 1.063,8 36 BSD 17 350x350-12/20 6,700 134,9 903,8 Panjang Lebar Tebal Volume Berat
No (m) (m) (cm) (m3) (kg)
18 BSA 8 350x350-16/22 4,996 160,2 800,4 37 BSD 18 350x350-12/21 6,700 134,9 903,8
19 BSA 9 350x350-16/22 4,996 160,2 800,4 38 BSD 19 350x350-12/22 6,700 134,9 903,8 1 50 7 5 17,5 40,25
39 BSD 20 350x350-16/22 6,700 160,2 1.073,3 Total 40,25
Sub Total 16.041,41 Sub Total 15.523,90
Total 31.565,31

Rangka batang untuk deck (lantai jembatan)

Dimensi Jumlah Panjang Berat Total


Frame Profil (mm) (bh) (cm) (kg/m) (kg)
No
1 GMT 900x350-12/9 9 9,13 186,63 15.335,4
2 GP 450x200-9/16 50 4,877 80,39 19.603,1 Berat total bangunan atas jembatan rangka baja

3 GMU 750x350-12/25 2 9,13 204,42 3.732,7 Berat


No Komponen utama jembatan
Total 38.671,2 (ton)

I Jembatan Rangka Baja

1 Rangka baja batang samping 63,13


Rangka batang untuk top bracing (ikatan angin) 2 Rangka baja batang lantai jembatan 38,67

Frame Dimensi Total 3 Rangka baja batang ikatan angin 6,71


Profil Jumlah Panjang Berat
No (mm) (bh) (cm) (kg/m) (kg) 5,06
4 hendrail
1 BIU 300x200-12/19 2 9,13 84,8 1.548,4 5 Baut 4,30
2 BIA 150x150-6/9 18 10,408 27,56 5.163,2 6 Plat buhu dll 15,20
Total 6.711,6 Sub total 133,07
II Lantai dan trotoar jembatan

1 Lantai jembatan beton bertulang 0,21


Handrail 2 Trotoar jembatan beton bertulang 0,12

Frame Dimensi Jumlah Panjang Berat Total 3 Trapezoid steel sheets 23,40
Profil
No (mm) (bh) (cm) (kg/m) (kg) Overlay aspal
4 0,04
1 Kanal 200x75 4 50 25,3 5.060,0 Sub total 23,78
Total 5.060,0 Total 156,85
LINING JEMBATAN

250 110

5 240 5 5 100 5

5 10 5
75
125

125
5
25
WING WALL WING WALL

TAMPAK DEPAN TAMPAK SAMPING

250
5 240 5

5
50

100
110
5

KETERANGAN:

5 40 5 - LINING BETON CYCLOP K.175


200 50

DENAH