Risk based testing is to carry out testing or to design and execute the scenarios,
such that the top business risks which will have a negative impact on the business
as identified by the customer are unearthed in their product or feature early in the
life cycle and are mitigated by implementing mitigation measures.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 1/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
EXPLORE MORE
Most Popular OWASP
Vulnerabilities in
Try Now Web Applications...
15:39
Python Introduction
and Installation
(Tutorial # 1)
12:31
Analyze the
Importance of
Mocking in Spock...
Skip Ad 14:58
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 2/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
The negative impact can include cost impact, dissatisfied customer, bad user experience, and even to the extent of losing the
customers.
In other words, the RBT approach is to ensure that, testing is done in such a way that even if a user finds a bug in the
production, that does not stop him/her from using the software or does not impact the business in a serious way.
RBT is testing carried out based on product risks. RBT is to find out well in advance, as what is the risk of the failure of a
particular feature or functionality in the production and its impact on the business in terms of cost and other damages by
using a prioritization technique for the test cases.
Hence, Risk-Based testing uses the principle of prioritizing the tests of the features, modules, and functionalities of a product
or software. The prioritization is based on the risk of the likelihood of failure of that feature or functionality in production and
its impact on the customers.
This, in turn, can ruin the purpose of the whole product with no other option but just to withdraw it from the market. And that
is the significance and need for ‘Quality testing’.
With the rapid growth in technology, the software is hosted on the cloud supporting multiple OS, multiple platforms, complex
IT infrastructures, etc., the end-users are becoming more and more fussy about the features, options and they never
compromise for customer satisfaction.
Nowadays, ‘Quality’ is becoming a crucial factor in software delivery, where continuous improvements are happening to
improve the quality in order to keep the customers happy.
We often notice that it is a common problem for almost all the Testers to be under tremendous pressure that their testing
window is squeezed and typically the build is handed over to them for testing at the last minute. There is no enough time and
resources for them to run all the tests that they have designed and the automation coverage is not always 100% and it has its
own challenges.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 4/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
The delivery timeline cannot be missed and at the same time quality cannot be compromised as well. Whatever the plan B, to
add additional test resources by pulling out from the other teams, is not working out, Plan C, stop doing all the other activities
and divert the effort to this alone, is not really helping. However much addition of test resources, in the end, is not working
out.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 5/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
There is no other option but just to run limited and important tests within the available time and resources.
So, how do we decide which test is important at this stage? Whatever a Tester considers important may not be really
important for the customers. From whose perspective is the importance of the feature or a functionality decided? Who will
decide which are the important tests? And a lot of other questions keep arising.
In order to answer all these questions and to handle the above situation effectively, a testing approach called ‘Risk-Based
Testing’, shortly called ‘RBT’, came into existence, where the team has clearly planned and identified the test scenarios based
on the ‘Project Risk’ criteria.
Though the QA team has a clear picture of the important tests, RBT is a proven method of identifying the crucial and important
tests from the customer and business perspective through a ‘Risk Analysis’ procedure.
So, now as against the traditional way of simply identifying the defects in the software, the QA approach and goal has changed
with the time due to the change in the technology, increase in the competition in the market to release a quality software,
introduction of ‘Automate Everything’, and in totality introduction of Agile and DevOps practice of delivering the software over a
period of few hours.
Hence, the current trend of ‘Testing Principle’ is not just merely ‘identifying the defects’ but to also,
#1) Focus on the area of the product where there is a high impact on business due to failure or high likelihood of failure in the
production.
#2) Focusing on identifying the defects early and allowing a team to fix it as early as possible and hence allowing the
software/product or feature to ‘Fail Fast’.
#3) The most important aspect of Service of the QA team now is to focus on the customer in bringing value to the customer by
increasing the focus on ‘end to end customer experience’.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 6/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
There is a point at which software stability is not going to be doubly assured by increasing the number of test cases alone. At
this point in time, it is not just to focus upon the number of tests but on what actually the customer is expecting from the
release.
Hence, it is essential to strike a balance in optimizing the testing in order to get the maximum benefit with the reasonable
effort of testing. And this is more important when the testing timelines are very tight and enough resources are not available to
carry out sufficient testing.
Thus, in this case, the RBT approach plays a key role in optimizing the QA effort and maximizing the testing benefit with the
minimum business risk.
So, if we focus on the above aspect, then the work of a QA will be much relieved. They do not have to burn their weekends in
the office, continuously testing the software and getting worried about every S4 (Severity 4) and P4 (Priority 4) defects that
come out of the testing.
Well, 4 is considered as the lowest priority and severity of the defects in testing. They can better invest their time in other
useful aspects of the project.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 7/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
RBT approach can be used whenever there is a limitation or constraint on Time, cost and resources of a project and
whenever there is a need to optimize the resources.
RBT approach is used when the program is more complex and adapts new technology and hence involves a lot of
challenges.
When the program is an R&D project and it is of a first kind type and there is a number of unknowns and risks in the
project.
Several Risk-Based analysis approaches are used in the IT industry to overcome the risks faced by production and its impact.
This approach of RBT includes identifying the ‘Vital Functionalities or Key Features’ of the product and assessing the risks to
which each of these functionalities get exposed to in the production and implementing appropriate mitigation measures in
place to lower or mitigate the risk.
Hence the RBT approach includes testing the functionalities which have the probability of failure and the highest impact on
business. The types of failures could be operational or business, technical, external, etc.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 8/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Risk analysis can be carried out on various project items to identify the risks and to implement an RBT approach for analysis.
Those items include,
Features
Functionalities
User Stories
Requirements
Use Cases
Test Cases
In this case, let us focus only on Test cases to understand the Risk-Based Testing approach implementation.
Brainstorming sessions involving these stakeholders would be organized to carry out the discussion to identify the importance
of each feature of a product and prioritize them based on the risk of failure and its impact on the end-users in production.
Various ‘Project Documents’ such as Requirements Document, Technical Specification Documents, Architecture and Design
Documents, Business Process Document, Use Case Document, etc., will become the input for the brainstorming session.
Stakeholder’s knowledge about the product and the existing product in the market will also be an input factor for the
discussion.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 9/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
During the brainstorming session, the risks pertaining to each of these features are identified. The types of risks could be an
operation, technical or business-related. The tests and scenarios related to them are weighted and risk values are assessed
based on the likelihood of risk occurrence and impact of the risk.
The ‘Likelihood of risk occurrence’ can be due to:
The ‘Impact of the Risk’ is the effect of failure to the users and business if it occurs. The impact could be,
The focus area of assessing the risk of a feature or product can be,
The Risk-Based testing approach uses RISK as the criteria at all test phases of the testing cycle, i.e., test planning, test design,
test implementation, test execution, and test reporting. Ideally, one can design a numerous number of possible test scenario
combinations.
Hence, the RBT approach includes a ranking of the tests based on the severity of the risks to find out the most defective or
risky area of failure, which causes a high impact on the business.
The main objective of Risk analysis is to distinguish between the ‘High value’ items like product features, functionalities,
requirements, user stories, and test cases, and ‘Low Value’ ones and hence later to more focus on ‘High value’ Test Cases, by
less focusing on ‘Low value’ Test Cases. This is the initial step of Risk analysis before starting the Risk-Based testing.
The main task of Categorization or grouping of Test Cases into High Value & Low Value and assigning the priority value to each
of these test cases includes the following steps:
Risk analysis is performed using a 3X3 grid, where each functionality, non-functionality and its related Test cases are assessed
by a team of stakeholders for its ‘Likelihood of failure’ and ‘Impact of failure’.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 11/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
The likelihood of failure of each functionality in the production is generally accessed by a group of ‘Technical Experts’ and are
categorized as ‘Likely to fail, quite likely and unlikely’ along the vertical axis of the grid.
Similarly, the ‘Impact of failure’ of these features and functionalities in production is experienced by the end customer, if not
tested is assessed by a group of ‘Business Specialists” and are categorized under ‘Minor, Visible and Interruption’ categories
along the horizontal axis of the grid.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 12/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
All the Test cases are positioned in the quadrants of the 3 X 3 grid based on the identified values of a likelihood of failure and
impact of failure which are shown as dots in the picture below.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 13/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Obviously high likelihood of failure and high impact of failure (interruption) are grouped in the top right corner of the grid,
which is of high importance and hence it is identified that ‘High Value’ tests and ‘Low Value’ tests are grouped in the bottom
left corner which is of least or no importance to the customer, where minor focus can be given to these features or test cases.
Based on the above positioning of the test cases in the grid, the tests are prioritized and labeled with priorities 1,2,3,4 and 5
and are marked against each of them. The most important tests are positioned in a 1st grid that are assigned with priority 1 and
similarly less important ones are ranked as 2, 3, 4 and 5.
Finally, all the test cases are sorted based on their priority numbers and are picked up for execution in the order of priority.
The high priority ones are picked up for execution first and low priority ones are either executed later or de-scoped.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 14/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
The next step is to decide on the level of details of testing for the defined scope of testing. The depth of the scope of the
testing can be decided based on the above ranking as per the below grid.
High priority tests with ranking 1 are ‘More Thoroughly’ tested and accordingly, experts are deployed to test these high
criticality features and its related Test Cases. Similarly test cases with priority 2, 3, and 4. A decision to de-scope priority 5
features and tests based on the available time and resources can be taken.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 15/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Hence, Level of Detail of Testing approach of prioritizing the features and its test cases not only helps the Testers to identify
the ‘High-Value Tests’ but also guides them to decide on their ‘detail level of testing’ based on these priority rankings and
helps them to carry out better testing and reduces testing cost by optimization process.
‘Automate Everything’, ‘Test Everything’, ‘Test Continuously’, ‘Test Repeatedly’ are the key concepts of these practices.
Each time, when there is a change in the code or there is a release, all the designed tests are run through the automated
Continous Integration(CI) / Continuous Delivery(CD) pipeline quickly and repeatedly, irrespective of their prioritization.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 16/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Then what is the relation between RBT and DevOps? Where would RBT fit in and become relevant in Agile and DevOps???
#1) Yes, as I said earlier, it is not that every Industry and every product has 100% automation coverage for their test executions.
So, if at all the team has to make the choice of prioritization for test execution from the choice of manual test cases and
would like to spare the energy and effort of the test resources towards other activities, then RBT is the best choice.
The Risk-Based approach is also a better bet for running automated tests with high priority ones and testing at the earliest.
#2) QA team can adopt the RBT approach more effectively during the Requirement Analysis in analyzing the requirements and
providing an advance report of the probable risks of the products and the features so that appropriate actions could be taken
proactively by the program team to mitigate it.
#3) RBT approach can be effectively used in designing the Test Cases and scenarios based on High risk so that more focus can
be paid towards high-risk features and functionalities.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 17/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
PRTG Network Monitor Download
#4) Identifying the ‘High Risk’ areas enables the QA team to focus their Testing effort on those areas to test ‘More thoroughly’
using ‘High Skilled Testers’.
#5) ‘Fail Fast’, as we all know is the concept of ‘Agile’ and ‘DevOps’, for which RBT approach helps to identify the ‘high risk’
areas in the software, identify the defects early and allow them to fail fast and fail first and let the team fix it.
#6) The ultimate goal of Agile/DevOps is ‘Customer focus’ and hence the RBT approach enables the QA to focus on customer
experience than just finding Defects.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 18/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
RBT allows the Team to decide well in advance on the implementation of the most effective way of mitigation for the
product risks.
RBT helps in avoiding the effect of the inappropriate implementation of mitigations.
Risk-Based Testing allows the team to take appropriate action either to mitigate or to plan for contingency or to position
any workaround to overcome the failure or reduce its impact if the risk occurs in Live.
RBT helps in minimizing the residual risk in the release.
It helps in achieving the ‘Improved Quality’ through less costly defects in the production.
Ultimately helps in ‘Improved customer experience’ and ‘Satisfied Customer’.
Next, we will learn how to manage risks at Test Planning and Test Execution phases of the Software Testing Life Cycle.
Life is full of risks, and so is a software project. Anything can go wrong anytime. We are always on our toes to make things right
– but what about making sure that nothing goes wrong and that when it does we know exactly what to do? Enter Risk
management – this is a portion of a software testing project that prepares us to prevent, understand, find and get over risks.
A risk is simply a problem that is likely to occur and when it does occur, it will cause a loss.
The loss could be anything- money, time, effort or a compromise in quality. The loss is never good. No matter how much of a
spin we give it, it’s not positive- and never will be. Therefore Risk management is an integral part of software projects to make
sure we handle risks and prevent/reduce losses.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 20/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Risk-Based Testing: Since we are a QA community let us stay specific to risks and the process related to it in our QA world
exclusively. Risks are assessed and managed roughly in 2 phases of our Software Test life cycle. STLC can be categorized into 3
phases -Test Planning, Test Designing, and Test Execution.
1. Test Planning
2. Test Case Design(end) or sometimes in the Test Execution phase
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 21/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Even though the underlying process is the same, the types of Risks addressed in both these areas are completely different. In
order to do justice to them individually, we are going to handle them differently as a two-part series.
1. Risk Identification
2. Risk Impact Analysis
3. Risk Mitigation
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 22/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
As it is said, the first step to solving a problem is identifying it. This stage involves making a list of everything that might
potentially come up and disrupt the normal flow of events.
This risk-based testing step is commonly led by the QA lead/Manager/representative. However, the lead alone will not be able
to come up with the entire list- the entire QA team’s input makes a huge impact. We can say this is a collective activity led by
the QA lead.
Also, the risks that are identified during the Test planning phase are more ‘managerial’ in orientation- meaning, we are going to
look at anything that might impact the QA project’s schedule, effort, budget, infrastructure changes, etc. The focus here is not
the AUT, but the way the QA phase will go on.
The following is a sample list of risks that might be listed during the Test Planning phase. Please note, that the AUT and its
functionality is not the focus here.
1. The testing schedule is tight. If the start of the testing is delayed due to design tasks, the test cannot be extended
beyond the UAT scheduled start date.
2. Not enough resources, resources onboarding too late (the process takes around 15 days.)
3. Defects are found at a late stage of the cycle or at a late-cycle; defects discovered late are most likely be due to unclear
specifications and are time-consuming to resolve.
4. Scope not defined completely defined
5. Natural disasters
6. Non-availability of Independent Test Environment and accessibility
7. Delayed Testing Due To new Issues
At this point, you can choose to be as thorough as you would like, depending on the amount of time available.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 23/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Once, all the risks are listed, we progress to Risk assessment/Risk impact analysis.
Risk Analysis in Software Testing: All the risks are quantified and prioritized in this step. Every risk’s probability (the chance of
occurrence) and impact (amount of loss that it would cause when this risk materializes) are determined systematically.
High – medium-low, values are assigned to both the probability and impact of each risk. The risks with “high” probability and
“High” impact are taken care of first and then the order follows.
Following these steps, the risk impact analysis table for the above risks listed would look something like this (all values are
hypothetical and only for understanding purposes):
1. Testing schedule is tight. If the start of the testing is delayed due to design tasks, the test cannot High High
be extended beyond the UAT scheduled start date.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 24/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
2. Not enough resources, resources on boarding too late (process takes around 15 days.) Medium High
3. Defects are found at a late stage of the cycle or at a late cycle; defects discovered late are most Medium High
likely be due to unclear specifications and are time consuming to resolve.
The final step in this Risk-Based Testing (RBT) process is to find solutions to plan how to handle each one of these situations.
These plans can differ from company to company, project to project and even person to person.
Here is an example of what the Risk’s table transforms into when this phase is complete:
SCHEDULE High High • The testing team can control the preparation tasks (in
Testing schedule is tight. If the start of the advance) and the early communication with involved
testing is delayed due to design tasks, the parties.
test cannot be extended beyond the UAT • Some buffer has been added to the schedule for
scheduled start date. contingencies, although not as much as best practices
advise.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 25/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
RESOURCES Medium High Holidays and vacation have been estimated and built into
Not enough resources, resources on the schedule; deviations from the estimation could derive
boarding too late (process takes around 15 in delays in the testing.
days.
SCOPE Medium Medium Scope is well defined but the changes are in the
Scope completely defined functionality are not yet finalized or keep on changing.
Natural disasters Low Medium Teams and responsibilities have been spread to two
different geographic areas. In a catastrophic event in one
of the areas, there will resources in the other areas
needed to continue (although at a slower pace) the
testing activities.
Non-availability of Independent Test Medium High Due to non availability of the environment, the schedule
environment and accessibility gets impacted and will lead to delayed start of Test
execution.
Delayed Testing Due To new Issues Medium High During testing, there is a good chance that some “new”
defects may be identified and may become an issue that
will take time to resolve.
There are defects that can be raised during testing
because of unclear document specification. These
defects can yield to an issue that will need time to be
resolved.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 26/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Conclusion
This brings us to an end of Risk management in the Test planning phase. Even though the underlying steps and principles are
similar, the risk management process is more concentrated towards the AUT when it happens in the test designing/execution
phase.
In our next section, we will cover – Risk Management in the Test Execution phase.
There is one other form of Risk Management (also sometimes referred to as, Risk-based testing) that occurs during the Test
designing or Test execution phase depending on the situation. Now, what situation are we talking about? Let us try to
understand that first.
We all know that our testing work is reactive. No requirements (or scope defined), we can’t perform a feasibility analysis and
write test scenarios or plan for testing activities.
Similarly, when the code is not ready we have nothing to test, no matter how much of prep-work we might have been ready
within terms of test cases, test data, etc. Also, testing is the only step left before the product goes live.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 28/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
If testing was to begin on said date, Jan 1st and had to go on until Jan 14th – when the testing is done, the product’s Go-live
date is usually fixed immediately. Let’s say- Jan 15th for simplicity’s sake. Now, in perfect world things would go exactly as
planned. But we all know the reality.
In this case, let us assume that for some reason, the testing did not start until Jan 7th, which means we lost half of our testing
time. But we do need 14 days to test the product thoroughly. We could move the go-live date farther by 7 days- however; this
usually is not an option. Because the product is promised to hit the market on a certain date and any delays are not good for
the business.
So, usually, we testing teams have to absorb the delays, compensate somehow, work with the time available and make sure
the product is tested well. Tough job, isn’t it?
Now, if delays are anticipated ahead of time before even the testing begins- the process takes place in the Test
designing phase.
If delays happen during a Test Execution phase that started normally- the process is followed during the test execution
phase.
The steps and the method are the same no matter what stage it happens.
Risk management takes place to determine what areas of the AUT (Application Under Test) need maximum focus. These are
typically the functional areas (modules or components) that are critical for the success of the final product and are most
prone to failure.
Read also => Failure Mode And Effects Analysis (FMEA) is a Risk Management technique
Since it is regarding the AUT, the knowledge about it is not only with the QA but with all the other teams – Dev, BA, Client,
Project management teams, etc. Therefore it is a collective effort, driven by the testing team.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 29/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Identify all the functional areas of the AUT. This will simply include making a list.
All the risks are quantified and prioritized in this step. Quantifying is simply, assigning a number to each risk in the list that will
give an indication of the priority with which it needs to be addressed.
Every risk’s probability (the chance of occurrence) and impact (amount of loss that it would cause when this risk materializes)
are decided.
The typical method is to assign the ratings. For Example, Probability can take values 1 to 5. 1 being the probability of
occurrence being low (not likely to happen at all) and 5 being high (will most certainly happen).
Similarly, Impact can also be assigned a 1-5 rating. 1 being low impact (even if this risk does materialize, the loss is minimum)
and 5 being high impact (huge losses when happens).
Step #3)
Make a table format and circulate to all the team reps- Dev, BA, Client, PM, QA and anyone else relevant.
Step #4)
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 30/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Instruct each team to fill in the values based on their rating for probability and impact.
Since the probability and impact values are numeric it will make the calculating of the “Risk Factor” value easy.
Risk factor = Probability X Impact. The higher the risk factor, the serious the problem is.
An example:
Please note that at this point, this is simply the outcome of one team’s rating. For a project where 5 different teams are
involved the QA team would end up with 5 different tables.
Step #5)
Take an average of the Risk factor values. For Example, if there are 5 teams, for each module, add all the risk factor values and
divide it by 5. This are the final values we are going to deal with. Say, these are the averaged risk factors:
The more the risk factor, the more that module has to be tested.
So, Module 5 and 2 are most crucial for the success of the business. Share the results with all the teams.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 31/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Step #6)
Risk Mitigation Plan: Now, this is the step that changes from Project to Project. We have identified that modules 5 and 2 are
the ones that need to be concentrated on most.
1. Modules 5 and 2 will be tested thoroughly by making sure all the test cases related to them are tested. The other
modules will be tested on an exploratory basis.
2. Modules 5 and 2 are going to be tested first and then depending on the time available the others are going to be taken
care of.
Once a plan is made, all the teams reach an agreement and follow it to test the product keeping into account the risk-factor.
That’s it!
Since this is a collective activity that takes everyone’s opinion into consideration; the chances of it being accurate and
effective are higher.
This is not a formal method and does not have to be a part of every QA project.
Sometimes, even if the team chooses not to draw tables and assign values- a simple brainstorming session with
everyone present can give the QA team good direction on how to proceed.
The development team’s input is very important because they are the ones who create the product, so they will know
what might work and what might need additional checking. Be sure to be on the lookout for that.
Even though there are multiple steps in the process, it does not take a considerable amount of time to perform them.
Especially, if all the teams can sit together and work simultaneously.
Remember this process and its outcome is only the alternative. Getting as much time as planned for testing is the best
way to perform the QA activity.
Conclusion
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 32/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
The Risk-Based Testing approach clearly indicates that the focus of the tester is not just to keep exploring the defects,
irrespective of severity and priority. Now things have changed and Testers have to work smart and they need to understand the
clear ‘Need of the Customer, and Wants of the User’.
They need to study the product thoroughly and understand which is the most frequently used feature in the production, which
is the most critical path for revenue generation and how to protect and safeguard the customers from the production issues
and business threats.
Hence, the RBT approach clearly educates the3 testers that just testing everything or testing extensively does not mean that
testing is complete or there are no defects in the product. Testing effectively in a stipulated time and ensuring that criticaland
major business impacts are nullified and that is quite important for the tester.
Thus Risk Based testing is the most efficient tool for the QA team to guide the project stakeholders based on the project risks.
RBT approach helps the QA team in the continuous identification of risk and its resolution that could endanger the
achievement of the overall project goals and objectives and helps in achieving the ultimate aim of the QA Group.
P.S. The words QA and Testing have been interchangeably used throughout the document.
About the Author: This article is written by multiple STH team members – Gayathri Subrahmanyam and Swati S.
Gayathri is a Software Test SME with 2+ decades of experience in Software Testing and has extensively adopted the ‘Risk-
Based Testing’ approach as a part of Test Industrialization in several engagements and has realized the benefit of Test resource
optimization and quality testing.
Was Risk Based testing a challenging one for you? Do you have any interesting facts to add to our tutorial? Feel free to
express your thoughts in the comments section below!!
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 33/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Recommended Reading
Continuous Integration Process: How to Improve Software Quality and Reduce Risk
Failure Mode and Effects Analysis (FMEA) – How to Analyze Risks for Better Software Quality & Satisfied Customers!
The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Top 10 Risk Assessment and Management Tools and Techniques
Types of Risks in Software Projects
Some Interesting Software Testing Interview Questions
Choosing Software Testing as your Career
Software Testing Course Feedback and Reviews
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 34/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
smita
Reply
Suresh
risk management is a continuous process throughout the SDLC and STLC. But it would have more positive impact
when done at proper stages.
Reply
Zakir
@smitha
Need to wait and stay tuned to the next article on Risk management in test execution phase which can answer your
question :)
Reply
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 35/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
kote
Pardon me for my poor english. Where it says “Holidays and vacation have been estimated” in the example of
mitigation, what exactly does it mean? Does it mean considering working on holidays and vacation if the risk occured?
Reply
Swati Seela
@smita: Both are important and really worth the time. RM at Test planning is almost compulsory.
Reply
Swati Seela
Reply
Swati Seela
@kote: nope, it means planning has been thorough to include holidays and vacation times – this means schedule
variance(if any)will occur only due to unforeseen issues, but not due to slip-ups during planning. Hope that makes
sense.
Reply
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 36/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Amruta Wable
Thank you for this post,its really nice and understand to read risk testing,can you please send me some points about
SDLC
Reply
kote
@Swati: sorry for not writing back sooner. I’ve been away in a while with limited Internet access. Thank you for the
elaboration. I now have a clear idea!
Reply
Rajahmix
This was the wonderful post, it taught me a lot about risk management especially during test planning process.
Reply
Rajesh
Hi,
The article is good. I have few points to add and how do we mitigate them?. Also, I suggest to identify the maximum
risks during test planning phase and document them in Test Plan before requirements review is completed.
1. Schedule risk – requirements got delayed and it has subsequent effect on next tasks like development
design/coding, testing.
2. Test Environment Risk – Coding is completed and build is ready to be deployed in test areas but test areas are not
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 37/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
yet setup.
3. Resources Risk – The resources planned for testing have resigned from organization during the peak testing phase
and they carryout lot of functional knowledge.
4. Communication Risk – There is an communication misunderstanding/problem among requirement engineers,
development and testing teams.
5. Product Risk – If two simultaneous releases are planned to merge at the end of testing phase. Due to the issues
identified in release that affects the other – the product is under RISK if gets released. The management has to take
decision on it.
Reply
@Rajesh: It is a great question. Risk analysis and planning is a preventive activity but it does not mean it will remove
the risk altogether. So, all the situations you mentioned are possible in which we have an issue.
Most issues in IT projects are collective decisions. When these issues do come up- it means its time to sit together
and come up with a alternate plan or workaround.
Risk management prepares us to an extent, but the rest of it is still up to the forces of nature :)
Reply
Srinath
Reply
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 38/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Ramesh Bestha
Reply
Sarita Bennett
Outstanding posting; thanks Swati! Thanks Rajesh for your comments and points. I too thought of identifying the
maximum risk during the initial test plan and modify throughout the SDLC…
Reply
sarvesh
Hi,
very good post on Risk management. Thanks.
Could I request you to add more in Mitigation plan ? I can see risk/problem is again explained in mitigation plan.
Mitigation is to resolve the problem if occurred. i.e. Scope not defined, environment not available, changing
requirements.
Thanks,
Reply
Vinod
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 39/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Reply
paedru
Except for – How to look out for risks?
The answer is – Where to look for for risks?(The areas to focus upon in a software implementation)
The below points out those areas to focus upon to look for risks instead of randomly thinking out areas of risks which
could appear in a software project.
1. Functionality
2.Localization
3.Usability
4.Relaibility
5.Performace
6.Suportability and so on.
Once the areas are listed for a project,within the area determine in whihc particular functionlaity things could go
worng(by asking about complexity of the function to the tech team) and impact on business to the Clients.Then
multiply those factors by asiiging wieghtage and mitagate those risks.
Reply
ben
Great Article..Thx
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 40/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Reply
ben
1.Poor requirement
2.Non-availability of SRS/BRS
3.Inexperienced or unskilled resources
4.Poor client communication
5.Delay from the development phase.
Reply
Rupesh
Reply
Princess
This is a really good article for Test Managers, Test Leads and Testers to read. Thanks a lot for all the contributes. It’s a
rich article for me , as am currently writing a Test Strategy and about writing about the risk.
Reply
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 41/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Sar Sophara
Thanks
Reply
Sengu
Great Article….
Reply
Ashish
Hi
I have question,
If someone not having the latest version of build then what would be the mitigation Plan for this
Reply
Narendra
Hi Swathi,
Thanks,
Naren
Reply
yeshwanth
mR Big dIcK
shut up jacob
Reply
js
Great Article..
Reply
Sanjiv Patel
@Rajesh Please explain more on test areas are not yet setup.
I came a cross ALM (QC) not setup correctly, Project and column not found in report.
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 43/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Reply
Luc
Informative article. Very helpful in developing a risk based strategy for functional testing in a project I’m working on. In
the “Level of Detail of Testing” diagram, one of the levels listed is “Identification”. Do you have an explanation or
example to put this in context? …or a related article?
Thanks
Reply
Roshni
Hi, Swati
Very informative article. I really appreciate your efforts. could you please enlighten me further on what is the
difference between Risk Based Testing and FMEA?
Thank you.
Reply
Rose
Hi! I have a question about identifying the most critical features in the product. In which phase should we define
them? Because according to the article in the Test planning phase “The focus is not the AUT, but the way the QA phase
will go on.” And that in Test Design/Execution phase “Risk management takes place to determine what areas of the
AUT need maximum focus.” (And that this occurs when there is a delay.) But what if there isn’t any delay? Shouldn’t
we always identify the most critical features in the beginning during the Test Planning phase? Sorry if it is a stupid
question, it is just isn’t quite clear to me, maybe because I’m new to testing. Thanks in advance!
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 44/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Reply
Leave a Comment
Name *
Email *
POST COMMENT
About SoftwareTestingHelp
Helping our community since 2006! Most popular portal for Software professionals with 240 million+ visits and
300,000+ followers! You will absolutely love our creative content on Software Tools and Services Reviews!
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 45/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Recommended Reading
Continuous Integration Process: How to Improve Software Quality and Reduce Risk
Failure Mode and Effects Analysis (FMEA) – How to Analyze Risks for Better Software Quality & Satisfied Customers!
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 46/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
Top 10 Risk Assessment and Management Tools and Techniques
Types of Risks in Software Projects
Some Interesting Software Testing Interview Questions
Choosing Software Testing as your Career
Software Testing Course Feedback and Reviews
JOIN Our Team!
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 47/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 48/49
2/3/23, 2:30 PM The Ultimate Guide to Risk Based Testing: Risk Management in Software Testing
© COPYRIGHT SOFTWARETESTINGHELP 2022 — READ OUR COPYRIGHT POLICY | PRIVACY POLICY | TERMS | COOKIE POLICY | AFFILIATE DISCLAIMER
https://www.softwaretestinghelp.com/risk-management-during-test-planning-risk-based-testing/ 49/49