Shri Dhar Renewable Energy Pvt Ltd
"Authorized Channel Partner of Adani Solar"
To,
Mr Rishi ji
Bhopal
Subject: Offer for installation of 3 KW Grid-Tie
Roof Top Solar System under MP Net -Metering
Policy.
Dear Sir,
This is with reference to above subjected
matter we are looking forward for installation
of 3 KW Solar Plant at your Premises under MP
Net metering arrangement. The proposal
consists of techno–commercial offer for
Erection, Procurement & commissioning (EPC)
as per Adani Solar Guidelines of solar plant.
Regards
Dev Khamparia
EPC Head
9238106931
PROJECT SCOPE OF WORK
SECTION DETAILS SDRE CLIENT
Site Inspection Inspection of site suitable for
solar plant
*
Approvals Discom and other Govt.
entity approval
*
Design Solar plant design for
best performance with less
*
area
Installation Installation of structure and
PV module
*
Water Facilities Arrangement All Necessary Arrangement f
for Cleaning or Cleaning
*
Commissioning Solar Plant commissioning
*
Liaisoning Liasoning work with
respective discom.
*
Material & Warranty Details
COMPONENTS SPECIFICATIONS
Solar Panels Adani Monoperc Bi-Facial 525/530 WP
Inverter Polycab
Structure Pre-GI 80x40
Foundation Type Concreting
Junction Box Havells
BOS Complete Havells/Polycab
Structure Warranty 5 Years
Panel Warranty 30 Years
Inverter Warranty 7 Years
Structure Design Life Applicable
LA Earthing Havells/Polycab Copper
Project Details
Customer Name Rishi ji
City Bhopal
Date Of Quotation 13-09-24
Mobile No. 0000000000
Plant Size 3 kw
Number of Solar Panels 6 Panels
Panels Type Mono-perc Adani Bi-Facial
Inverter Typer and Size Polycab 3.6 kw single ph
Structure Type & Height 6ft
System Price ( Panel + 190000
Inverter+BOS+Installation + Net Metering
+O&M)
Net Price 190000
Subsidy Under National 78000
Portal Scheme (DBT in Client
Account)
Payments Terms
Booking – 10000
Design Approval – 30%
Before Material Dispatch – 70%
Terms & Conditions
1. Advance payment is Non Refundable.
2. Plant commissioning time is 35 days for Regular Case while 70 Days
for Load Change case , excluding the time taken for bill correction.
This differs from DISCOM to DISCOM.
3. Subject to all documents and payments being received within
timelines.
4. System price only applicable for 3 months. Any further delay on
account of customer might lead to price escalation.
• Subsidy Amount will be directly
transferred to Client account after Commissioning by MNRE.
• Offered Price is applicable for One week after Quotation Date.
* Load Change, Name Change, Phase Change Charges will be extra as per
actual.
Few Glimpse of Our Executions
JABALPUR OFK 150KW
MALTI ICECREAM INDUSTRIES JABALPUR 60KW
SWAD RESTAURENT KATNI 30 KW
HOTEL ONYX JABALPUR 20 KW
KANCHAN HOSPITAL 50 KW RAJGARH
SBI INDORE 80KW
UNITY BUILDER 200KW
PIPARIYA MANDI 50KW
SBI BHOPAL 66KW
SBI INDORE 30KW
ASHOKNAGER COLLECTORED 80KW
GUNA COLLECTORED 80KW
ASHOK NAGER COLLECTORED 80KW
RAISEN COLLECTORATE 30KW
SEHORE RAILWAY STATION 15 KW
GOVT. CIVIL HOSPITAL PIPARIYA 15 KW
JABALPUR COLLECTORATE 30KW
SEONI COLLECTORATE 90KW
NARSINGHPUR COLLECTORATE 100KW
MANDLA COLLECTORATE 25KW
DINDORI COLLECTORATE 30KW
SBI KATNI 66KW
CHATARPUR 30KW
PANNA COLLECTORATE 120KW
This Photo by Unknown author is licensed under CC BY.
Shri Dhar Renewable Energy Pvt Ltd.
“Authorized Channel Partner of Adani Solar for
MP”
Head Office : B-1, Plot no 148, Sanchi Apartment
, Trilanga ,
Bhopal Contact No -
8966000065/9755948043