0% found this document useful (0 votes)
168 views4 pages

Demonstration Checklist

Demonstration Checklist
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views4 pages

Demonstration Checklist

Demonstration Checklist
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

RATING SHEET FOR DEMONSTRATION AND ORAL QUESTIONING

Candidates Name: Albert Borda


Assessor Name; Wendel C. Villasis
Unit of Competency: Lay out dimension of form sheating and stiffeners
Competency Standards: Carpentry NC II
Date of Assessments: January 29,2018
Time of Assessments: 8:00 A.M.
Instructions for Given the required tools, materials and
demonstration: equipment the trainee should be able to perform
on lay out form sheathing and stiffeners based in
the competency standard following the
procedures in 1 hour and 30 min.
(Insert the instructions for the candidate)
 You will be rated using the demonstration checklist
 Oral questioning will follow
 Written test will be given after the interview
 Be sure to use PPE and practice safety
Materials and equipment (insert details of materials and equipment needed
for the demonstration)
Tools Equipment: Testing Materials:
Devices:
 Miter cut-off  Portable
saw circular  Ply wood
 Bench rule saw  Lumber
 Pull push  Power
rule planer
 Chalk line
 Framing
square
 Try square

Place check () to


OBSERVATION show if evidence is
demonstrated
During the demonstration of skills, did the Yes No N/A
candidates:
Selects PPE’s according to job requirements and OSH /
standard.*
Interprets related plans and details according to job /
requirements
Selects and prepares materials, hand tools and /
equipment in line with job requirements*
Re-checks and properly stages materials according to /
job requirements otherwise defective materials
or not in specifications are reported to immediate
superior
Responds to unexpected situations in line with /
company rules and regulations.
Performs housekeeping according to safety /
regulations.*
Measures and marks form sheathing and stiffeners /
according to job specifications
Lays-out and cuts form sheathing and stiffeners with /
tolerances of 3 mm for all measurements and
squareness.
Checks form sheathing and stiffeners for column, /
beam, wall, slab and stair with standard spacing for
studs or nailer with tolerance of ±10mm O.C
Correctly positions Materials and/or fabricated form /
sheathing and stiffeners
Responds to unexpected situations in line with /
company rules and regulations.
Performs housekeeping according to safety /
regulations.*
Checks assembled form panels checked for /
squareness, levelness and alignment to specified
tolerance.*
Applies temporary fixing and permanent assembly /
techniques to hold form panels together as per job
requirements.
Checks assembled form panels for compliance with job /
requirements.
Responds to unexpected situations in line with /
company rules and regulations.
Cleans up worksites according to safety regulations /
and OSHC specifications.*
Accomplishes daily work report in accordance with /
company rules and regulations.*
*Critical aspect of competency
ORAL QUESTIONS
Questions to probe the candidate’s underpinning knowledge Satisfactory
Response
Yes No
Extension/Reflection Question
 If the conduit is not appropriately attached to /
connector, what will happen to the wires inserted?
 If obstruction is done in the conduit and connector due /
to inappropriate installation, what will you do?
Safety Questions
 What will you do in order to prevent hazard during /
installation of electrical metallic tubing?
 What type of PPE will you use to protect your hands /
upon installation of electrical metallic tubing?
Contingency Questions
 How can you prevent the elbows from sagging or being /
detached from the main tubing?
 How will you attend to, if during the installation of /
metallic tubing you found out that one coupling is
missing?
Infrequent Questions
 How can you prevent the elbows from sagging or being /
detached from the main tubing?
 In case there is no extra coupling, what is your /
response?
Job Roles Questions
 What is your role as Electrician? /
 How can you install electrical works? /
The candidate underpinning knowledge was:

Satisfactory / Not Satisfactory


Feedback to candidates
The performance in threading the conduit is excellent
The candidate’s over-all performance was
Satisfactory / Not Satisfactory
Candidate signature: Date:
Assessor signature: Date :

MODEL ANSWERS:
Extension/Reflection Question
 If the conduit is not appropriately install to connector, what
will happen to the wires inserted??
The path is obstructed.
 If obstruction is done in the conduit and connector due to
inappropriate installation, what will you do?
Repeat the installation of conduit and connector.
Safety Questions
 What will you do in order to prevent hazard during installation
of electrical metallic tubing?
Observe safety precautions.
 What type of PPE will you use to protect your hands upon
installation of electrical metallic tubing?
Gloves.
Contingency Questions
 What if the main conduit is detached from the elbow?
Use connectors,clamps or straps for mounting
 What if during the installation of metallic conduit you found
out that one coupling is missing?
Make a remedy to comply with the installation.
Infrequent Questions
 How can you prevent the elbows from sagging or being
detached from the main tubing?
Mount connectors, clamps or straps
 Supposing in the installation of your metallic conduit you
found out that one coupling is missing, what is your response?
Install box to attach the conduit.
Job Roles Questions
 What is your role as Electrician?
Install electrical works
 How can you install electrical works?
By having knowledge in EIM, Use of Electrical Tools and following
procedures or standards in doing electrical woks.

You might also like