Casing Drilling Report for LSE-1112
Casing Drilling Report for LSE-1112
70 Off-bottom Torque 14
13
500
Block Weight, klbs
60 12
Torque, k.ft-lbs
11
50 10 400
9
40 8
300
7
30 6
5 200
20 4
3 On-Bottom Pressure, Psi
100
10 2 Off-Bottom Pressure, Psi
1 Flow Rate, Gpm
0 0 0
0 50 100 150 200 250 300 350 400 450 0 50 100 150 200 250 300 350 400 450
DEPTH, meters DEPTH, meters
String RPM
70 -50
Max. WOB, klbs
50
-100
60
40
-150
50
DEPTH, meters
-200
30 40
-250
30
20
-300
20
Max. WOB, klbs
-350
10
10
-400
0 0
-450
PM
PM
PM
A
A
0
00
00
00
00
:0
6:
2:
8:
4:
10
19
19
19
19
19
0
0
0
0
/2
/2
/2
/2
/2
1
1
1
1
/0
/0
/0
/0
/0
02
03
02
03
01
CASING DRILLING TALLY
Well Name : LSE-1112 MU Torque, ft-lb : 22,000 Casing Size, inches : 13-3/8”
Operator : PERTAMINA EP Csg. Capacity, bbls/m : 0.49 Thread Type / Grade :BTC w/ MLTR /
Rig Name : PDSI #22.2/OW700/40 / Annulus Cap., bbls/m : 0.41 Poundage, lbs/ft : K55
54.5
Rotary to mudline, m : Land rig Casing Collapse, Psi : 2260 Casing I.D., inches : 12.715
13-3/8” CwD Plan TD, m : 398.50 Casing Burst, Psi : 5020 MU Loss (BTC), m : 0.117
13-3/8” Final Shoe Depth, m : 397.69 Tension, klbs : 1556 MU Loss (Vam Top), m : 0.145
Casing Tally
Run No. Joint Name Gross Length Run Length Bit Depth MU? Comments
Depth
XCD3 0.63 0.63 0.63 Apply Threadlock
Bit Joint
Full Joint 11.77 11.77 397.87 12.40
39 410.00 371.00 1 - 25 0 - 55 600 - 710 350 - 880 28.25 0.0 - 12.0 LOCATION ONSHORE KALIMANTAN
Spud in well LSE-1112. " RIH and cleanout 20” conductor to openhole of 1m rathole to 39mMD with 17-1/2"
CD SPUD DATE Mar 5, 2019
5:00 16:00 11h 0m
Rotary BHA. Circulate hole clean. POOH BHA.
RIG NAME / TYPE PDSI #22.2/OW700/40 / Land rig
16:00 17:00 1h 0m Clear rig floor for next operation. Mudlogger calibrate sensor on TDS.
17:00 19:00 2h 0m PJSM. Rig Up CDS. Demonstrate CDS and R/U handling equipment. CD ENGINEERS M. Firdaus/ Jevi S. / Fisty A.
19:00 20:00 1h 0m Wait for night crew change. DRILLING SUPV. Obi Bhirowo
20:00 21:45 1h 45m PJSM. M/U XCD Bit+1jts Csg+ Float Valve#1 + 1jts Csg + Float Collar#2 + 1jt Csg. Function test good.
Drill formation from 44-84.82mMD. WOB 5-10 klbs , Flow 600-650 gpm, SPP 575-715 psi, RPM 30-40, TQ CASING PROPERTIES
21:45 0:30 2h 45m 1,000-5,000 lb.ft, on bottom ROP m/hr. CDS cement swivel leaking. DSV decided to halt drilling while waiting
for new CDS.
CASING SIZE 13-3/8” CASING I.D. 12.715
22 JULY 2019 THREAD TYPE BTC w/ MLTR BURST , Psi 2730
Wait for new CDS to arrive location. Keep string rotated at 5rpm and circulation at 200gpm. Well is in full return CSG GRADE K55 COLLAPSE, Psi 1130
0:30 8:00 7h 30m
condition.
MU TORQUE,
8:00 8:30 0h 30m L/D 1 joints of casing. Casing body collapsed on the pin side. POUNDAGE, lbs/ft 54.5 (ft.lbs)
22,000
8:30 10:30 2h 0m R/D CDS and R/U newly arrived CDS.
BIT DATA AND HYDRAULICS
10:30 11:30 1h 0m Flow test on CDS, found packer cup not holding flow. Change out CDS nose cone.
BIT RUN # / 1 11-947
Drill formation from 84.82-328 mMD. WOB 4-20 klbs, Flow 650-700 gpm, SPP 470-850 psi, RPM 30-55, TQ SN#
11:30 0:00 12h 30m
2,000-10,000 ft-lbs. Overall on bottom ROP 33.43 m/hr. Firmer formation. BIT SIZE /
MFG.
17-1/2” Schlumberger
JETS / TFA /
23 JULY 2019 H.S.I.
8x12 1.043 0.743
Drill formation from 328-398.5 mMD. WOB 10-25 klbs, Flow 700-710 gpm, SPP 350-460 psi, RPM 40-50, TQ
8:30 4:30 20h 0m
5,000-12,000 ft-lbs. Overall on bottom 32.54 m/hr. Cuttings shown sandstone at this depth.
DEPTH IN/OUT 39 398
DRILL OUT BIT
4:30 7:30 3h 0m
DSV decided to continue drill deeper of formation from 398.5 - 410 mMD to find shale casing seat. WOB 5-18
GRADE IN
Varel MT IADC 217 Bit, New
klbs, Flow 700 gpm, SPP 350 psi, RPM 50, TQ 5,000-8,000 ft-lbs. Overall on bottom 30.37 m/hr.
DRILL OUT BIT 2-4-WT-A-E-I-BT,SD-BHA
Reached TD 410 mMD, Circulate 2x bottom-ups, sweep out 30 bbls Hi-vis and proceed with cementing job.
GRADE OUT
MUD PROPERTIES
MUD TYPE WBM VISCOSITY (s/qt)
PV / YP SAND (% vol.)
EQUIPMENT USED
Primary CDS Supplied by Carana
Back up CDS Supplied by Carana
HPU Supplied by Carana
Drilling Hours 13h 8m Section Drilled, m371.00 Average ROP, m/hr 28.25
2
4 (FC)
3 39 39.00
Tagged cement@shoe at 36m MD with 4klbs. Ream inside 20” casing
34 1 0 575 30 600 21:44:41 1 575 3 5 22:04:08 49.44 30 30 30 19m 27s 10.44 32.21
to pass thru obstruction.
5 0.4 200 690 40 650 22:19:44 1 690 3 7 22:48:57 61.72 32 32 32 29m 13s 12.28 25.22 Vibration observed at 60 mMD, suspect coal formation.
6 33 1 715 30 650 23:10:01 1 715 4 8 23:33:10 73.75 35 35 35 23m 9s 12.03 31.18 Pump 30 bbl hivis,high vibration at 61.5 mMD
High vibration at 76 mMD, suspect coal formation. Leaking on cement
7 1 660 30 650 23:49:36 1 660 3 8 0:27:49 84.82 38m 13s 11.07 17.38 0:30 11:50 11h 19m 47s
swivel grease nipple.
35 36 1 1 850 30 670 11:46:08 1 850 2 5 11:53:21 85 35 35 35 7m 13s 0.18 1.50
36 35 1 1 640 40 650 12:04:37 5 640 6 10 12:29:23 96 35 35 35 24m 46s 11.00 26.65 Total loss at 96 m
10 1 600 40 670 12:45:42 5 600 6 10 13:02:31 110.69 40 40 40 16m 49s 14.69 52.41 Firm formation
11 1 580 30 650 13:22:14 5 580 7 15 13:44:16 122.23 40 22m 2s 11.54 31.43
Pump hivis 30 bbl, take SPR, flowrate reduced to 620 gpm due to
12 45 1 1 420 30 650 13:54:33 5 470 5 15 14:16:31 133 40 45 43 21m 58s 10.77 29.42
overshaker
13 43 1 1 550 50 670 14:27:26 4 550 6 15 14:44:03 146 42 47 45 16m 37s 13.00 46.94
14 45 1 1 510 50 670 14:55:51 5 500 7 15 15:10:51 158.09 45 47 47 15m 0s 12.09 48.36 Interbedded coal layers.
15 47 1 1 470 40 670 15:30:15 5 490 7 15 15:54:53 170 45 48 48 24m 38s 11.91 29.01 Sweep hi-vis 30 bbls. Interbedded coal layers.
16 48 2 7 480 50 680 16:02:11 5 480 7 15 16:24:57 182.49 46 48 48 22m 46s 12.49 32.92
17 1 475 55 690 16:38:08 8 475 8 17 16:54:24 194.43 49 49 49 16m 16s 11.94 44.04 30bblsHivis.
18 50 1 1 480 55 690 17:06:26 5 480 7 15 17:31:38 205 1 50 50 25m 12s 10.57 25.17
19 52 1 1 490 50 690 17:47:20 5 500 6 17 18:10:33 218.55 52 53 52 23m 13s 13.55 35.02
20 2 2 490 50 700 18:24:18 6 490 6 17 18:47:48 230.68 54 55 55 23m 30s 12.13 30.97
21 1 1 475 50 690 19:01:21 9 475 8 17 19:22:25 242.44 55 56 56 21m 4s 11.76 33.49 30bbls Hivis.
22 1 1 490 50 700 19:34:31 5 490 7 17 19:55:56 254.31 55 55 55 21m 25s 11.87 33.25
23 62 1 1 460 50 700 20:17:07 10 470 9 20 20:42:47 266.66 56 58 58 25m 40s 12.35 28.87 Pump hivis 30bbl, take SPR, hard formation from 261 m
24 62 1 1 720 50 700 20:56:01 5 720 7 20 21:27:41 278.64 60 60 60 31m 40s 11.98 22.70 Pressure increased and low torque observed
25 1.5 1 580 50 700 21:42:13 10 630 10 20 22:02:37 290.88 60 63 62 20m 24s 12.24 36.00 Pump hivis 30 bbl
26 65 1.5 1 700 50 700 22:16:38 10 700 8 20 22:37:27 302.4 63 64 62 20m 49s 11.52 33.20
27 1 760 50 690 22:54:10 5 760 10 20 23:11:05 314.4 63 65 65 16m 55s 12.00 42.56
28 2 1 730 50 690 23:23:17 5 730 8 20 23:42:21 327.08 66 69 67 19m 4s 12.68 39.90
29 2 1 850 50 700 23:56:43 10 880 9 22 0:28:09 338.56 66 69 68 31m 26s 11.48 21.91 Pump hivis 30 bbl, gas increased stop drilling for a few minutes
30 72 4 1 460 50 700 0:47:40 10 460 10 23 1:14:43 350.67 68 70 68 27m 3s 12.11 26.86 Gas increased at 348.16 mMD stop drilling for 5 minutes
32 75 4 1 450 50 700 1:30:06 10 450 11 23 1:52:13 362.69 69 72 70 22m 7s 12.02 32.61 Pump hivis 30 bbl
33 77 4 1 430 50 700 2:07:39 10 440 12 25 2:41:37 375.12 70 73 71 33m 58s 12.43 21.96
37 78 4 1 420 50 700 2:56:30 10 420 12 25 3:15:04 383.23 18m 34s 8.11 26.21 Check pump, pressure drop to 360 psi
37 50 700 3:24:45 10 380 10 25 3:32:18 387.26 73 75 73 7m 33s 4.03 32.03
31 4 1 360 50 710 3:55:32 10 370 11 25 4:18:07 398.5 76 78 76 22m 35s 11.24 29.86 Formation target hasn’t been reached yet, add 1 more jt
8 76 1 1 350 40 700 5:57:36 5 350 8 18 7:15:16 410 76 78 76 77m 40s 11.50 8.88 Called TD at 410mMD. Sweep hi-vis 30 bbls. Circulate hole clean
CASING DRILLING™ CASING DRILLING™
Level-2 Application
JOB SUMMARY
GENERAL INFORMATION
Float Collar
Manufacturer Varel 20” casing @
13-3/8" casing CD Level 2 410.00 m
Dull Bit Grade after Drillout 2-4-WT-A-E-I-BT,SD-BHA 39 m
OPERATION SUMMARY
Casing Drilling Job start on 5 March 2019. R/U Tesco CDS and rig casing handling equipment. PJSM and demonstrate CDS
operations. Pick up 17-1/2” XCD Bit to rig floor. M/U float collar #1 joint & float collar #2 joint with 20 kft.lbs torque.
Circulate through top drive and function test - confirm circulation line clear!
Float Collar
Performed Casing Drilling 13-3/8x17-1/2" with 13-3/8 casing, K-55, 54.5ppf from 49-55 mMD with parameter WOB 5-15 klbs ,
Flow 470-650 gpm, SPP 470-650psi, RPM 30-40, TQ 1000-6000 lb.ft, Experienced total loss most of drilling operation from 55m
onward. Switch from drilling mud KCL Polymer to Water due to losses. Continue casing drilling operation while sweep 30 bbls
hivis every connection for hole cleaning. Reduced drilling flowrate to 470-500 gpm due to total losses since water supply rate
was insufficient, reduced ROP as well to preserve bit while operating at low flowrate limit.
In total need to stop casing drilling operation for around 3.7 hrs due to fill up pit with water since water supply rate could not
keep up with drilling rate at 470-500gpm.
BTC
Continue Casing Drilling 13-3/8x17-1/2" with 13-3/8 casing, K-55, 54.5ppf from 55-402 mMD with parameter WOB 15-30 klbs ,
Flow 470-500 gpm, SPP 32-480 psi, RPM 30-50, TQ 4000-10000 lb.ft, Experienced total loss most of drilling operation, managed
to gain intermittent return from 304m before regained partial return at 3-7bpm from 358 mMD down to section TD. Continue
casing drilling operation while sweep 30bbls hivis every connection for hole cleaning.
13-3/8 x17-1/2
" XCD3, 4-blade
Performance summary: Casing Drilling interval 49-402 m with Avg ROP: 21.86 m/hr.
Make up 12-1/4" Rotary BHA for Drill Out XCD (NB, Reed Hycalog, type S21G, IADC 217, S/N D439201, nozzle 3x22). BHA: Bit,
Bit Sub, 12-1/8" String Stab, 6x8" DC, X/O, 21x5" HWDP. XCD Bit was successfully drilled in 2.16 hours.