Tareg Itp C 021

Reference of Inspection Test Plan for Diriyah Project

Uploaded by

syed.farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

Tareg Itp C 021

Reference of Inspection Test Plan for Diriyah Project

Uploaded by

syed.farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CIVIL

TAREG INSPECTION TEST PLAN-ITP Doc No. TAREG-ITP-C-021 Discipline

ITP TITLE Tiling Works Revision last Revised

PROJECT TITLE CONSTRUCTION OF DIRIYAH GATE 132/13.8KV SS (8240) CONTRACT# 4400017032 Date Approved

INSPECTION LEVELS DOCUMENT CLASS


# PROEJCT PHASE ACTIVITY TAREG Checklist REMARKS
TAREG TO CLIENT TAREG TO CLIENT
DOCUMENTATION
NG approval for supplier obtained prior to proceeding with activities TAREG Method statement
Approval of Tiles, adhesive and grout TAREG-I-CHK-CI-021 RH R Submittal Submittal is required.
RECEIVING OF MATERIALS AND ACCESSORIES
Internal Inspection = ERM + MIRN
Inspection of Tiles and accessories TAREG-I-CHK-CI-021 H W MIRN RMI Client Inspection = RMI
Internal Inspection = ERM + MIRN
Inspection of Adhesive material TAREG-I-CHK-CI-021 H W MIRN RMI Client Inspection = RMI
Internal Inspection = ERM + MIRN
Inspection of Grouting material TAREG-I-CHK-CI-021 H W MIRN RMI Client Inspection = RMI
Internal Inspection = ERM + MIRN
Inspection of Spacers TAREG-I-CHK-CI-021 H W MIRN RMI Client Inspection = RMI

INSTALLATION

Inspection for Surface Preperation. TAREG-I-CHK-CI-021 H W RFI RFI

Inspection for Slope Check for flooring. TAREG-I-CHK-CI-021 H W RFI RFI

Inspection for installation of tiles. TAREG-I-CHK-CI-021 H W RFI RFI

Inspection for final Alignment. TAREG-I-CHK-CI-021 H W RFI RFI

Inspection for Grouting. TAREG-I-CHK-CI-021 H W RFI RFI

Inspection for Slope test/ Drain test TAREG-I-CHK-CI-021 H W RFI RFI

4 PRE-COMMISIONING
Not Applicable

LEGEND
H HOLD POINT QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

F FULL TIME QA/QC organization shall be Available full time on site, before, during and after the actvity. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
INSPECTION
W QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present
WITNESS POINT
I INFORMATION Information only, to be provded to parties via reports or documented communications
R Review Documenation Review, Submission of Reports
R Review Hold Documenation Review, Submission of Reports, Work may not proceed until the documentation is Approved by the relevant parties.