CC Bill Dhangerwadi
CC Bill Dhangerwadi
58
NOTES ZILLA PARISHAD
Contators and suppliers This forn Provites
norCaynents fe ork Ct aupplies actualiy Panchayat samiti
1The tull ame of the work as given in the estimate
Running Account Bill-C
shouc oe entere aganst the line "Name ct work
ecopi In the case of bills tor stock matenals Cach b0ok Voucher No For the
The purpose of supply applicable to the case should Month of ---. -20
be flled in and the rest sored out
3 I tne cutlay on the work is recoreded by sub-heads Name of contractor of supplier - Sarpanch/
the 1otal for each sub-head should be show in the Gramsevak GP Dhangarwad Tq Dist. Nanded
column 5 and against this total, there should be an entry Name of work :-Construction of Composite
In column 6 aiso In no other case should any catries be Gabiyan Bandhara At. Dhangarwadi Tq.
made in column 6
Dist. Nanded
Memorandum of payments
4 The fgures against (K) should be tested to see that Purpose of supply
it agrees with the total of Items 4 and 5.
5 if the net amount to be paid is less than Rs. 10 and Serial No.of this Bill Ist & Final Bill
can not be included in a cheque the payments should be
made in cash the pay order being altered suitably and No. and date of last
Ihe attesed by dated initials bill for this work
5 Irrigation (a)
9 Public Health Engineering (a) Extensicns granted,if any
form time to time with
Deposits and advance (a reference to authority
PLAN NORKS
NON PLAN WORKS (a) Actual date of completion
1) Security Deposit to be
Minor ORIGINAL WORKS (a) Conimunication
Repairs and Maintenance Buildings (a) recovered as per agreement
Head
Sub Head or
2) Securty Depositpreviously
Detailed Head recovefed
Provisicn during the
Current Year Rs
3) Security Deposit to be
Expenditure incurred recovered form this bll
dusing the current year Rs
balanco available Rs
1-Account of work executed
Quntly lkems
ems ofot work
work supplies (grouped under sub-heads or Rale Amount
sub-3 ks of Estinates
6
Item No. 1
30 1000 Excavation of soft soil sand shadu lime including etc 38.18 1149 200
Item No. 2
Item No.
2352 00 Excavation of
includ.ng ctc
sot soil hard murum sand shadu lime
30.30
71265 00
Total
383147 00
COMPLETION REPORT
Name of work
Construction of Composite Gabiyan Bandhara At.
Dhangarwadi Tq. Dist. Nanded
Rs 383170 00
4 Amount of work (Estt) Rs
ark
1-Account of work executed
uantity iems of work supplies (grouped under sub Rale Anount
Up to date Since previuuS Dul
xCCuted (or heads or sub-works of Estimates) (total for cach Sub
Supplied up-to
date aS per
head)
1Measurement RS Ps Rs
Book
BF RS 383147.00
Total
11-CERTIFICATES AND SIGNATURES
Countersigned
Dated Sign
Officer
Sub diviSIonal VWater Conservaton
Zlla Parishad, (MI) Nanded
office wlio epares lhe bill is not the officer who makes the payment
T'se second signature iS only necessary when the
lI1-Memorandum of Payricnts
1 Column Lnty |AI
lvi of ork cons1s D Accouit
as detailed below
5. Payments now to be made
amount creditable to this work
By recovery of
detailed (a
(a) Value of stock supplied as
un the ledger in.
Total 2 (b) + 5 (a) (G)
(c) By cheques
Pay Rs (
(Dated initials of Disburing officer)
By Cheque
of
as per abover Memorandum on a account
Received Rs. (
This work
Dated
(Fuli Signature of the Contractor)
VWitnes5
Dated
paid by me vide Cheque No
Cashier
the payments)
(Dated Initials on person actually making
V-REMARKS
Executive Engineer
remarks of the Disbursing Officer or the
(This space is received for any execution of the works Check of measurements or the state of
the
Imay wish to record in respect of Contractor's accounts)
payable,vide item 50
tiere specify the net amount