0% found this document useful (0 votes)
53 views2 pages

Aakash Tyagi Resume 2

Resume reference template

Uploaded by

raviverma234714
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views2 pages

Aakash Tyagi Resume 2

Resume reference template

Uploaded by

raviverma234714
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Aakash Tyagi

SENIOR - ENGINEER
ƒ 9643804055 # [email protected] ï linkedin.com/in/aakash-tyagi-4ba5b8b0/
Objective
To become associated with a company where I can acquire a challenging position in an environment which best utilize my
skills and education, and gain experience while enhancing the company’s productivity and reputation.

Education
Noida Institute of Engineering and Technology Jul 2014 – Aug 2018
B.Tech in Civil Engineering CGPA: 6.27/10 Gr.Noida, U.P
S.D. Inter College Sadar Meerut Jul 2012 – May 2013
Intermediate Percentage: 71/100 Meerut, U.P
S.D. Inter College Sadar Meerut Jul 2010 – May 2011
High School Percentage: 71.2/100 Meerut, U.P

Technical Skills
• Tools : Autocad 2D, Microsoft Office, MS-Excel, Microsoft Project, Microsoft Word.
• Soft skills : Leadership skills, Team Player, Communicator, Business Acumen, Detail-oriented, Multi-tasking.

Experience
Shapoorji Pallonji & Company Pvt. Ltd. Sep 2024 – present
Senior Engineer Bangalore, Karnataka
• Project : Azim Premji University
• Cost : 600 Cr.
• Key Highlight of Project : Porotherm clay blocks and foam finish concrete structure.
• Ensure quality control measures are strictly adhered to during all finishing operations.
• Coordinate with architects, designers, and contractors to execute finishing works as per design specifications.
• Manage site supervisors and subcontractors to ensure timely completion of finishing tasks.
• Monitor progress and prepare regular reports on finishing work status.
• Resolve technical issues related to finishing and provide solutions promptly.
• Review and approve materials for finishing, ensuring compliance with project standards. Manage the procurement and
inventory of finishing materials.
• Conduct site inspections to ensure work is carried out according to project timelines and quality standards. Maintain
strict adherence to safety protocols and site cleanliness during finishing activities.
• Provide technical support and guidance to the team on finishing-related queries.

Nagarjuna Construction Company Ltd. Aug 2023 – Aug 2024


Assistant Engineer Lucknow, U.P
• Project : Adani International Airport, Lucknow
• Cost : 2400 Cr
• Key Highlight of Project : Baffle ceiling and external glazing.
• Study the major aspects of the assigned part of the project to understand scope of work.
• Study of BOQ and technical specifications.
• Study GFC drawings and prepare detailed planning for the assigned works in line with the base line schedule.
• Ensure availability and understanding of (WMS) work method statement with the execution team and get mock up
approved from the client / PMC wherever required.
• prepare daily progress report & planning for next days work in advance.
• Monitor & optimize repetitions of shuttering material. Control wastage and damages.
• prepare BBS and ensure the execution is in line to the approved BBS.
• Preparation and submission of daily progress data to planning engineer.
• Expeditious liquidation of snag list for final demobilization from the assigned area.
Kamladitya Construction Pvt. Ltd. Apr 2022 – Jul 2023
Civil Senior Engineer Sirmour, H.P
• Project : IIM Sirmour Permanent Campus, Dhaula Kuon.
• Cost : 285 Cr
• Key Highlight of Project : Chain link staircase and rubble masonry.
• Oversee and manage all finishing activities on site, including plastering, painting, tiling, flooring, false ceilings, and
installation of fixtures.
• Ensure that all finishing work is performed to the highest quality standards, meeting design specifications and client
expectations.
• Work closely with project managers, site engineers, and subcontractors to coordinate finishing activities and ensure they
align with the overall project schedule.
• Regular site inspections to monitor progress, check the quality of work, and ensure compliance with safety standards.
• Ensure the availability and proper use of materials for finishing works, coordinating with procurement and logistics teams
as needed.
• Prepare and submit regular progress reports, including updates on work completion, quality, and any issues encountered
• Ensure that all finishing activities are conducted in accordance with safety regulations and company policies.

S.S. Infratech Aug 2018 – Feb 2022


Site Engineer Noida, U.P
• Project : TATA Steel Shredding Plant, Rohtak-Haryana
• Cost : 130 Cr
• Key Highlight of Project : Stone dry cladding and Italian stone flooring.
• Ensure supervision of all construction work at site and execution of project as per the schedule and specification
• Ensure real time monitoring and completion of work within the contract period to avoid cost escalations.
• Timely information to project manager for requirement of construction material and equipment required to avoid any
delay in project because of material unavailability
• Estimating quantities for construction activities for indenting procedure. Measurement of contractor bill for streamlining
the billing procedure
• Responsible for assessing the labour requirement as per the need of the work and ensure adequate deployment of labour.

• Project : Supertech North Eye, Noida (High rise building)


• Cost : 1000 Cr
• Key Highlight of Project : Mivan shuttering and pop ceiling.
• Interpret and implement technical drawings, blueprints, and specifications. Ensure construction is carried out as per the
approved plans.
• Monitor construction quality and ensure all work complies with relevant codes, specifications, and standards.
• Manage on-site labor, materials, and equipment. Ensure efficient utilization of resources and avoid wastage.
• Identify and resolve technical issues, site conflicts, and unexpected challenges that may arise during construction.

Declaration
I, Aakash Tyagi, do hereby declare that the information given above is correct to the best of my knowledge

You might also like