GIS Substation Interlocking Logic Guide
GIS Substation Interlocking Logic Guide
DS -QB1 CLOSED
INTERLOCK
=1
DS -QB1 OPEN
DS -QB2 CLOSED
=1
DS -QB2 OPEN
DS -QB2 CLOSED
-QC52A M
-QB1 -QB2
-QC1 -QC2
-QB52A
-BA6A MANDATORY
-QA1 M
INTERLOCK
C1 C2 C3 SF6 STAGE-1 HEALTHY
TCS-2 HEALTHY
SPRING CHARGED
-QC1A -QC1B
-QC1 -QA1 M
-QC2 -QC2A -QA1 M
-QC2B -QC1 -QA1 M
-QC2
BCU SW IN REMOTE
BUS-IA
BCU SW IN LOCAL
OR
CA IN BCU
BUS-2A
CA IN MIMIC
-QC52A M CA IN REMOTE
&
BCU SW IN LOCAL
-QB1 -QB2
-QC1 -QC2
BCU SW IN REMOTE
-QB52A ORDER FROM BCU &
-BA6A
-QA1 M
C1 C2 C3
SYNCHROCHECK *) Note-12 OR
RELEASE
REMOTE CONTROL &
LOCAL CONTROL
CA IN MIMIC
BUS SECTION-1
-QA1 M CA IN BCU LOCAL CONTROL OR
CA IN REMOTE REMOTE CONTROL
-QC1A -QC1B
&
-QB1A QB1B ORDER FROM MIMIC NORMAL MODE
SELECTED &
BUS-IA BUS-IB NORMAL CLOSING *) Note-1, 2
ENABLED FROM CRP ORDER FROM LCC
SYNCHROCHECK *) Note-11
BUS-2A BUS-2B
RELEASE FROM MFP
PROTECTION PANEL
C1 C2 C3 -QC51A M OR BCU
SAS HMI IN LOCAL CA IN REMOTE
BUS-IA
BCU SW IN LOCAL
-QC52A M
OR
-QB1 -QB2
-QC1 -QC2
CA IN BCU
-QB52A
-BA6A CA IN MIMIC
-QA1 M
C1 C2 C3 CA IN REMOTE
&
BCU SW IN LOCAL
BUS COUPLER-A &
BCU SW IN REMOTE
-QC1A -QC1B
-QB1A QB1B
BUS-IA BUS-IB
REMOTE CONTROL
CA IN MIMIC LOCAL CONTROL &
CA IN BCU
BUS-2A BUS-2B
&
CA IN REMOTE
-QB1 -QB2 -QB2A -QB2B -QB1 -QB2
ORDER FROM MIMIC
-QC1 -QA1 M
-QC2 -QC2A -QA1 M
-QC2B -QC1 -QA1 M
-QC2
*) Note-1, 2
CB READY OR
BUS COUPLER-A BUS SECTION-2 BUS COUPLER-B
PROTECTION PANEL
CB -QA1 LOCKOUT-1 TRIP
*) Note-1, 2
OPEN INHIBIT
COMMAND
OR TO CB
LEGENDS: NOTES:
TCS: TRIP CIRCUIT SUPERVISION 1. Logics have to be established in CRP by bringing statuses of all relevant
A/R: AUTO RECLOSE devices; wiring among the switching devices are not allowed.
CA: CONTROL AUTHORITY SWITCH 2. More than one device will not be allowed to move at the same time.
M1FP: MAIN-1 FEEDER PROTECTION RELAY 3. Closing from LCC will be for maintenance purpose only; all CB internal
M2FP: MAIN-2 FEEDER PROTECTION RELAY blocking such as SF6 Stage-1 & 2 alarm, spring discharge etc. will be
BUFP: BACK-UP FEEDER PROTECTION RELAY applicable for such closings.
BCU: BAY CONTROL UNIT 4. CA is a 4 (Four) position switch having the positions of LOCAL CONTROL
BCPU: BAY CONTROL & PROTECTION UNIT OFF/MIMIC/BCU/REMOTE which will be installed in CRP.
SAS: SUBSTATION AUTOMATION SYSTEM 5. If BCU/SAS is not available in the substation, the CA will be a 3 (Three)
LCC: LOCAL CONTROL CUBICLE position switch having the positions of OFF/LOCAL/REMOTE which will
REMOTE CONTROL &
be installed in CRP. *) Note-5
6. LOCAL/REMOTE selector switch of LCC, CA (Control Authority) switch
ORDER FROM LCC
of CRP can be in only one position at any given time.
7. INTERLOCK BYPASS switch will be installed in CRP.
& AND GATE- OUTPUT IS 1 WHEN ALL INPUTS ARE 1
8. For MIMIC CONTROL, Synchrocheck will be performed by M2FP.
9. For BCU CONTROL, Synchrocheck will be performed by BCU internally.
OR OR GATE- OUTPUT IS 1 WHEN ANY OF THE INPUTS IS 1 10. Independent and identical interlocking/blocking conditions have to be
established for MIMIC and BCU control. For MIMIC control,
interlocking/blocking conditions will be hardware based and established
=1 XOR GATE- OUTPUT IS 1 WHEN INPUTS ARE DIFFERENT
in CRP; for BCU control, they will be software based and established
internally in BCU.
NOT GATE- OUTPUT IS 1 INPUT IS 0 11. LOCAL/REMOTE selector switch in BCU is optional.
CB -QA1 OPEN CONTROL AUTHORITY
TITLE: INTERLOCKING LOGIC OF ALL VOLTAGE GIS SUBSTATION IN DOUBLE SHEET
BUSBAR FOR BUS COUPLER FEEDER (BUS COUPLER-A) 3
STANDARD DOCUMENT
0 09.05.2020 FIRST PREPARATION NUMBER: 64 POWER GRID COMPANY OF BANGLADESH LTD. DOCUMENT ID: A0-DB-G0-BC-IL NEXT SHT 4
REVISION DATE REMARKS
DS -QB1 NORMAL OPEN/CLOSE DS -QB1 MAINTENANCE OPEN/CLOSE
INTERLOCK INTERLOCK
BUS-IA
DS -QB2 NORMAL OPEN/CLOSE DS -QB2 MAINTENANCE OPEN/CLOSE
INTERLOCK INTERLOCK
-QB52A
INTERLOCK SEL. SW BYPASSED INTERLOCK SEL. SW BYPASSED
-BA6A
-QA1 M
C1 C2 C3
BUS COUPLER-A
BUS SECTION-1
-QA1 M
-QC1A -QC1B
-QB1A QB1B
BUS-IA BUS-IB
BUS-2A BUS-2B
-QC1 -QA1 M
-QC2 -QC2A -QA1 M
-QC2B -QC1 -QA1 M
-QC2
LEGENDS: NOTES:
TCS: TRIP CIRCUIT SUPERVISION 1. Logics have to be established in CRP by bringing statuses of all relevant
A/R: AUTO RECLOSE devices; wiring among the switching devices are not allowed.
CA: CONTROL AUTHORITY SWITCH 2. More than one device will not be allowed to move at the same time.
M1FP: MAIN-1 FEEDER PROTECTION RELAY 3. Closing from LCC will be for maintenance purpose only; all CB internal
M2FP: MAIN-2 FEEDER PROTECTION RELAY blocking such as SF6 Stage-1 & 2 alarm, spring discharge etc. will be
BUFP: BACK-UP FEEDER PROTECTION RELAY applicable for such closings.
BCU: BAY CONTROL UNIT 4. CA is a 4 (Four) position switch having the positions of
BCPU: BAY CONTROL & PROTECTION UNIT OFF/MIMIC/BCU/REMOTE which will be installed in CRP.
SAS: SUBSTATION AUTOMATION SYSTEM 5. If BCU/SAS is not available in the substation, the CA will be a 3 (Three)
LCC: LOCAL CONTROL CUBICLE position switch having the positions of OFF/LOCAL/REMOTE which will
be installed in CRP.
6. LOCAL/REMOTE selector switch of LCC, CA (Control Authority) switch
of CRP can be in only one position at any given time.
7. INTERLOCK BYPASS switch will be installed in CRP.
& AND GATE- OUTPUT IS 1 WHEN ALL INPUTS ARE 1
8. For MIMIC CONTROL, Synchrocheck will be performed by M2FP.
9. For BCU CONTROL, Synchrocheck will be performed by BCU internally.
OR OR GATE- OUTPUT IS 1 WHEN ANY OF THE INPUTS IS 1 10. Independent and identical interlocking/blocking conditions have to be
established for MIMIC and BCU control. For MIMIC control,
interlocking/blocking conditions will be hardware based and established
=1 XOR GATE- OUTPUT IS 1 WHEN INPUTS ARE DIFFERENT
in CRP; for BCU control, they will be software based and established
internally in BCU.
NOT GATE- OUTPUT IS 1 INPUT IS 0 11. LOCAL/REMOTE selector switch in BCU is optional.
MOTORIZED DS OPEN/CLOSE LOGICS
BCU SW IN REMOTE
BUS-IA
BCU SW IN LOCAL
OR
CA IN BCU
BUS-2A
CA IN MIMIC
-QC52A M CA IN REMOTE
&
BCU SW IN LOCAL
-QB1 -QB2
-QC1 -QC2
BCU SW IN REMOTE
-QB52A ORDER FROM BCU &
-BA6A
-QA1 M
C1 C2 C3
BUS COUPLER-A
OR
NORMAL CLOSING *) Note-1
ENABLED REMOTE CONTROL &
LOCAL CONTROL
CA IN MIMIC
BUS SECTION-1
CA IN BCU
-QA1 M
CA IN REMOTE &
-QC1A -QC1B OR
ORDER FROM MIMIC
-QB1A QB1B
REMOTE CONTROL
BUS-2A BUS-2B
NORMAL MODE & &
SELECTED
-QB1 -QB2 -QB2A -QB2B -QB1 -QB2
-QC1 -QA1 M
-QC2 -QC2A -QA1 M
-QC2B -QC1 -QA1 M
-QC2 ORDER FROM LCC
LOCAL CONTROL
REMOTE CONTROL
*) Note-9
MAINTENANCE MODE SELECTED
*) Note-5
&
ORDER FROM LCC
COMMAND
MAINTENANCE *) Note-3 & TO DS
OPEN/CLOSE ENABLED
LEGENDS: NOTES:
TCS: TRIP CIRCUIT SUPERVISION 1. Logics have to be established in CRP by bringing statuses of all relevant
A/R: AUTO RECLOSE devices; wiring among the switching devices are not allowed.
CA: CONTROL AUTHORITY SWITCH 2. More than one device will not be allowed to move at the same time.
M1FP: MAIN-1 FEEDER PROTECTION RELAY 3. Closing from LCC will be for maintenance purpose only; all CB internal
M2FP: MAIN-2 FEEDER PROTECTION RELAY blocking such as SF6 Stage-1 & 2 alarm, spring discharge etc. will be
BUFP: BACK-UP FEEDER PROTECTION RELAY applicable for such closings.
BCU: BAY CONTROL UNIT 4. CA is a 4 (Four) position switch having the positions of
BCPU: BAY CONTROL & PROTECTION UNIT OFF/MIMIC/BCU/REMOTE which will be installed in CRP.
SAS: SUBSTATION AUTOMATION SYSTEM 5. If BCU/SAS is not available in the substation, the CA will be a 3 (Three) MECHANICAL INTERLOCK WITH
LCC: LOCAL CONTROL CUBICLE position switch having the positions of OFF/LOCAL/REMOTE which will ADJACENT ES SATISFIED
be installed in CRP. *** DEPENDING UPON
6. LOCAL/REMOTE selector switch of LCC, CA (Control Authority) switch MANUFACTURER'S DESIGN
of CRP can be in only one position at any given time.
7. INTERLOCK BYPASS switch will be installed in CRP.
& AND GATE- OUTPUT IS 1 WHEN ALL INPUTS ARE 1
8. For MIMIC CONTROL, Synchrocheck will be performed by M2FP.
9. For BCU CONTROL, Synchrocheck will be performed by BCU internally.
OR OR GATE- OUTPUT IS 1 WHEN ANY OF THE INPUTS IS 1 10. Independent and identical interlocking/blocking conditions have to be
established for MIMIC and BCU control. For MIMIC control,
interlocking/blocking conditions will be hardware based and established
=1 XOR GATE- OUTPUT IS 1 WHEN INPUTS ARE DIFFERENT
in CRP; for BCU control, they will be software based and established
internally in BCU.
NOT GATE- OUTPUT IS 1 INPUT IS 0 11. LOCAL/REMOTE selector switch in BCU is optional.
MOTORIZED DS CLOSE/OPEN CONTROL AUTHORITY
TITLE: INTERLOCKING LOGIC OF ALL VOLTAGE GIS SUBSTATION IN DOUBLE SHEET
BUSBAR FOR BUS COUPLER FEEDER (BUS COUPLER-A) 5
STANDARD DOCUMENT
0
REVISION
09.05.2020
DATE
FIRST PREPARATION NUMBER: 64 POWER GRID COMPANY OF BANGLADESH LTD. DOCUMENT ID: A0-DB-G0-BC-IL NEXT SHT 6
REMARKS
MANUAL DS -QB51A OPEN/CLOSE MANUAL DS -QB52A OPEN/CLOSE
INTERLOCK INTERLOCK
OPEN/CLOSE OPEN/CLOSE
HSES -QC51A CLOSED HSES -QC52A CLOSED
ENABLED ENABLED
-QB51A
-BA5A
C1 C2 C3 -QC51A M
BUS-IA
BUS-2A
-QC52A M
-QB1 -QB2
-QC1 -QC2
-QB52A
-BA6A
-QA1 M
C1 C2 C3
BUS COUPLER-A
BUS SECTION-1
-QA1 M
-QC1A -QC1B
-QB1A QB1B
BUS-IA BUS-IB
BUS-2A BUS-2B
LEGENDS: NOTES:
TCS: TRIP CIRCUIT SUPERVISION 1. Logics have to be established in CRP by bringing statuses of all relevant
A/R: AUTO RECLOSE devices; wiring among the switching devices are not allowed.
CA: CONTROL AUTHORITY SWITCH 2. More than one device will not be allowed to move at the same time.
M1FP: MAIN-1 FEEDER PROTECTION RELAY 3. Closing from LCC will be for maintenance purpose only; all CB internal
M2FP: MAIN-2 FEEDER PROTECTION RELAY blocking such as SF6 Stage-1 & 2 alarm, spring discharge etc. will be
BUFP: BACK-UP FEEDER PROTECTION RELAY applicable for such closings.
BCU: BAY CONTROL UNIT 4. CA is a 4 (Four) position switch having the positions of
BCPU: BAY CONTROL & PROTECTION UNIT OFF/MIMIC/BCU/REMOTE which will be installed in CRP.
SAS: SUBSTATION AUTOMATION SYSTEM 5. If BCU/SAS is not available in the substation, the CA will be a 3 (Three)
LCC: LOCAL CONTROL CUBICLE position switch having the positions of OFF/LOCAL/REMOTE which will
be installed in CRP.
6. LOCAL/REMOTE selector switch of LCC, CA (Control Authority) switch
of CRP can be in only one position at any given time.
7. INTERLOCK BYPASS switch will be installed in CRP.
& AND GATE- OUTPUT IS 1 WHEN ALL INPUTS ARE 1
8. For MIMIC CONTROL, Synchrocheck will be performed by M2FP.
9. For BCU CONTROL, Synchrocheck will be performed by BCU internally.
OR OR GATE- OUTPUT IS 1 WHEN ANY OF THE INPUTS IS 1 10. Independent and identical interlocking/blocking conditions have to be
established for MIMIC and BCU control. For MIMIC control,
interlocking/blocking conditions will be hardware based and established
=1 XOR GATE- OUTPUT IS 1 WHEN INPUTS ARE DIFFERENT
in CRP; for BCU control, they will be software based and established
internally in BCU.
NOT GATE- OUTPUT IS 1 INPUT IS 0 11. LOCAL/REMOTE selector switch in BCU is optional.
MANUAL DS OPEN/CLOSE LOGICS
-QB51A
-BA5A
C1 C2 C3 -QC51A M
BUS-IA
BUS-2A
-QC52A M
-QB1 -QB2
-QC1 -QC2
-QB52A
-BA6A
-QA1 M
C1 C2 C3
BUS COUPLER-A
BUS SECTION-1
-QA1 M
-QC1A -QC1B
-QB1A QB1B
BUS-IA BUS-IB
BUS-2A BUS-2B
COMMAND
MECHANICAL INTERLOCKS
& TO
SATISFIED
LEGENDS: NOTES: MANUAL DS
TCS: TRIP CIRCUIT SUPERVISION
*** DEPENDING UPON
1. Logics have to be established in CRP by bringing statuses of all relevant
A/R: AUTO RECLOSE devices; wiring among the switching devices are not allowed. MANUFACTURER'S DESIGN
CA: CONTROL AUTHORITY SWITCH 2. More than one device will not be allowed to move at the same time.
M1FP: MAIN-1 FEEDER PROTECTION RELAY 3. Closing from LCC will be for maintenance purpose only; all CB internal
M2FP: MAIN-2 FEEDER PROTECTION RELAY blocking such as SF6 Stage-1 & 2 alarm, spring discharge etc. will be
BUFP: BACK-UP FEEDER PROTECTION RELAY applicable for such closings.
BCU: BAY CONTROL UNIT 4. CA is a 4 (Four) position switch having the positions of
BCPU: BAY CONTROL & PROTECTION UNIT OFF/MIMIC/BCU/REMOTE which will be installed in CRP.
SAS: SUBSTATION AUTOMATION SYSTEM 5. If BCU/SAS is not available in the substation, the CA will be a 3 (Three)
LCC: LOCAL CONTROL CUBICLE position switch having the positions of OFF/LOCAL/REMOTE which will
be installed in CRP. OPEN/CLOSE
6. LOCAL/REMOTE selector switch of LCC, CA (Control Authority) switch ENABLED
of CRP can be in only one position at any given time.
7. INTERLOCK BYPASS switch will be installed in CRP.
& AND GATE- OUTPUT IS 1 WHEN ALL INPUTS ARE 1
8. For MIMIC CONTROL, Synchrocheck will be performed by M2FP.
9. For BCU CONTROL, Synchrocheck will be performed by BCU internally.
OR OR GATE- OUTPUT IS 1 WHEN ANY OF THE INPUTS IS 1 10. Independent and identical interlocking/blocking conditions have to be
established for MIMIC and BCU control. For MIMIC control,
interlocking/blocking conditions will be hardware based and established
=1 XOR GATE- OUTPUT IS 1 WHEN INPUTS ARE DIFFERENT
in CRP; for BCU control, they will be software based and established
internally in BCU.
NOT GATE- OUTPUT IS 1 INPUT IS 0 11. LOCAL/REMOTE selector switch in BCU is optional.
MANUAL DS CLOSE/OPEN CONTROL AUTHORITY
TITLE: INTERLOCKING LOGIC OF ALL VOLTAGE GIS SUBSTATION IN DOUBLE SHEET
BUSBAR FOR BUS COUPLER FEEDER (BUS COUPLER-A) 7
STANDARD DOCUMENT
0
REVISION
09.05.2020
DATE
FIRST PREPARATION NUMBER: 64 POWER GRID COMPANY OF BANGLADESH LTD. DOCUMENT ID: A0-DB-G0-BC-IL NEXT SHT 8
REMARKS
ES -QC1 OPEN/CLOSE ES -QC2 OPEN/CLOSE
INTERLOCK INTERLOCK
-BA5A
-QB1 -QB2
-QC1 -QC2
-QB52A
-BA6A
-QA1 M
C1 C2 C3
BUS COUPLER-A
BUS SECTION-1
-QA1 M
-QC1A -QC1B
-QB1A QB1B
BUS-IA BUS-IB
BUS-2A BUS-2B
-QC1 -QA1 M
-QC2 -QC2A -QA1 M
-QC2B -QC1 -QA1 M
-QC2
LEGENDS: NOTES:
TCS: TRIP CIRCUIT SUPERVISION 1. Logics have to be established in CRP by bringing statuses of all relevant
A/R: AUTO RECLOSE devices; wiring among the switching devices are not allowed.
CA: CONTROL AUTHORITY SWITCH 2. More than one device will not be allowed to move at the same time.
M1FP: MAIN-1 FEEDER PROTECTION RELAY 3. Closing from LCC will be for maintenance purpose only; all CB internal
M2FP: MAIN-2 FEEDER PROTECTION RELAY blocking such as SF6 Stage-1 & 2 alarm, spring discharge etc. will be
BUFP: BACK-UP FEEDER PROTECTION RELAY applicable for such closings.
BCU: BAY CONTROL UNIT 4. CA is a 4 (Four) position switch having the positions of
BCPU: BAY CONTROL & PROTECTION UNIT OFF/MIMIC/BCU/REMOTE which will be installed in CRP.
SAS: SUBSTATION AUTOMATION SYSTEM 5. If BCU/SAS is not available in the substation, the CA will be a 3 (Three)
LCC: LOCAL CONTROL CUBICLE position switch having the positions of OFF/LOCAL/REMOTE which will
be installed in CRP.
6. LOCAL/REMOTE selector switch of LCC, CA (Control Authority) switch
of CRP can be in only one position at any given time.
7. INTERLOCK BYPASS switch will be installed in CRP.
& AND GATE- OUTPUT IS 1 WHEN ALL INPUTS ARE 1
8. For MIMIC CONTROL, Synchrocheck will be performed by M2FP.
9. For BCU CONTROL, Synchrocheck will be performed by BCU internally.
OR OR GATE- OUTPUT IS 1 WHEN ANY OF THE INPUTS IS 1 10. Independent and identical interlocking/blocking conditions have to be
established for MIMIC and BCU control. For MIMIC control,
interlocking/blocking conditions will be hardware based and established
=1 XOR GATE- OUTPUT IS 1 WHEN INPUTS ARE DIFFERENT
in CRP; for BCU control, they will be software based and established
internally in BCU.
11. LOCAL/REMOTE selector switch in BCU is optional.
NOT GATE- OUTPUT IS 1 INPUT IS 0
ES & HSES OPEN/CLOSE LOGICS
-QB51A
-BA5A
C1 C2 C3 -QC51A M
BUS-IA
BUS-2A
-QC52A M
-QB1 -QB2
-QC1 -QC2
-QB52A
-BA6A
-QA1 M
C1 C2 C3
BUS COUPLER-A
BUS SECTION-1
-QA1 M
-QC1A -QC1B
-QB1A QB1B
BUS-IA BUS-IB
BUS-2A BUS-2B
-QC1 -QA1 M
-QC2 -QC2A -QA1 M
-QC2B -QC1 -QA1 M
-QC2
COMMAND
MECHANICAL INTERLOCK
& TO
WITH ADJACENT DS SATISFIED
LEGENDS: NOTES: HSES/ES
TCS: TRIP CIRCUIT SUPERVISION
*** DEPENDING UPON
1. Logics have to be established in CRP by bringing statuses of all relevant
A/R: AUTO RECLOSE devices; wiring among the switching devices are not allowed. MANUFACTURER'S DESIGN
CA: CONTROL AUTHORITY SWITCH 2. More than one device will not be allowed to move at the same time.
M1FP: MAIN-1 FEEDER PROTECTION RELAY 3. Closing from LCC will be for maintenance purpose only; all CB internal
M2FP: MAIN-2 FEEDER PROTECTION RELAY blocking such as SF6 Stage-1 & 2 alarm, spring discharge etc. will be
BUFP: BACK-UP FEEDER PROTECTION RELAY applicable for such closings.
BCU: BAY CONTROL UNIT 4. CA is a 4 (Four) position switch having the positions of
BCPU: BAY CONTROL & PROTECTION UNIT OFF/MIMIC/BCU/REMOTE which will be installed in CRP.
SAS: SUBSTATION AUTOMATION SYSTEM 5. If BCU/SAS is not available in the substation, the CA will be a 3 (Three)
LCC: LOCAL CONTROL CUBICLE position switch having the positions of OFF/LOCAL/REMOTE which will
be installed in CRP. OPEN/CLOSE
6. LOCAL/REMOTE selector switch of LCC, CA (Control Authority) switch ENABLED
of CRP can be in only one position at any given time.
7. INTERLOCK BYPASS switch will be installed in CRP.
& AND GATE- OUTPUT IS 1 WHEN ALL INPUTS ARE 1
8. For MIMIC CONTROL, Synchrocheck will be performed by M2FP.
9. For BCU CONTROL, Synchrocheck will be performed by BCU internally.
OR OR GATE- OUTPUT IS 1 WHEN ANY OF THE INPUTS IS 1 10. Independent and identical interlocking/blocking conditions have to be
established for MIMIC and BCU control. For MIMIC control,
interlocking/blocking conditions will be hardware based and established
=1 XOR GATE- OUTPUT IS 1 WHEN INPUTS ARE DIFFERENT
in CRP; for BCU control, they will be software based and established
internally in BCU.
NOT GATE- OUTPUT IS 1 INPUT IS 0 11. LOCAL/REMOTE selector switch in BCU is optional.
ALL ES & HSES CLOSE/OPEN CONTROL AUTHORITY
TITLE: INTERLOCKING LOGIC OF ALL VOLTAGE GIS SUBSTATION IN DOUBLE SHEET
BUSBAR FOR BUS COUPLER FEEDER (BUS COUPLER-A) 9
STANDARD DOCUMENT
0 09.05.2020 FIRST PREPARATION NUMBER: 64 POWER GRID COMPANY OF BANGLADESH LTD. DOCUMENT ID: A0-DB-G0-BC-IL NEXT SHT N/A
REVISION DATE REMARKS