05 - Excavation, Lowering The Trunk Line & Backfilling Activities.

Uploaded by

ahmedpetrol2018
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views12 pages

05 - Excavation, Lowering The Trunk Line & Backfilling Activities.

Uploaded by

ahmedpetrol2018
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Cairo–HSEQ–P–09

Hazard Identification & Risk Assessment Cairo-HSE-F-16.b


(Non Routine Activities Form) Ref.No.:- DS-05

Job: Excavation, lowering the trunk Assessment team (Names): Risk to: People/Health/Assets/Environment
line& Backfilling activities.
Ahmed Hussein (DSQ Projects HSE)
Location: Phase B pipe lines. Mohamed Fathy (PETROJET HSE) Date: 18/04/2018.

Risk
Risk Potential
Hazard Most serious events & Controls and Preventive Measures Accepted
Activity Hazard Source Causes P H A E ?
ID Consequences (Exist / Needed)
Yes/ No
Technical Controls required:-
-Road Preparation, removal of potential obstacles off-
road.
-Guidance of the truck if required.

Demobilization -Trucks to be inspected & certified.


of equipment E:- Turn-over truck, fall of load , -Reviewing the competence of the driver (have driving
collision of trailer with license)
(1) Other vehicle / Collision with -Avoid Exceeding SWL.
Set up / transfer pedestrians
H-10-S- On Land -Appropriate securing/Balancing/fixing of the load.
of equipment / M - M - Yes
50 Transport
employees C:- -Issuing a PTW & mobile equipment entry certificate.
transportation 1- Major injury. -Not exceed limit speed on roods and drive slowly &
2- Major damage. carefully inside village roads (20 Km/Hr).
- Follow traffic rules out DISOUCO sites.
- Driver to use seat belt.
- All vehicles must have fire extinguisher.
- Avoid driving in adverse weather condition.
- All vehicles must be equipped with reversing alarms.

Next Review: 04/2019 Page 1 of 12


- Provision of first aid kits in the location & Ambulance
to be available near to the work location.

E:- Inaccurate driving - Certified competent driver.


maneuvers / uncontrolled
- Certified competent banks man for directions.
vehicles due to slippery
surface. - Firm Vehicle Access.
Extreme
H 11 –S Environmental - Avoid driving in adverse weather conditions
weather C:- M - M M Yes
62 Hazards (slippery surfaces, high fog, …).
conditions
1- Single Fatality.
2- Major Damage.
3- Short term localized
environmental effect.

E:- Inappropriate
combustion of the trailer
Exhaust fuel. - Mechanical Inspection of the vehicle.
H 22 –S
Toxic Gases fumes from - - - M Yes
115 C:- Minimal environmental - Routine monitoring for exhaust emissions.
the trailer
harm , recoverable
immediately

E:- collapsing of the - Certified & Inspected excavator operator.


excavation / overturn of - Certified excavator operator
Dynamic the excavator inside
- Follow SSOW.
Situation excavation / contact with
H 10 – - Issuing a PTW, excavation & mobile equipment
(2) Hazard underground services (pips
S 61 entry certificate.
Mechanical Excavation & cables) / collision with
& & M M M M - Use of PPE. Yes
Excavation/ activities workers / fall of workers
backfilling Differences in inside excavation / contact - Check area drawing & suitable communication
H-07 –
activites
S 37 Height hazards with underground services with local authorities to avoid collision with
(cables, pipes, .., etic) underground services (cables and pips).
C:- - Coordinate with local authority to isolate
1 Major Injury electrical cables during excavation.
2 Major damage.

Next Review: 04/2019 Page 2 of 12


3 Long term disability. - Manual excavation is a must when approach to
4 Short term localized the underground cables & pips.
effect requiring clean- - Slope the excavation (to be not sharp) to prevent
up. collapsing.
- Restrict the area around the excavator to avoid
collision with labors (Unauthorized personnel are
not permitted to enter all work areas & Workers
cannot be underneath any load handled by digging
or lifting equipment).
- Avoid jump cross over the trenches and a
suitable Walkways equipped with guardrails must
be provided where workers or equipment cross
over excavations
- All personnel have been instructed on safety
working close to trench.
- Assign a competent person to inspect, on a daily
basis, excavations and adjacent areas for possible
cave-ins, failure of protective systems and
equipment, hazardous atmospheres, or other
hazardous conditions and takes prompt corrective
measures to eliminate hazards.
- Apply the basic protective systems for an
excavation and trenches (according to the case):
1- Sloping and Benching Systems
2- Shoring Systems
3- Shields Systems
- Suitable warning signs to be fixed at the
excavated areas.
- Any structure adjacent to an excavation must be
properly supported to prevent collapse.
- Debris on topside of trench is removed from
edge prior to entry (must be placed no closer than
Next Review: 04/2019 Page 3 of 12
2 ft (0.61 m) from the surface edges of the
excavation).
- Clear instruction to be communicated with all
labors that it is forbidden to be available in the
rotation diameter of excavator arm.
- Banning presence of persons inside excavated
trenches during backfilling.
- Availability of suitable pump and tank to be used
in case of sewer spill during excavation.

E:- Inappropriate
Exhaust combustion of the trailer
H 22 –S fumes from fuel.
Toxic Gases - - - M Mechanical Inspection of the equipment. Yes
115 the C:- Minimal environmental
excavator harm , recoverable
immediately

- Competent PTJ technician with regular


monitoring procedures over the activity.
- Suitable PPE should be worn.
E- - Adequate supervision from PTJ while workers
(3) - Employee hand strike by
inside excavation.
hand tools.
Manual
Manual - Excavation cave-in/collapsed - Follow SSOW.
Excavation (if
excavation & while employee inside trench.
required) / - Issuing a PTW, excavation & mobile equipment
H-30-S- Ergonomic presence of - Fall of objects on employees. H/
Cleaning the - - - entry certificate. Yes
198 Hazard employees - Employee getting contact M
bottom of
inside with underground services. - Check area drawing & suitable communication
excavated
trenches - Trips or falls by an obstacle
trenchs with local authorities to avoid getting contact with
inside excavation
C:-
underground services (cables and pips).
(P)Multiply fatality - Slope the excavation (to be not sharp) to prevent
collapsing.
- Provision of safe access and egress if workers
inside the excavated trench.

Next Review: 04/2019 Page 4 of 12


- Avoid jump cross over the trenches and a
suitable walkways equipped with guardrails must
be provided where workers or equipment cross
over excavations.
- All personnel have been instructed on safety
working inside & close to trench.
- Minimum number of personnel are located in the
trench.
- The employees must not have to travel any more
than 25 feet (6-7 m) inside trenches to reach the
stairways, ramps, or ladders.
- a safe distance should be between workers inside
trenches to avoid injuries.
- Adequate ladders are on site to access bottom of
trench (Ladders are used at each end of sections to
provide easy access and egress for personnel.)
- Assign a competent person to inspect, on a daily
basis, excavations and adjacent areas for possible
cave-ins, failure of protective systems and
equipment, hazardous atmospheres, or other
hazardous conditions and takes prompt corrective
measures to eliminate hazards.
- Apply the basic protective systems for an
excavation and trenches (according to the case):
1- Sloping and Benching Systems
2- Shoring Systems
3- Shields Systems
- Suitable warning signs to be fixed at excavated
areas.
- Any structure adjacent to an excavation must be
properly supported to prevent collapse.

Next Review: 04/2019 Page 5 of 12


- Debris on topside of trench is removed from
edge prior to entry (must be placed no closer than
2 ft (0.61 m) from the surface edges of the
excavation).
- Standby person on topside to be trained for
extraction of personnel.
- Clear instruction to be communicated with all
labors that it is forbidden to be available in the
rotation diameter of excavator arm.
- Banning lay down of trunk line inside excavated
trenches while any person still inside it.

- Check area drawing & suitable communication


E:- Employees getting with local authorities to avoid collision with
contact with electrical underground electrical cables.
H 18 – Existence of cables during manual
excavation. - Use suitable insulated hand tools.
S 88, underground
Electricity M - - - Yes
89 & electrical C:- - Wear suitable PPE.
90 cables
- Single Fatality. - Coordinate with local authority to isolate
electrical cables during excavation.

E:- Damage of sewer - Check area drawing & suitable communication


network while employee with local authorities to avoid collision with
inside the trench. underground sewer network.
Existence of
Biological underground C:- - Use suitable insulated hand tools.
H-27 - Immediate Recovery. - L - M Yes
Hazards sewer - Wear suitable PPE.
network - Short term localized effect
- Availability of suitable pump and tank to be used
requiring clean-up.
in case of sewer spill during excavation.

Next Review: 04/2019 Page 6 of 12


- Certified crane/excavator/side boom operator.
- Certified & Inspected crane/excavator/ side
boom.
- Use of appropriate slings, wires, shackles to be
inspected & certified.
- The slings used to lift the pipeline shall be
smooth and large enough to hold the pipes.

E:- Inappropriate lifting or - Slings shall be recovered with full care to


offloading/fall of the load / protect pipes and pipes coating from any
Turn-over of crane or damages.
(4)
excavator / truck, fall of - Laying shall be carried out using adequate
Transportation,
Transportati load , collision of trailer equipment in proper position to avoid stress
Lifting &
lowering the on / Lifting / with crane or excavator / which may damage to the pipes or pipes
Dynamic
trunk line inside H 10 – lowering Collision of load with trailer coating.
the excavated Situation M M M - Yes
S 61 down / collision of the load with
trenches Hazard - Laid pipeline shall fully rest on the trench
Operation labors / damage of pipes /
of trunk line or pipes coating bottom without touching its wall or being
C:- stressed.
1- Major Injury - Safe distance between excavators with each
2- Minor damage. other & Safe distance between excavator &
3- Long term disability. trenches.

- Avoid Exceeding SWL.


- Lifting plan must be in place.
- Follow SSOW (safe System Of Work) Agreed
procedures.
- Appropriate securing/Balancing of the load.
- Issuing a PTW & mobile equipment entry
certificate.

Next Review: 04/2019 Page 7 of 12


- Avoid lifting in high wind/poor visibility
conditions.
- Use tag line during lifting.
- Qualified banks men & agreed signal for
communication between banks man & operator
(driver).
- No one to stand or be available at the diameter
of lifting operation.
- Suitable caution tape to be surrounded the area
of lifting.
- No one set above/near the trunk line while lifting
operation is carried out.
- The lifting equipment (crane/excavator/side
boom) must be equipped by a suitable & inspected
fire extinguisher.
- carry out pre use inspection for the lifting
equipment (crane / excavator / side boom) &
lifting accessories.
- Firm Vehicle Access.
- When the banks man remove the lifting whipper
inside the trench he should be in the opposite
direction of the trunk line.
- Conduct TBT concerning hazards and controls for
lifting operations.
- All lifting equipment, vehicle, tractors &
BYBOLDER to be equipped by reversing alarm
(audible & visual).
- No one to take a rest under trailers or set behind
any movable equipment.
- Adhere to the limit speed on road and follow
traffic rules.

Next Review: 04/2019 Page 8 of 12


- If use excavator for lifting PTJ must provide a
proof test for the welding of anchorage point.
- competent labors should clean the bottom of the
trenches to remove any foreign bodies such as
roots , stones and any hard body that may cause
defect to pipes or pipes coating
- Banning lowering of trunk line inside excavated
trenches while any person still inside it.
- Use suitable PPE for all labors at the site.

E:- Contact between crane - Carrying out suitable survey for all roads and
boom / excavator bucket check the lifting area to avoid contact with
Existence of with electrical overhead overhead electrical cables.
H 18 –
overhead cable
S 88, - Competent crane / excavator / side boom
Electricity electrical M - - - Yes
89 & C:- operator & banks men.
cables while
90
lifting - Single Fatality. - Post a suitable warning sign on the crane /
excavator / side boom to warn from overhead
electrical hazards.

E:- Inaccurate driving - Certified competent driver.


maneuvers / uncontrolled
- Certified competent banks man for directions.
vehicles due to slippery
surface. - Firm Vehicle Access.
Extreme
H 11 –S Environmental C:- - Avoid driving in adverse weather conditions
weather M - M M Yes
62 Hazards (slippery surfaces, high fog, high wind speed,…).
conditions 1- Single Fatality.
2- Serious Damage.
3- Short term localized
environmental effect.

Next Review: 04/2019 Page 9 of 12


E:- Inappropriate
combustion of the engine
fuel for all equipment
Exhaust (crane, excavator, vehicles,
H 22 –S - Mechanical Inspection of all equipment.
Toxic Gases fumes from tractors ,… ,etc.) - - - M Yes
115 - Routine monitoring for exhaust emissions.
the trailer
C:- Minimal environmental
harm , recoverable
immediately

Manual
handling E- Employee hand strike by - Competent PTJ technician with regular
operations, hand tools Or slips, trips &
H-30-S- Ergonomic H/ monitoring procedures over the activity.
incompatible falls by an obstacle. - - - Yes
198 Hazard M - The area to be clear from any obstacles.
hand tools & C:-
physical Major injury - Suitable PPE should be worn.
capability

- Ensure the loads are as close to the body as


possible prior to moving them.
- Minimise twisting, stooping and reaching
movements as far as reasonably practicable.
- Reduce excessive movement of loads by moving
Manual E-
the operation closer to the storage facility (where
handling Employee hand strike by hand possible).
operations tools Or trips & falls by an - Use mechanical assistance – i.e. cranes, hoists,
for obstacle / Disc injuries, trolleys, Fork lift Trucks etc.
(5) General H-30-S- Ergonomic mechanical ligament & tendon injuries, H/ - Ensure operatives involved in prolonged physical
- - - Yes
manual handling 198 Hazard activities, muscular & nerve injuries, M effort are rotated and / or have regular breaks
incompatibl hernias, fractures, abrasions (rest periods).
e hand tools and cuts. - Where possible have the employee dictate the
& physical C:- rate of the process rather than a piece of
Major injury
capability machinery.
- Where possible procurement shall specify
delivery of lower packaged weights.
- Prior to moving the load ensure there is a point
that enables a good grip – i.e. handles, levers lugs
etc.

Next Review: 04/2019 Page 10 of 12


- Ensure the load is free from sharp or rough
edges.
- Ensure the load is stable and will not shift its
centre of gravity suddenly – may require banding
or securing in a box.
- Ensure the load is free from grease or oil.
- Personnel shall wear gloves when handling loads.
- Ensure there are no space constraints, which
impede your safe handling of the load.
- Ensure the floor surface is flat and stable. Any
obstacles shall be removed before moving the
load.
- Where possible reduce the working operation to
a single level.
- Ensure there is sufficient lighting to enable the
load to be moved safely.
- Access routes shall be kept clear at all times.
- All spillages and waste materials shall be cleared
away. High level of housekeeping to be
maintained at all times.
- Do not try to move loads that are outside your
capability – use mechanical assistance or work in
pairs.
- Do not try to move loads that are outside your
capability – use mechanical assistance or work in
pairs.
- Carry out health screening to ensure employees
with previous injuries are not exposed to
unnecessary risks.
- If you are hurt or injured during a manual
handling operation you should seek medical
attention immediately.
- Look over the object, making sure it is not to
heavy or clumsy for good balance.
- Stand close to the load with feet apart for good
balance – one foot alongside the load, one behind.

Next Review: 04/2019 Page 11 of 12


- Bend your knees, straddle the load, keeping your
back as straight as possible. Avoid twisting body.
- Get a good grip on the load and take a deep
breath as this helps to support the spine.
- Lift gradually, straighten your knees and stand.
Use leg muscles and avoid quick jerky movements.
- Competent PTJ technician with regular
monitoring procedures over the activity.
- Care must be exercised by all personnel when
lifting loads greater than 25 Kilogram in weight.
Where possible the load should be shared
between two people.
- Any load exceeding the physical capabilities of
personnel MUST be lifted with the aid of
mechanical equipment.
- Suitable PPE should be worn.

Next Review: 04/2019 Page 12 of 12