Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EEHC DISTRIBUTION MATERIALS SPECIFICATION EDMS 01-300-1
MV Primary Switchgear RTU 24-10-2023
7.6. RTU Testing
Type Test: it should comply the following standards:
o IEC 60255- 4, 5 and 6 and IEC 60255-22.1, 2 and 3. & IEC 61000 - 4 -2 and 3.
Routine Test: the RTU should pass the manufacture’s standard routine tests in accordance
with referenced standard.
7.7. Signal List
Signal List of the RTU is attached.
Signal List of the Switchgear as per EDMS 01-101-1 specification
The Mapping of the signals list will be submitted after approval.
Signal List for DP RTU
Item Signal Description Signal Acquisition Type of Data Point
Status
Main Comm. Link Failure
Backup Comm. Link Failure
RTU Failure
Redundant RTU Failure
Main Time Synchronization Failure
Backup Time Synchronization Failure
CPU 1 Online
CPU 2 Online
RTU
RTU Cabinet DC Supply 1 Loss
Cabinet
RTU Cabinet DC Supply 2 Loss
RTU Cabinet AC Aux Supply Loss
Fail of Power Supply of Rack
DCC Online
Switch ports inactive
RTU Cabinet Local - Remote Indication Hard wired DP
RTU Cabinet Door Opened
Any MCB in RTU Fail
RTU Battery Charger Float Mode Communication
RTU Battery Charger HI-Rate Mode Communication
RTU
RTU Battery Charger AC Loss Communication
Battery
Charger RTU Battery Charger Any MCB Fail Communication
RTU Battery Charger AC over/under
Communication
Voltage
pg. 16
Ministry of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EEHC DISTRIBUTION MATERIALS SPECIFICATION EDMS 01-300-1
MV Primary Switchgear RTU 24-10-2023
RTU Battery Charger Failure Hard wired
RTU Battery Charger DC Low Voltage Communication
RTU Battery Charger Earth Fault Communication
Switchgear Battery Charger Float Mode Communication
Switchgear Battery Charger HI-Rate Mode Communication
Switchgear Switchgear Battery Charger Any MCB Fail Communication
Battery Switchgear Battery Charger Failure Hard wired SP
Charger Switchgear Battery Charger AC Loss Communication
Switchgear Battery Charger Earth Fault Communication
Switchgear Battery Charger DC Low Voltage Communication
DP Entrance Door Open Hard wired SP
DP
Fire Fighting Operate Hard wired SP
Commands
RTU RTU CPU Reset
Measurements
RTU RTU Battery Charger AC Voltage Communication
Battery RTU Battery Charger DC Voltage Communication
Charger RTU Battery Charger DC Current Communication
Switchgear Switchgear Battery Charger AC Voltage Communication
Battery Switchgear Battery Charger DC Voltage Communication
Charger Switchgear Battery Charger DC Current Communication
8. Communication
8.1. General Requirements
The connectivity between the distribution point and the DCC shall be achieved by:
Private Point to Multipoint Radio System (VHF or UHF), as primary path
Using 3G/LTE Data Service with one Telecom Operator, as a backup path. The Telecom
Operator vendor shall be selected depending on the signal strength. The Cellular Router will
be equipped with one SIM card for the selected Operator. Note: SIM card is ….EDC
responsibility.
8.2. Telecom devices
Industrial routers
o The 3G/4G Router shall support LTE with bands (B1, B2, B8, B20, and B28).
o Router should be capable of operating temperature up to 70 C°.
o Router shall support by one SIM card at least.
o The router shall support Ethernet and Fiber optic ports
pg. 17