SAUDI ARAMCO ID/PIEU - 14-May-2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.
00 31-Mar-18
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
Low Voltage (up to 1 kV) Power Cable and Building Wire SATIP-P-104-01 14-May-18 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
1.0 DOCUMENT REVIEW
To be reviewed and approved prior to electrical work at job
1.1 Conduits and Cables Document Review SAIC-P-3004 SAIC-P-3004 RH R site
RECEIVING
2.0
INSPECTION
Cable Storage, Handling,
2.1 and Preservation SAIC-P-3201 SAIC-P-3201 W S Weekly Inspection by Contractor QC
Visual Inspection
Cable Reel Notify SA PID upon receive of shipment.
SAIC-P-3202
2.2 Material Receiving SAIC-P-3202 H W
Visual Inspection for UL / NEC Cable QC personnel to inspect 100% of material received.
Cable Reel
Notify SA PID upon receive of shipment.
Material Receiving
2.3
Visual Inspection for NEC / SASO / IEC
SAIC-P-3203 SAIC-P-3203 H W
QC personnel to inspect 100% of material received.
Unjacketed Wire
Cable Reel Notify SA PID upon receive of shipment.
2.4 Material Receiving SAIC-P-3204 SAIC-P-3204 H W
Visual Inspection for IEC Armored Cable QC personnel to inspect 100% of material received.
Cable Reel
Notify SA PID upon receive of shipment.
Material Receiving
2.5
Visual Inspection for IEC Unarmored
SAIC-P-3205 SAIC-P-3205 H W
QC personnel to inspect 100% of material received.
Cable
Cable Material Receiving
Continuity (Volt-Ohm meter) and insulation resistance
Continuity and Insulation
2.6
Testing (On Cable Reel) for Power &
SATR-P-3201 SATR-P-3201 H W (Megger) testing. SA to witness 1 of every 10 LV cable
reel tests.
Control Cable
Cable Material Receiving
Continuity (Volt-Ohm meter) and insulation resistance
Continuity and Insulation
2.7
Testing (On Cable Reel) for
SATR-P-3202 SATR-P-3202 H W (Megger) testing. SA to witness 1 of every 10 LV cable
reel tests.
Building Wire
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU - 14-May-2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
Low Voltage (up to 1 kV) Power Cable and Building Wire SATIP-P-104-01 14-May-18 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Cable Accessories
2.8 Material Receiving SAIC-P-3206 SAIC-P-3206 H W See GENERAL NOTES for typical accessories.
Visual Inspection
3.0 INSTALLATION
Cable Pulling
SA PID shall be notified on start of this activity for each
3.1 Visual Inspection for Power & Control SAIC-P-3207 SAIC-P-3207 H W process system, and plant area.
Cable
Cable Pulling
SA PID shall be notified on start of this activity for each
3.2 Visual Inspection for Building Wire SAIC-P-3208 SAIC-P-3208 H W process system, and plant area.
(Circuit)
Direct Buried
Cable Trench See SATIP-P-104-07 Below Grade Conduit and Duct
3.3
Visual Inspection
SAIC-P-3333 SAIC-P-3333 H W Bank.
(Before Cable Laying)
Below Grade Cable Laying
and Warning Marker Installation Hold points for all direct buried LV cables prior to
3.4
Visual Inspection for Power & Control
SAIC-P-3207 SAIC-P-3207 H W backfilling of cable and safety warning markers.
Cable
Below Grade Cable Laying
and Warning Marker Installation Hold points for all direct buried LV cables prior to
3.5
Visual Inspection for Identification and
SAIC-P-3333 SAIC-P-3333 H W backfilling of cable and safety warning markers.
Backfilling
Cable dressing and termination work (inside cabinet) shall
not proceed until all cable glands, cable route and cable
Cable Gland Installation, Cable Dressing,
dressing in tray has been inspected by Contractor QC.
Cable Identification and Termination
3.6
Visual Inspection for Power & Control
SAIC-P-3207 SAIC-P-3207 H W SA PID shall be notified on termination of first ten circuits
of each voltage service level. SA PID shall be notified on
Cable
start of this activity for each process system and plant
area.
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU - 14-May-2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
Low Voltage (up to 1 kV) Power Cable and Building Wire SATIP-P-104-01 14-May-18 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Cable dressing and termination work (inside cabinet) shall
not proceed until all cable glands, cable route and cable
Cable Gland Installation, Cable Dressing,
dressing in tray has been inspected by Contractor QC.
Cable Identification and Termination
3.7
Visual Inspection for Building Wire
SAIC-P-3208 SAIC-P-3208 H W SA PID shall be notified on termination of first ten circuits
of each voltage service level. SA PID shall be notified on
(Circuit)
start of this activity for each process system and plant
area.
4.0 PRE-COMMISSIONING
Cable Continuity and Insulation Continuity (Volt-Ohm meter) and insulation resistance
4.1 Testing (Installed Cable) SATR-P-3203 SATR-P-3203 H W (Megger) testing. SA to witness 1 of every 10 LV cable
for Power & Control Cable tests.
Cable Continuity and Insulation Continuity (Volt-Ohm meter) and insulation resistance
4.2 Testing (Installed Cable) SATR-P-3204 SATR-P-3204 H W (Megger) testing. SA to witness 1 of every 10 LV cable
for Building Wire tests.
Contractor QC Inspector to witness torque testing on
Cable Termination
4.3
Torque Testing for Power & Control Cable
SATR-P-3205 SATR-P-3205 H W 100% of all power terminations. SA PID to witness 1 of
every 10 LV power cable termination torque tests.
Contractor QC Inspector to witness torque testing on
Cable Termination
4.4
Torque Testing for Building Wire
SATR-P-3206 SATR-P-3206 H W 100% of all power terminations. SA PID to witness 1 of
every 10 LV power cable termination torque tests.
SA PID to inspect 1 of every 10 sealing installation
Cable / Gland / Conduit completed.
4.5
Hazardous Location Sealing
SAIC-P-3209 SAIC-P-3209 H W
QC personnel to inspect 100% of the sealing installation.
Cable / Circuit
4.6 Final Visual Inspection for Power & SAIC-P-3207 SAIC-P-3207 H H Hold point for energization of each power circuit.
Control Cable
Cable / Circuit
4.7 Final Visual Inspection for Building Wire SAIC-P-3208 SAIC-P-3208 H H Hold point for energization of each power circuit.
(Circuit)
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU - 14-May-2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
Low Voltage (up to 1 kV) Power Cable and Building Wire SATIP-P-104-01 14-May-18 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1
of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative
4
in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
Cable accessories include cable pulling lubricant; cable gland connector fittings, hot and cold shrink insulation tubing; electrical tape; cable straps and ties; crimp wire connectors; cable termination kits;
6
bulk terminal blocks and points; bulk electrical nuts, bolts and washers; crimping tools & dies; weather-proof cable and duct seal, hazardous location damming fiber and cement.
LEGEND
H Hold Point fo QC Inspector / Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Survillance I 100% Contractor Inspection
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU - 14-May-2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018)
Saudi Aramco: Company General Use
Rev. 2018.03.00
###
Saudi Aramco: Company General Use
###
Saudi Aramco: Company General Use
### ###
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU - 14-May-2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018)
Saudi Aramco: Company General Use
Rev. 2018.03.00
###
Saudi Aramco: Company General Use
###
Saudi Aramco: Company General Use
### ###
Saudi Aramco: Company General Use