0% found this document useful (0 votes)
209 views4 pages

Tag Engineering MNHR Manual

Uploaded by

Hamza Qayyum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
209 views4 pages

Tag Engineering MNHR Manual

Uploaded by

Hamza Qayyum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

STANDARD MANHOURS FOR BUILDING & EXTERNAL WORKS

Item Description Unit MHR/UNIT REMARKS

support
Direct
to
Hire
Subcon

1 SITE CLEARANCE:
a Site clearnce m2 0.15

2 DEMOLITION:

a Demolition of Concrete Structures (Manually) m3 30.00

Demolition of Concrete Structures


m3 20.00
(Machinery- Jack hammer)
Demolition of Concrete Structures
b m3 6.00
(Machinery- Hydraulic Breaker)

Demolition of Concrete Structures (Manually) m2 12.00

Demolition of Concrete Structures


m2 8.00
(Machinery- Jack hammer)
Demolition of Concrete Structures
m2 2.40
(Machinery- Hydraulic Breaker)

3 EXCAVATION:
General excavation inordinary soil m3 0.20
General excavation rocky soil m3 0.40
Structural / Trench Excavation
Exacavation in soft soil ( sand ) Manually
a m3 8.00
upto 1.5M
Exacavation in soft soil ( fractured rock)
b m3 20.00
Manually upto 1.5 M
Exacavation in fractured rock (Machinery)
c m3 0.80
upto 1.5M
Exacavation in hard rock (Machinery) upto
d m3 1.20
1.5M

4 DISPOSAL:
a Disposal upto 60 KM m3 0.10

5 BACK FILLING:
General Backfil m3 0.20

m3 2.80
a Back Filling with selected suitable material

b Back filling with Imported fill material (0 to m 3


2.80
75 mm )

6 TERMITE PROOFING:
a Termite Proofing m2 3.00

7 CONCRETE:
a Lean Concrete m3 6.00
b Sub Structure Concrete m3 7.00
c Super -structure Concrete m3 8.00
d Concrete around pipe surround m3 6.00
e Concrete in Man holes m3 8.00
f Concrete for Dome m3 25.00
g Concrete for Minarete m3 25.00

8 REBAR:
a Reinforcement (8 mm to 40 mm) MT 50.00
b Wire mesh (A252 to A-194) MT 30.00
c Reinforcement for Minarate MT 80.00
d Reinforcement for Dome MT 80.00

9 FORM WORK:
a Formwork- substructure m2 6.00
b Form work-super structure m2 8.00
c Form work for Domb m2 25.00
d Form work for Minarete m2 25.00
e False work m2 3.00
10 WATER PROOFING:
a 1000 gauge polythene sheets m2 0.20
b 3 coats of Bitumen Paint m2 0.60
c 4 mm thick Asphalt protection board m2 0.40
4 mm thick water proofing membrane with m2 1.25
d bitumen primer
1.5 mm thick self adhesive water proofing m2 0.50
e membrane
STANDARD MANHOURS FOR BUILDING & EXTERNAL WORKS
Item Description Unit MHR/UNIT REMARKS

11 EXPANSION JOINT:
a Joint Sealent m 1.25
b Filler Board m2 0.50
c Thermopol Sheet m2 0.50

12 ROOFING:
a 50mm thick cement sand screed m2 1.50
b 3 Coats Primer Coat m2 0.60
4mm th. torch applied waterproofing
m2
c membrance 0.75
50mm thick extruded polystyrene insulation
m2
d board 0.20
e 1000 gauge polythene seperation sheet m2 0.10
f 50mm thick sand layer m2 0.21
Water Proofing membrane for Vertical m 0.50
g surfaces
h 40x40mm bitumen angle fillet m 0.50
i Aluminium flashing, m 0.75
Extra-over waterproofing system for forming
No
j roof outlet. 5.00
Support to Subcontractor for complete
m2
roofing works 1.25

13 BLOCK WORK
a Hollow Block work m2 2.50
b Solid Block work m2 2.50
c 50 mm thick insulation m2 0.50
Support to Subcon m2 0.25

14 PLASTER:
a Internal Plaster m2 3.00 0.05
b External Plaster m2 3.00 0.25
c Internal Plaster m2 0.25
d External Plaster m2 0.25

15 PAINT:
a Internal Paint m2 1.00 0.25
b External Paint m2 1.00 0.25
c Internal Paint m2 0.25
d External Paint m2 0.25

16 FLOORING:
a Ceramic Tiles m2 3.00 0.25
b Porceliein Tiles m2 3.50 0.25
c Marble m2 3.50 0.25
d Granite m2 3.50 0.25
e Terrazo tiles m2 3.00 0.25
f Carpet m2 0.25 0.05
g Wood work m2 4.00 0.25
h Rubberized anti flooring m2 2.50 0.20
i Concrete Hardner m2 2.00 0.20
j Raised flooring m2 5.00 1.00
k Vinyl flooring m2 2.00 0.20
17 WALLS & STAIRS FINISHES:
a Ceramic Tiles m2 3.00 0.25
b Porceliein Tiles m2 3.50 0.25
c Marble m2 3.50 0.25
d Granite m2 3.50 0.25
e Terrazo tiles m2 3.00 0.25
g Wood work m2 4 to 10 0.25
h Tread m2 3.50 0.25
i Risers m 3.50 0.25

18 SKIRTING:
a Ceramic Tiles m 0.50 0.10
b Porceliein Tiles m 0.50 0.10
c Marble m 0.50 0.10
d Granite m 0.50 0.10
e Terrazo tiles m 0.50 0.10
f Wood work m 0.50 0.10
STANDARD MANHOURS FOR BUILDING & EXTERNAL WORKS
Item Description Unit MHR/UNIT REMARKS

19 CEILING:
a Gypsum Board Ceiling m2 2.00 0.50

600 x 600 mm Aluminium tile ceiling with


insulation (rock wool bags), fixed on exposed m 2
3.00 0.25
b 'T' grid suspension system.
Wood fiber Acoustic false ceiling, fixed on m2 3.00 0.25
c galvanized steel suspension system
d Dome finishes m2 6.00 1.00
e Hilal at dome No 160.00 100.00

20 CARPENTARY:
a Wooden doors (fabrication + erection) m2 8.00 0.50
b Wooden windows m2 8.00 0.50
c Kitchen Cabinets m 8.00 0.50
d Shoe Rack m2 6.00 0.10
e Book shelves m2 6.00 0.10

21 STEEL & METAL WORK:


a Aluminium Doors m2 0.50
b Aluminium Windows m2 0.50
c Steel doors m2 0.50
d Steel Structure MT 100-120 10.00
e Steel Gate Ton 200.00 2.00
f Glass doors Ton 200.00 0.50
g Hand Rail Ton 200.00 0.50
h Man hole cover No 8.00 1.00
22 G.R.C & Mashrabia:
a GRC mashrabia m2 5.00
b Wooden mashrabia m2 5.00
c Aluminium composite panel m2 5.00

23 Hard Land Scaping :


100x200x60mm & 80mm thick Interlock
m2 0.75 0.10
a tiles

m3
b Sand Bedding 50mm Thick for interlocks
c Kerb stone m 0.50 0.10

24 Soft Land scaping:


a Grass m2 0.25 0.05
b Sweet Soil Filling m3 2.80 0.25
c Irrigation m2 2.50 0.25
d Palm Trees 2 M High No 20.00 2.00
e Palm Trees 4 M High No 25.00 2.00

25 Road: m2 1.00
a Sub grade formation m2 0.10
b 200mm granulr base course m3 0.50
c Prime Coat m2 0.10
d Asphalt base coarse m2 0.20
e Tack Coat m2 0.10
f Asphalt wearing coarse m2 0.20

26 Parking Shades:
a Shades m2 3.00 0.50
STANDARD MANHOURS FOR BUILDING & EXTERNAL WORKS
Item Description Unit MHR/UNIT REMARKS
STANDARD MANHOURS FOR PIPE LAYING & JOINTING
Sr no Description Unit Pipes
Depth: 0 to 3 M Concrete D.I CS SS Copper HDPE UPVC ESVC
1 150 mm dia M 4.00 3.00 3.00 3.00 2.00 1.50 1.50 1.50
2 200 mm dia M 5.33 4.00 4.00 4.00 2.67 2.00 2.00 2.00
3 250 mm dia M 6.67 5.00 5.00 5.00 - 2.50 2.50 2.50
4 300 mm dia M 8.00 6.00 6.00 6.00 - 3.00 3.00 3.00
5 350 mm dia M 9.33 7.00 7.00 7.00 - 3.50 3.50 3.50
6 400 mm dia M 10.67 8.00 8.00 8.00 - 4.00 4.00 4.00
7 450 mm dia M 12.00 9.00 9.00 9.00 - 4.50 4.50 4.50
8 500 mm dia M 13.33 10.00 10.00 10.00 - 5.00 5.00 5.00
9 600 mm dia M 16.00 12.00 12.00 12.00 - 6.00 6.00 6.00
10 700 mm dia M 18.67 14.00 14.00 14.00 - 7.00 7.00 7.00
11 800 mm dia M 21.33 16.00 16.00 16.00 - 8.00 8.00 8.00
12 900 mm dia M 24.00 18.00 18.00 18.00 - 9.00 9.00 9.00
13 1000 mm dia M 26.67 20.00 20.00 20.00 - 10.00 10.00 10.00
14 1200 mm dia M 32.00 24.00 24.00 24.00 - 12.00 12.00 12.00
15 1500 mm dia M 40.00 30.00 30.00 30.00 - 15.00 15.00 15.00
16 2000 mm dia M 53.33 40.00 40.00 40.00 - 20.00 20.00 20.00
17 2400 mm dia M 64.00 48.00 48.00 48.00 - 24.00 24.00 24.00
18 3000 mm dia M 80.00 60.00 60.00 60.00 - 30.00 30.00 30.00

Depth: 3 to 6 M
1 150 mm dia M 6.00 5.00 5.00 5.00 4.00 3.00 3.00 3.00
2 200 mm dia M 8.00 6.67 6.67 6.67 5.33 4.00 4.00 4.00
3 250 mm dia M 10.00 8.33 8.33 8.33 - 5.00 5.00 5.00
4 300 mm dia M 12.00 10.00 10.00 10.00 - 6.00 6.00 6.00
5 350 mm dia M 14.00 11.67 11.67 11.67 - 7.00 7.00 7.00
6 400 mm dia M 16.00 13.33 13.33 13.33 - 8.00 8.00 8.00
7 450 mm dia M 18.00 15.00 15.00 15.00 - 9.00 9.00 9.00
8 500 mm dia M 20.00 16.67 16.67 16.67 - 10.00 10.00 10.00
9 600 mm dia M 24.00 20.00 20.00 20.00 - 12.00 12.00 12.00
10 700 mm dia M 28.00 23.33 23.33 23.33 - 14.00 14.00 14.00
11 800 mm dia M 32.00 26.67 26.67 26.67 - 16.00 16.00 16.00
12 900 mm dia M 36.00 30.00 30.00 30.00 - 18.00 18.00 18.00
13 1000 mm dia M 40.00 33.33 33.33 33.33 - 20.00 20.00 20.00
14 1200 mm dia M 48.00 40.00 40.00 40.00 - 24.00 24.00 24.00
15 1500 mm dia M 60.00 50.00 50.00 50.00 - 30.00 30.00 30.00
16 2000 mm dia M 80.00 66.67 66.67 66.67 - 40.00 40.00 40.00
17 2400 mm dia M 96.00 80.00 80.00 80.00 - 48.00 48.00 48.00
18 3000 mm dia M 120.00 100.00 100.00 100.00 - 60.00 60.00 60.00

Depth: 6 to 10 M
1 150 mm dia M 8.00 7.00 7.00 7.00 6.00 4.50 4.50 4.50
2 200 mm dia M 10.67 9.33 9.33 9.33 8.00 6.00 6.00 6.00
3 250 mm dia M 13.33 11.67 11.67 11.67 - 7.50 7.50 7.50
4 300 mm dia M 16.00 14.00 14.00 14.00 - 9.00 9.00 9.00
5 350 mm dia M 18.67 16.33 16.33 16.33 - 10.50 10.50 10.50
6 400 mm dia M 21.33 18.67 18.67 18.67 - 12.00 12.00 12.00
7 450 mm dia M 24.00 21.00 21.00 21.00 - 13.50 13.50 13.50
8 500 mm dia M 26.67 23.33 23.33 23.33 - 15.00 15.00 15.00
9 600 mm dia M 32.00 28.00 28.00 28.00 - 18.00 18.00 18.00
10 700 mm dia M 37.33 32.67 32.67 32.67 - 21.00 21.00 21.00
11 800 mm dia M 42.67 37.33 37.33 37.33 - 24.00 24.00 24.00
12 900 mm dia M 48.00 42.00 42.00 42.00 - 27.00 27.00 27.00
13 1000 mm dia M 53.33 46.67 46.67 46.67 - 30.00 30.00 30.00
14 1200 mm dia M 64.00 56.00 56.00 56.00 - 36.00 36.00 36.00
15 1500 mm dia M 80.00 70.00 70.00 70.00 - 45.00 45.00 45.00
16 2000 mm dia M 106.67 93.33 93.33 93.33 - 60.00 60.00 60.00
17 2400 mm dia M 128.00 112.00 112.00 112.00 - 72.00 72.00 72.00
18 3000 mm dia M 160.00 140.00 140.00 140.00 - 90.00 90.00 90.00