BOM Structural EPP
BOM Structural EPP
4
BOM PREPARED BY: JSP Date 9/21/23 10/4/24
Project No: 251427 CHECKED BY: FVB Date
Concrete and Steel Quantities
Ridgeline, HARTSVILLE COMPRESSOR STATION. BOM Rev. 0 Rev. 1 Rev. 2 Rev. 3 Rev. 4
BOM PREPARED BY: JSP Date 9/21/23 10/4/24
Project No: 251427 CHECKED BY: FVB Date
Concrete and Steel Quantities
Notes:1- Preliminary quantities and estimated with final 3DModel and plot plan.
2-Excavation not considered and will be defined in accordance with final equipment information.
Specific Description Unit Description Count Width Length Thk Adj Material Material Notes
Concrete Foundation, Piers, Grade Beams,
Slab, Pad, or Curb Measure ft ft ft ft3 yd3
Grout ft ft ft ft3 ft3
Anchor Bolts qty per Count
Piles qty per Count
Rebar/Steel CY (SF) pcy or psf 1.15 lbs TN Conc -lb/CY, (CMU lb/SF)
Grout 1" Grout CF Grouting 49 1.00 1.00 0.08 1.00 4.1 4.1
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
DRILLED PIERS
0
Volume Comments
SF 82.71 CY
SF 2.15 CY
SF 19.05 CY
SF 5.31 CY
SF 68.54 CY
SF 10.5 CY
Volume Comments
2.4 CY
U Drain slab
2.56 CY
1.56 CY
1.56 CY
1.56 CY
3.26 CY
3.26 CY
3.26 CY
3.26 CY
3.26 CY
3.38 CY
3.44 CY
3.45 CY
3.45 CY
4.72 CY
4.72 CY
5.73 CY
5.73 CY
6.03 CY
7.01 CY
7.01 CY
7.01 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
1.11 CY
Area Volume
8185.789 SF 303.18 CY
438.238 SF 40.58 CY
357.294 SF 46.32 CY
390.07 CY
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"
WOOD-CONCRE
2'-5" 6"