Anchoring Procedure
Anchoring Procedure
knowledgeofsea.com/anchoring-procedure
The anchors of the ship are like claws and their function is to hold on to the seabed so
that the ship stays in one place and not drift under the influence of winds or currents.
The engine room staff attends fo the main engines and other equipment. The and Master
is on the bridge usually being guided by a pilot assisted by a helms man and another
officer. Tugs may be required to push/pull/nudge and to cajole the ship o desired angles
and positions.
1/11
Brighten Up Again When
Lugged Shackle
Anchor Chain
Anchor chain Depending on the size of the ship, mainly its length, the bower anchors will
be fitted with anchor chains of certain lengths. A medium size ship 15000 DWT would
generally have 10 shackles. (1 shackles=15 fathoms=27.4 m).
A VLCC may have up to 15 shackles (410.00 m). One end of the chain is secured in the
chain locker and is called the “BITTER END”. On the other end is a `D’ type shackle
attached to the bower anchor. The ‘bitter end’ will be secured such that in an emergency
it can be released quickly to let go the whole anchor chain.
Kenter Shackle
2/11
A LUGLESS JOINING SHACKLE TOP SWAGE AND REAMER
The prime mover could be an electric motor or even steam/hydraulic type; the two (port
&starboard) ‘gypsies’ heave or lower the cable. The gypsy will rotate freely and pay out
cable to anchor a ship. The gypsy gear has to be engaged to heave up the anchor. The
warping drums will rotate with the gypsy in gear or with the gypsy gear disengaged.
A bow stopper arrangement between the windlass ‘gypsy’ and hawse pipe holds the
cable mechanically to take the strain off the brakes when the vessel is riding on her
anchor.
Additionally precautions have to be taken to avoid sea waves and water entering the
chain lockers.
3/11
Following is a step-by-step method recommended for securing the anchors after
they are hove up tight: –
a) Ensure that the windlass brake is tightly secured. The bow stopper is placed in position
and the windlass is out of gear.
b) Reave the anchor lashing steel wire rope through one of the chain links or alternatively
place the devil’s claw on the cable.
c) If the wire is used connect bottle screw and screw the bottle screw up tightly.
d) Put the hawse pipe and spurting pipe steel plate covers in position.
f) The spurting pipe must be additionally coated with a good protective coat.
► Ensure that a spike, small hammer, sledge hammer, crowbar, can filled with Lub
oil,goggles and a torch (at night) are near the windlass area.
► Turn the windlass over slowly to a position. Where the gears can be engaged.
► Put one anchor in gear and turn windlass ‘in’ to take the weight of the anchor.
4/11
► Open the brake.
► The windlass gear in now engaged. You can now lower the anchor out of the hawse
pipe to the water level if required.
► When ordered to lower, lower the anchor slowly clear of the hawse pipe.
► Screw brake tightly home, turn windlass such as to take the weight of the anchor on to
the brakes only.
► Take the windlass out of gear. The anchor is now ready to let go by releasing the
brake.
Case 1
A loaded ship on passage from Holland met with heavy weather in the English Channel.
The canvas covers to the spurting pipes were torn away and the chain locker and
forecastle store became flooded. The ship being already down by the head the additional
flooding was sufficient to bring the weather deck under water thereby placing the air pipes
and subsequently the cargo hatchways in jeopardy. Progressive flooding occurred and
eventually the ship was lost.
Case 2
The second ship also outward bound from Holland encountered heavy seas, which were
sufficient to break the cement, which had plugged the starboard spurting pipe. Seawater
thus gained access to the chain locker and the forward stores space producing trim by
the head and bringing the foredeck awash. Fortunately, the Master took early action and
returned to port where the spurling pipes were re-cemented.
In the first case the mere fitting of canvas around the spurting pipes was not sufficient but
had close lifting supported the canvas steel plates or a more efficient means of preventing
the ingress of water provided the casualty would have been avoided. The second case
showed that the quantity of cement used must be adequate not only to plug the spurling
pipes but also to prevent lateral movement of the cable within them.
Cable markings
5/11
When anchoring, it is important to know how much cable has run out. The chain is
therefore marked at each joining shackle. First shackle is marked by a piece of seizing
wire, flexible and thin galvanised iron wire, on the first studded link on both sides of the
shackle.
Second shackle is marked by a piece of seizing wire on the second studded link on both
sides of the shackle.
Third shackle is marked by a piece of seizing wire on the third studded link on both sides
of the shackle, and so upto the last shackle. in addition, since the seizing wire markings
cannot be easily seen at night, a system of marking by white paint is also employed.
Different ships have different systems. For example, some ships paint all the joining
shackles and the links, which have seizing wire marking. Whereas other ships do not
paint the joining shackle at all but paint all the studded links on both sides of the shackle,
upto the links which have seizing wire markings.
6/11
The following are a few of the expressions used in anchoring and as assistant to the
officers who may be in charge of the forecastle cable-party you will do well to acquaint
yourselves with all of them, for misunderstood order from the bridge may give rise to
some undiplomatic language.
Term Meaning
Lee tide A tidal stream which is setting to leeward or downwind. The water
surface has minimum of chop on it, but the combined forces of wind
and tide are acting upon the ship.
Weather tide A tidal stream which is setting to windward or upwind. The water
surface is very choppy, but the forces of wind and tide are acting in
opposition on the ship
Growing The way the cable is leading from the hawse pipe, e.g. a cable is
growing aft when it leads aft.
Short stay A cable le is at short stay when it is taut and leading down to the water
close to the vertical.
Long stay A cable is at long stay when it is taut and leading down to the water
close to the horizontal.
Come to, These are used when a vessel is holding to her anchor and the cables.
Brought up,
Got her Cable
Snub the To stop the cable running out by using the brake on the windlass.
Cable
Range the To lay out the cable on deck, or wharf, or in a dry dock etc
cable
Veer the Walk back or to pay out cable using the windlass motor.
cable
Surge cable To allow cable to run out freshly, without using the brake or the
windlass motor.
The Anchor
Term Meaning
7/11
Term Meaning
A cockbill Used to describe the anchor which has been lowered clear of the hawse
pipe and is hanging vertically
Up and The cable is up and down when it is leading vertically to the water.
down
Foul When both anchors are out and the cables are entwined or crossed.
hawse
Open When both anchors are out and the cables lead broad out on their own
hawse bows
Clearing Anchors and cables are cleared away when the securing gear on deck is
anchors removed.
Nipped The cable is nipped when an obstruction, such as stem or hawse-pipe lip,
cable causes it to change direction sharply.
Render The cable is rendered when the brake is loosely applied so that the cable
cable runs out slowly.
► Take to the forecastle head a spike, hammer, crowbar, oilcan, goggles portable VHF
set and at night a torch.
► Take off the hawse pipe covers. Let go the lashing in the chain locker.
► Make sure that the brakes are on and the windlass is out of gear.
► Turn the windlass over slowly and oil the moving parts. On a steam windlass, the drain
cocks must all be opened to drain the water. The cocks may then be closed again.
► Put one anchor in gear. (See that gears are clear to engage first)
► Remove the compressor bar and the cement and the covers or other filling from the
spurting pipe.
► Make sure that the weight of the anchor is held by the brake and that the gears
although in, are clear. Take out of gear.
► Prepare the other anchor using the same routine. (5, 6 & 7). 10.
8/11
► Inform the Officer concerned and the bridge on VHF that the anchors are ready for
lowering clear of the hawse pipe.
► When ordered to lower away by the Officer, take off brakes and lower slowly until the
anchor is out of the hawse pipe.
One man to strike the bell to indicate the number of shackles that have gone out. e.g. first
shackle, 1 bell, sixth Shackles, 6 bells, etc.
When sufficient cable has been paid out and when the cable is riding easy the ship is
“brought up”. Inform the bridge. Put on the compressor bar and screw the brake tightly
home, Hoist the anchor ball or anchor lights.Return the gear to the store.
► Take to the forecastle head a hammer or crowbar, hose, oilcan, VHF portable set and
at night a torch. Couple up the hose to the deck hydrant, lead it to the hawse pipe and
open the hydrant. (A number of ships have built in arrangement for washing the cable as
9/11
it is hove in.)
► Make sure the windlass is out of gear and the brakes are on.
► Turn windlass over slowly and oil the moving arts. On a steam windlass the drain
cocks must all be opened and the water allowed to drain before the cocks are closed
again.
► Put the anchor in gear (see that the gears are clear to engage.)
► Send a man to the chain locker with a light. He shall ensure that the cable is lying clear
and there is no other obstruction in the chain locker.
► Remove the compressor bar and when ordered to do so, take off the breaks and
commence heaving in the cable. See that the hose is running and have a man to wash
the cables as it comes in. Inform the man in the locker that you are about to heave away.
He shall arrange the cables so that they fall in a heap. Another man should stand by the
bell to ring the shackles as they come in. Inform the bridge the status of the cable on
VHF.
► When the anchor is aweigh i.e. the anchor is off the ground and the cable is vertical
take down the anchor ball or anchor light and ring the bell rapidly to indicate that the
anchor is aweigh.
► When the anchor is hove home, inform the man in the locker. He shall now come out of
the chain locker and inform the officer in charge that he has come out. This precaution is
necessary or else the man may have suffered injury and it would not be noticed. Apply
the brake tightly and insert the compressor bar. Ease the gears and take the windlass out
of gear. Stop the water, close the cock and uncouple the hose. Return the gear.
Accident prevention
► Be sure the brake is tightly home and the gears eased before taking the windlass out
of gear.
10/11
► When it is necessary to let go an anchor or pay out cable and a man is in the locker
(as might happen when mooring) The order “Stand clear in the locker” must be given,
replied to and carried out before the anchor or cable is allowed to run out.
11/11