PP Initial Data Required
PP Initial Data Required
DESCRIPTION SPECIFICATIONS
1 Gross Power ______ MW
Net Power ______ MW
5 Connectivity with National Grid Island / Synched Mode Operation; However synchronization
with National Grid required for switch Over only
In house Grid Capacity Not Available
WAPDA Connection D-1 / D-2 / D-3 ( 4.9 MW )
6 Boiler Fuel Local / Indonesian / South Africa / Afghan Coal ( Bituminous)
Biomass / RDF / Mixing (Designer proposes fuel mixing ratio)
7 Electricity Generation Voltage 11 KV / 3 Ph / 50 Hz
8 Motors Parameters 415 V, High Efficiency IE2 Class, Ambient Temp. 45 ᵒC,
Compatible with VFD application, Class- F Insulation, Service
Factor 1.15, suitable for high torque where required.
9 Motor’s Control System VFD Type with low pass filters & line reactor
12 Latitude & Longitude __________ ᵒN, __________ ᵒE, _______ M above sea level
Major Sections:
- Boiler Section - Turbine House - Coal & Lime Handling - Ash & Slag Handling
- Water & De-min - Cooling Water - Electrical & Controls - Fire Fighting