Data Required for the Power Plant

Uploaded by

Muhammad Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views1 page

PP Initial Data Required

Data Required for the Power Plant

Uploaded by

Muhammad Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

POWER PLANT --- TECHNICAL SYNOPSIS

DESCRIPTION SPECIFICATIONS
1 Gross Power ______ MW
Net Power ______ MW

2 Plant Configuration 2 Nos. of Boilers, _______ T/H ( Designer will propose ),


Pressure 53 Bar g, Temp. 485°C, Turn Down Ratio 40%
1 No. of ______MW Turbo-Alternator
3 Type of Boiler CFB / Corner Tube / Chain Grade / Stroke Type
Type of Turbine Extraction Condensing / Extraction / Back Pressure
Impulse / Reaction Type
4 Process Heating Steam ___ T/H at 14 Bar g, 200 °C, 100 % Controlled / Bleeding

5 Connectivity with National Grid Island / Synched Mode Operation; However synchronization
with National Grid required for switch Over only
In house Grid Capacity Not Available
WAPDA Connection D-1 / D-2 / D-3 ( 4.9 MW )
6 Boiler Fuel Local / Indonesian / South Africa / Afghan Coal ( Bituminous)
Biomass / RDF / Mixing (Designer proposes fuel mixing ratio)
7 Electricity Generation Voltage 11 KV / 3 Ph / 50 Hz

8 Motors Parameters 415 V, High Efficiency IE2 Class, Ambient Temp. 45 ᵒC,
Compatible with VFD application, Class- F Insulation, Service
Factor 1.15, suitable for high torque where required.
9 Motor’s Control System VFD Type with low pass filters & line reactor

10 Maximum Summer Temperature 55 °C, Arid Climate

11 Minimum Winter Temperature -2 °C

12 Latitude & Longitude __________ ᵒN, __________ ᵒE, _______ M above sea level

13 Max. Wind Velocity _____M / Sec,


14 Seismic Zone 2 A ( For Central Punjab, Pakistan )

Major Sections:

- Boiler Section - Turbine House - Coal & Lime Handling - Ash & Slag Handling

- Water & De-min - Cooling Water - Electrical & Controls - Fire Fighting

- Compressed Air - Emission Control - Day Diesel Handlin g