0% found this document useful (0 votes)
26 views1 page

Combine VAC-7

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Combine VAC-7

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES:

C 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE


SPECIFIED.
2. THE DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE FIGHTING AND
ELECTRICAL DRAWINGS.
3. ANY DISCREPANCIES MUST BE BROUGHT TO THE NOTICE OF THE
CONSULTANT.
4. ALL INTERCONNECTING PIPING , JOINTS AND U BENDS WITHIN THE
A B C D E CONDENSING UNITS SHALL BE PAINTED WITH TWO COATS OF
4830 3690 4190 3890 CLEAR TRANSPARENT COATING OF SUITABLE MATERIAL FOR
PROTECTION AGAINST CORROSION FROM AMBIENT AIR POLLUTION.
5. THE JOINTS SHALL BE PROPERLY SEALED WITH SYNTHETIC GLUE
TO ENSURE PROPER BONDING OF THE ENDS.
6. DRAIN PIPES CARRYING CONDENSATE WATER SHALL BE INSULATED
WITH 6MM NITRILE RUBBER.
7. FOR EQUIPMENT SCHEDULE REFER THE DWG. NO -
L1CEP2-SYTA-2S04-STN-2DM-21140.
8. FOR STANDARD INSTALLATION DETAILS REFER THE DWG. NO -
200x125 FAD BOD:3168 L1CEP2-SYTA-S-STN-2DM-21513 & 21514.
M-MEQ_IDU/CA/25
M-MEQ_IDU/CA/26 9. ALL EQUIPMENT SIZES ARE INDICATIVE AND IT WILL BE FINALIZED
1 AFTER FINALIZATION OF EQUIPMENT.
10.FRESH AIR DUCT CONNECTING TO THE FRESH AIR PORT OF
CASSETTE UNIT MUST BE COMPLETED / FINISHED WITH FLEXIBLE
M-DAC_VCD/25
C M-DAC_VCD/24
DUCT UPTO MAXIMUM LENGTH OF 1000 MM.
11.ALL FRESH AIR LOUVERS SHALL BE COMPLETED WITH SAND TRAP
250x200 TED BOD:2910 AND 100 MM THICK FILTER.
M-MEQ_IDU/CA/24 12.CONTRACTOR TO PROVIDE VOLUME CONTROL DAMPER (VCD) IN
M-MEQ_EAF/04

4875
EACH AND EVERY BRANCH DUCT WHETHER VCD IS SHOWN IN
DRAWING OR NOT.
M-AIT_EAL/04 13.FUSIBLE LINK SHALL BE ARRANGED IN AN EXPOSED POSITION AND
A-20 A-12 AT UPSTREAM OF THE DAMPER AND SHALL BE SET AT 74°C.
A-24 14.FLEXIBLE CONNECTION SHALL BE PROVIDED FOR EVERY DUCT
A-23 CONNECTION TO EQUIPMENT. CONNECTION SHALL BE OF
SUFFICIENT LENGTH TO ELIMINATE VIBRATION TRANSMISSION.
150x150 TED BOD:2935 M-MEQ_IDU/CA/23 15.FIRE DAMPERS SHALL BE INSTALLED IN ALL DUCTS PASSING
2 M-DAC_VCD/26
THROUGH FIRE-RATED WALLS AND CEILINGS
M-DAC_VCD/23 16.ALL HANGERS SHALL BE SECURELY ANCHORED TO THE BUILDING
STRUCTURE USING CADMIUM PLATED HARDWARE. HANGERS AND
M-MEQ_IDU/CA/22 M-DAC_VCD/22 LOWER ATTACHMENTS SHALL BE OF ADEQUATE SIZES AND SPACING
A-21 TO CARRY THE WEIGHT OF THE DUCTWORK AND INSULATION
100x100 FAD BOD:3180 M-MEQ_IDU/CA/19 WITHOUT SAGGING.
M-DAC_VCD/19 17.KINDLY REFER TECHNICAL SPECIFICATIONS FOR MATERIAL
M-DAC_VCD/20 M-MEQ_IDU/CA/18 DETAILS : HVAC - L1CEP2-SYTA-2-STN-SPN-20033

5230
M-MEQ_IDU/CA/20 M-MEQ_IDU/CA/17 18.THE EQUIPMENT TO BE INSTALLED ON SITE WILL HAVE TO COMPLY
WITH POWER REQUIREMENTS I.E. 400V, 3P/240V, 1P/60 HZ.
2
M-MEQ_IDU/CA/21
21136 M-DAC_VCD/17
M-DAC_VCD/21 M-DAC_VCD/18 LEGENDS AND SYMBOLS:
A-06
A-18 200x125 FAD BOD:3145
M-MEQ_IDU/CA/13 TED : Toilet Exhaust Duct VSD : Ventilation Supply Duct
3 DTG
FAL : Fresh Air Louver EAL : Exhaust Air Louver
A-22 BOD : Bottom Of Duct EAF : Exhaust Air Fan
A-19
M-MEQ_IDU/VRV/01 BOP : Bottom Of Pipe EAG : Exhaust Air Grille
M-DAC_VCD/15
200x150 FAD BOD:3155 DTG : Door Transfer Grille SAG : Supply Air Grille
M-MEQ_IDU/CA/16 ATG : Air Transfer Grille EAD : Exhaust Air Diffuser
A-17

4695
M-DAC_VCD/13 VRF : Variable Refrigerant Flow
M-DAC_VCD/16 FAF : Fresh Air Fan
M-DAC_VCD/12
IDU : Indoor Unit VRV : Variable Refrigerant Volume
A-13 M-AIT_FAL/02 ODU : Outdoor Unit F/A : Fresh Air
A-16 DCT : Duct MEQ : Mechanical Equipment
M-MEQ_IDU/VRV/02 A-14 M-MEQ_FAF/02
AIT : Air Terminal VCD : Volume Control Damper
REFR : Refrigerant Piping L/S : Liter Per Second
A-15
4 M-MEQ_IDU/CA/15 DAC : Duct Accessories FLFD/FD : Fusible Link Fire Damper/
Fire Damper
200x150 FAD BOD:3155
M-MEQ_IDU/CA/12 : Supply/Exhaust : Y- Joint
M-DAC_VCD/14
Air Grille & Diffuser
M-MEQ_IDU/CA/14 : Toilet Exhaust
: Inline Line Fan Duct (TED)
: Cassette Type : Ventilation Exhaust
Unit (IDU) Duct (VED)
: VRV/VRF Indoor : Ventilation Supply
Unit (IDU) Duct (VSD)

VAC SYSTEM-AIR DISTRIBUTION AND VENTILATION-FIRST FLOOR PLAN : VRV/VRF Outdoor : Supply Air Duct (SAD)

1 SCALE 1 : 100
Unit (ODU)
: Propeller Fan
: Refrigerant Pipe (S)
: Refrigerant Pipe (R)
: Condensate Pipe
: Volume Control Damper
: Fire Damper/
Fusible Link Fire Damper

A B C D E
4830 3690 4190 3890

M-MEQ_IDU/CA/20
1 x300 mm REFR. PIPE TRAY M-MEQ_IDU/CA/18
M-MEQ_IDU/CA/19
C 15OCT2020 UPDATED AS PER COMMENTS BY BYTP/MDC/LRMC/IC/ALSTOM MKR RCH BCO
M-MEQ_IDU/CA/21 3-R
200x125 FAD B 24JUL2020 UPDATED AS PER COMMENTS BY BYTP/MDC/LRMC/IC/ALSTOM MKR RCH BCO
±13
A 20NOV2019 FIRST ISSUE YBA RCH BCO

1 x200 mm REFR. PIPE TRAY Republic of the Philippines

Department of Light Rail Transit

3168
3125

3125
2970

2970

2970

2970
Transportation Authority

2-S
±8.9

2 M-SECTION B
SCALE 1 : 100

05-Room Schedule 05-Room Schedule 05-Room Schedule


ROOM ROOM ROOM
TAG ROOM NAME TAG ROOM NAME TAG ROOM NAME

A-01 RECEPTION A-11 TOILET A-18 21 UNITS 46" CCTV MONITORS


A-02 WAITING AREA A-12 OFFICE (8 TABLES & CHAIRS) A-19 DOCUMENT CONTROL ROOM
A-03 HALL ROOM A-13 DATA ROOM/ NETWORK OR LRMC LIBRARY
A-04 DOCTOR'S ROOM OPERATION CENTRE A-20 CAFETERIA
A-05 CLINIC (W/SINGLE BEDS) A-14 SECURITY SUPERVISOR 1 A-21 CORRIDOR
A-06 MEETING ROOM A-15 SECURITY SUPERVISOR 2 A-22 CORRIDOR
A-07 PANTRY A-16 SECURITY MANAGER 2 OFFICE A-23 MALE WASHROOM
A-08 CORRIDOR W/MEETING AREA A-24 FEMALE WASHROOM
A-09 MALE WASHROOM A-17 SECURITY MANAGER 1 OFFICE A-25 ELECTRICAL ROOM
A-10 FEMALE WASHROOM
W/MEETING AREA ST-01 STAIRCASE N

0 1 2 3 5 7m

Scale1: 100

You might also like