1
ABB, eMobility and EV Charging
August 26, 2020/ Teerapat Taerungreung
EV Infrastructure
ABB Electrification
2
Agenda and The key takeaways
45 • minutes duration
The key takeaways
• ABB Solutions
• ABB portfolio
• DC High power
• DC EV charger
• Bus solutions
• AC EV charger
Slide 3
EV fast charging and global standardization
ABB leading in major developments this decade
2010 2010 2012 2013 2013-2015 2016 2018
Founding of CHAdeMO Launch ABB Terra 51 Founding of CCS alliance Launch CCS & Launch global First eBus chargers in EU First eTruck chargers
ABB was involved from the start 50 kW CHAdeMO charger ABB was involved from the start, multi-standard Terra 53 variants Terra 53 Global partnerships with Global partnerships
basis for IEC standard CCS + CHAdeMO + AC China, USA, APAC bus OEMs with OEMs
Near
CHAdeMO CCS alliance Multi-standard E-bus Higher power future
Pilots First EV’s IEC 61851-23 Global EV spread OppCharge DC home
2010 2010 2012 2012 - 2013 2012, > 2014 - > 2017 2018
First 50 kW charger in EU First EV’s with DC First demo of CCS charging First nationwide ABB leading Connectivity DC networks Launch of high power for Gen2 charge post
Based on proprietary charging ABB & CCS alliance at DC networks & uptime spread globally cars and Terra 54HV
standard, no consumer EV’s Nissan Leaf & EVS26 Los Angeles, USA ABB in Estonia, ABB has industry leading Europe, USA, Asia 150-350kW fast charging Next steps in High
available Mitsubishi iMieV Denmark, Netherlands uptime by remote mnmnt for next generation EV’s Voltage charging
August 22, 2020
Slide 4
Global EV Outlook
Public and commercial car charging – Use cases
Charging service should match charging application and demand
Public and commercial EV Charging
AC destination DC destination DC Fast DC High Power
3-22 kW 24 kW 50 kW 150 to 350 kW+
4-16 hours 1-3 hours 20-90 min 10-20 min
6
EV fast charging solutions
eTruck chargers
eBus chargers
• Opportunity Charge
• Overnight Charging
DC fast chargers
• DC wall box (24kW)
• Terra 54 (50kW)
• Terra HP (150 – 350 kW)
7
EV charging solutions
Public and commercial car charging
Public and commercial EV Charging
DC destination DC Fast DC High Power
24 kW 50 kW 150 to 350 kW+
1-3 hours 20-90 min 10-20 min
8
EV charging solutions
DC High power charging 150-350 kW
Public and commercial EV Charging
DC destination DC Fast DC High Power
20-25 kW 50 kW 150 to 350 kW+
1-3 hours 20-90 min 10-20 min
– Office, workplace – Retail, grocery, mall, big box, – Highway corridor travel
– Multi family housing restaurant – Metro ‘charge and go’
– Hotel and hospitality – High turnover parking – Highway rest stops
– Parking structures – Convenience fueling stations – Petrol station area’s
– Dealerships – Highway truck stops and travel – City ring service stations
– Urban fleets plazas – OEM R&D
– Public or private campus – OEM R&D
– Sensitive grid applications
9
EV charging solutions
DC High Power charging 150-350 kW
Static option
175 KW Upgrade 350 kW
350 A 500 A
10
EV charging solutions
DC High Power charging 150-350 kW
Dynamic option Power expansion
1 cabinet
expansion
2 cabinet
expansion
350 kW 350 kW
500 A 500 A
11
EV charging solutions
DC High Power charging 150-350 kW
12
EV charging solutions
DC High Power charging 150-350 kW
13
EV charging solutions
DC fast charge 50 kW
Public and commercial EV Charging
DC destination DC Fast DC High Power
20-25 kW 50 kW 150 to 350 kW+
1-3 hours 20-90 min 10-20 min
– Office, workplace – Retail, grocery, mall, big box, – Highway corridor travel
– Multi family housing restaurant – Metro ‘charge and go’
– Hotel and hospitality – High turnover parking – Highway rest stops
– Parking structures – Convenience fueling stations – Petrol station area’s
– Dealerships – Highway truck stops and travel – City ring service stations
– Urban fleets plazas – OEM R&D
– Public or private campus – OEM R&D
– Sensitive grid applications
14
EV charging solutions
DC fast charge 50 kW
Slide 15
EV charging solutions
DC fast charge 50 kW
CHAdeMO
AC
CCS
• C - (Combo) = Combined Charging Systems (CCS)
• J - (Japan) = CHAdeMO
• Z - (China) = GB
• T - (Socket) = Type 2 Socket
• G - (Grid) = Cable + Type 2 Connector
16
EV charging solutions
DC fast charge 50 kW
17
EV charging solutions
DC fast charge 50 kW
18
EV charging solutions
DC fast charge 50 kW
19
EV charging solutions
Public and commercial car charging
Public and commercial EV Charging
DC destination DC Fast DC High Power
20-25 kW 50 kW 150 to 350 kW+
1-3 hours 20-90 min 10-20 min
– Office, workplace – Retail, grocery, mall, big box, – Highway corridor travel
– Multi family housing restaurant – Metro ‘charge and go’
– Hotel and hospitality – High turnover parking – Highway rest stops
– Parking structures – Convenience fueling stations – Petrol station area’s
– Dealerships – Highway truck stops and travel – City ring service stations
– Urban fleets plazas – OEM R&D
– Public or private campus – OEM R&D
– Sensitive grid applications
20
EV charging solutions
DC wallbox 24 kW
DC wallbox 24 kW
• Single outlet CCS2
• Dual outlet CCS2 + CHAdeMO
• IP 54 outdoor housing
• touch screen
21
EV charging solutions
DC wallbox 24 kW
Built-in safety
• Overcurrent
• Overvoltage and undervoltage
• Ground fault
• Surge protection
• PE (protective earth) continuity
monitoring
• Leakage current monitor protection
Bus charging solutions
23
Bus charging solutions
DC fast charge Bus Solutions
Bus charging solutions
Reliable, scalable, based on industry standards
▪ Automated connection system
▪ High power DC transfer to bus
▪ Wireless communication to bus
▪ Based on
▪ EN/IEC 61851-23
▪ ISO/IEC 15118
▪ OppCharg compatible
▪ Industrial quality power cabinet
▪ 150kW, 300kW, 450 kW and 600 kW modular
▪ Redundancy per each 150kW module 150 150 150 150
kW kW kW kW
▪ 200-920 VDC
▪ Galvanic isolation
▪ Remote management
Sequential charging - How does it work?
1. First Bus 1 starts charging
with 150kW full power,
using charge box 1. When
bus 1 is full it stops
charging.
2. Then Bus 2 charges with
▪ 3 busses share one 150 kW charger.
150kW until full. Charging
▪ Each bus has a dedicated charge box. stops.
▪ When buses arrive they each plug in to
their respective depot charge box
▪ Buses can remain connected also after
charging has finished. 3. Finally Bus 3 charges with
150kW until full. Charging
stops.
26
EV charging solutions
Sequential charging solution
Singapore Solution – LTA (Land Transport Authority)
bought 20 electric buses from BYD
ABB Sequential Charge all 20 vehicles in 5 hours (11pm to 4am).
• ABB providing 10 x 150kW Chargers
• 150 kW charging with 2 Depot Charge Boxes
• 10 Buses charge first
• And then automatically when they are done, the next 10 will
charge
• CCS2 connector
27
EV charging solutions
Network Operations Center (NOC)
• Reliable connectivity
• 24/7 monitoring of network status
• Remote software updates
• Compliance with communication
standards/ OCPP
28
EV charging solutions
AC chargers
• Single phase 7.4kW
• Three phase 22 kW
• Type 2 socket with or without
shutter
• Type 2 cable, 5 m
ChargerSync Smartphone App
29
EV charging solutions
Built-in safety
• Overcurrent
• Overvoltage and undervoltage
• Ground fault
• Surge protection
• PE (protective earth)
continuity monitoring
ChargerSync Smartphone App
30
EV charging solutions
‘ChargerSync’ in App store or Google play store
31
EV charging solutions
Create an account
32
EV charging solutions
Install Terra AC
33
EV charging solutions
Static load balance
34
EV charging solutions
load management
• Static load management
• Dynamic load management Set
up for external energy meter
integration
• Integration with advanced smart
building energy system
35
EV charging solutions
Energy Plan
36
EV charging solutions
Schedule
37
EV charging solutions
Charging monitoring data
38
EV charging solutions
Charging Terra AC