0% found this document useful (0 votes)
56 views31 pages

Load - Estimation by DPS

Uploaded by

Ahmed Mokhtar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views31 pages

Load - Estimation by DPS

Uploaded by

Ahmed Mokhtar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 31

BA

LAB STORAGE
Number Area (m2) Number
LAB BS 03 55 STORAGE BS 08
LAB BS 04 54 STORAGE BS 34
LAB BS 02 110 STORAGE BS 28
Total 219 STORAGE BS 22
STORAGE BS 21
STORAGE BS 20
STORAGE BS 29
STORAGE BS 33
Total

Lobby and corridor Stairs


Number Area (m2) Number
CORRIDOR 516 STAIRE 01
Total 516 STAIRE 02
STAIRE 03
Sevice rooms (Toilets) Total
Name Area in m2
H.C Toilet 4
H.C Toilet 4
H.C Toilet 4 Storage Usage
Staff Toilet 25 Name
Toilet 22 Pantry
Toilet 22 Total
Toilet 4
Total 85

Name Area m2 Load density VA/M2 Total connected Load VA


LAB 219 100 21900
STORAGE 463 48 22224
Lobby and corridor 516 48 24768
Stairs 57 40 2280
Storage Usage 7 48 336
CLASSROOM 433 64 27712
Services in building 256 48 12288
Sevice rooms (Toilets) 85 40 3400
Service rooms 6 40 240
BASEMENT floor
STORAGE Services in building Service rooms
Area(m2) Name Area(m2) Name
67 ELECTRICAL 8 Janitor
55 ELECTRICAL 6 Janitor
57 FIRE FIGHTING 117 Janitor
57 GENERATOR 114 Total
57 DATA 6
57 DATA 5
57 Total 256
56
463

Stairs
Area (M2)
19
19 CLASSROOM
19 Number Area (m2)
57 CLASSROOM 134
CLASSROOM 111
CLASSROOM 89
CLASSROOM 99
orage Usage Total 433
Area in m2
7
7

Demand Factor Total Demand Load


0.7 15330
0.7 15556.8
0.7 17337.6
0.65 1482
0.7 235.2
0.7 19398.4
0.7 8601.6
0.65 2210
0.65 156

Total Demand load (KVA)


80.31
Service rooms
Area in m2
2
2
2
6
Ground flo
LAB CONFERENCE MEETING
Number Area (m2) Number Area(m2)
cafeteria 87 Auditorium 96
cafeteria 23 Auditorium 111
Total 110 Jury Space 99
Jury Space 160
Total 466

Lobby and corridor


Number Area (m2)
CORRIDOR 898 Stairs
Total 898 Number Area (M2)
STAIRE 01 19
STAIRE 02 19
STAIRE 03 19
Sevice rooms (Toilets) Total 57
Name Area in m2
H.C Toilet 4
H.C Toilet 4
H.C Toilet 4 Storage Usage
Staff Toilet 25 Name Area in m2
Toilet 22 Pantry 7
Toilet 22 Total 7
Toilet 4
Total 85

Name Area m2 Load density VA/M2 Total connected Load VA Demand Factor
cafeteria 110 48 5280 0.7
CONFERENCE 466 72 33552 0.6
Lobby and corridor 898 48 43104 0.7
Stairs 57 48 2736 0.7
Storage Usage 7 48 336 0.7
CLASSROOM 334 64 21376 0.7
Services in building 96 48 4608 0.7
Sevice rooms (Toilets) 85 40 3400 0.65
Service rooms 6 40 240 0.65
Clinic 55 80 4400 0.6
Longue 57 64 3648 0.7
Ground floor
Services in building Service rooms
Name Area(m2) Name Area in m2
ELECTRICAL 8 Janitor 2
ELECTRICAL 6 Janitor 2
ELECTRICAL 46 Janitor 2
BMS ROOM 25 Total 6
DATA 6
DATA 5
Total 96

CLASSROOM Longue
Number Area (m2) Name Area in m2
student Hub 134 Reading Longue 57
show room 111 Total 57
tech.room 89
Total 334

clinic
Name Area in m2
Clinic 55
Total 55

Total Demand Load


3696
20131.2
30172.8
1915.2
235.2
14963.2
3225.6
2210
156
2640
2553.6

Total Demand load (KVA)


81.90
1ST floor
Studios STORAGE
Number Area (m2) Number Area(m2)
Architecture st. 100 Staff office 83
Architecture st. 110 Staff office 21
Total 210 Staff office 20
Staff office 28
Staff office 28
Laboratory for education Staff office 30
Name Area in m2 Staff office 28
Computer lab 68 Staff office 46
Total 68 Staff office 55
Staff office 27
Lobby and corridor Staff office 29
Number Area (m2) Staff office 14
CORRIDOR 557 Staff office 16
Total 557 Supervisor 15
Total 440
Sevice rooms (Toilets)
Name Area in m2
H.C Toilet 4
H.C Toilet 4
H.C Toilet 4 Storage Usage
Staff Toilet 25 Name Area in m2
Toilet 22 Pantry 7
Toilet 22 Total 7
Toilet 4
Total 85

Name Area m2 Load density VA/M2 Total connected Load VA Demand Factor
Studios 210 100 21000 0.7
Office 440 72 31680 0.6
Lobby and corridor 557 48 26736 0.7
Stairs 57 48 2736 0.7
Storage Usage 7 48 336 0.7
CLASSROOM 414 64 26496 0.6
Services in building 25 48 1200 0.7
Sevice rooms (Toilets) 85 40 3400 0.65
Service rooms 40 40 1600 0.65
CONFERENCE 55 72 3960 0.7
Laboratory 68 100 6800 0.7
1ST floor
Services in building Service rooms
Name Area(m2) Name Area in m2
ELECTRICAL 8 Janitor 2
ELECTRICAL 6 Janitor 2
DATA 6 Janitor 2
DATA 5 Room 34
Total 25 Total 40

CLASSROOM
Number Area (m2)
CLASSROOM 54
CLASSROOM 55 CONFERENCE MEETING
CLASSROOM 55 Name Area in m2
CLASSROOM 55 Jury 55
CLASSROOM 55 Total 55
CLASSROOM 79
CLASSROOM 61
Total 414

Stairs
Number Area (M2)
STAIRE 01 19
STAIRE 02 19
STAIRE 03 19
Total 57

Total Demand Load


14700
19008
18715.2
1915.2
235.2
15897.6
840
2210
1040
2772
4760

Total Demand load (KVA)


82.09
Sevice rooms Public Usage
Name Area in m2 Name Area in m2
Room-205 28 Corridors-223 918
Room-216 2 Total 918
Room-220 2
Janitor 2 Sevice rooms for Studies
Janitor 2 Name Area in m2
Janitor 2 Seminar room 57
Total 38 Seminar room 57
Total 114
Sevice rooms (Toilets)
Name Area in m2 Electrical rooms
H.C Toilet 4 Name Area in m2
H.C Toilet 4 Data 5
H.C Toilet 4 Electrical 8
Toilet 22 Electrical 6
Toilet 22 Data 6
Staff Toilet 25 Total 25
Total 81

Name Area m2 Load density VA/M2 Total connected Load VA Demand Factor
Sevice rooms 38 40 1520 0.65
Public Usage 918 48 44064 0.7
Offices 60 72 4320 0.6
Stairs 50 48 2400 0.7
Sevice rooms for studies 114 64 7296 0.7
Service rooms (Toilets) 81 40 3240 0.65
Storage Usage 7 48 336 0.7
Laboratory for education 122 100 12200 0.7
Electrical rooms 25 48 1200 0.7
Studios 1076 100 107600 0.7
For second floor
Stairs Offices
Name Area in m2 Name Area in m2
Stair (01) 18 Staff office 28
Stair (02) 16 Staff office 16
Stair (03) 16 Staff office 16
Total 50 Total 60

Storage Usage Laboratory for education


Name Area in m2 Name Area in m2
Pantry 7 Geom lab 54
Total 7 Computer lab 68
Total 122

Total Demand Load (VA)


988
30844.8
2592
1680
5107.2
2106
235.2
8540
840
75320
Total Demand Load (KVA)
128.25
Studios
Name Area in m2
Architecture Studio 112
Geom Studio 47
Urban Studio 110
Architecture Studio 101
Urban Studio 118
Geom Studio 103
Urban Studio 135
Architecture Studio 112
Urban Studio 104
Urban Studio 134
Total 1076
For third floor
Sevice rooms Public Usage
Name Area in m2 Name Area in m2
Janitor 2 Corridors-368 875
Janitor 2 Total 875
Janitor 2
Total 6 Sevice rooms (Toilets)
Name Area in m2
Stairs H.C Toilet 4
Name Area in m2 H.C Toilet 4
Stair (01) 18 H.C Toilet 4
Stair (02) 16 Staff Toilet 25
Stair (03) 16 Toilet 22
Total 50 Toilet 22
Total 81
Storage Usage
Name Area in m2 Electrical rooms
Pantry 7 Name Area in m2
Total 7 Data 5
Electrical 8
Data 6
Electrical 6
Total 25

Name Area m2 Load density VA/M2 Total connected Load VA Demand Factor
Sevice rooms 6 40 240 0.65
Public Usage 875 48 42000 0.7
Offices 113 72 8136 0.6
Lobby and Halls 109 48 5232 0.7
Sevice rooms for studies 40 64 2560 0.7
Service rooms (Toilets) 81 40 3240 0.65
Stairs 50 48 2400 0.7
Storage Usage 7 48 336 0.7
Electrical rooms 25 48 1200 0.7
Laboratory for education 305 100 30500 0.7
Studios 895 100 89500 0.7
For third floor
Offices Laboratory for education
Name Area in m2 Name
Staff office 56 Computer lab
Staff office 27 Landscape architecture lab
Staff office 16 Computer lab
Staff office 14 Computer lab
Total 113 Computer lab
Total
Sevice rooms for Studies
Name Area in m2 Studios
Graduate Studies 40 Name
Total 40 Architecture Studio
Landscape Architecture Studio
Lobby and Halls Landscape Architecture Studio
Name Area in m2 Architecture Studio
Roof 109 Landscape Architecture Studio
Total 109 Architecture Studio
Landscape Architecture Studio
Landscape Architecture Studio
Total

Total Demand Load (VA)


156
29400
4881.6
3662.4
1792
2106
1680
235.2
840
21350
62650

Total Demand Load (KVA)


128.75
Laboratory for education
Name Area in m2
Computer lab 72
scape architecture lab 54
Computer lab 56
Computer lab 68
Computer lab 55
Total 305

dios
Area in m2
112
103
112
101
102
111
136
118
895
Sevice rooms Public Usage
Name Area in m2 Name
Room-359 2 Corridors-368
Room-365 2 Total
Closet 3
Janitor 2 Sevice rooms for Studies
Janitor 2 Name
Janitor 2 Graduate Studies
Total 13 Total

Stairs
Name Area in m2 Sevice rooms (Toilets)
Stair (01) 18 Name
Stair (02) 16 H.C Toilet
Stair (03) 16 H.C Toilet
Total 50 H.C Toilet
Staff Toilet
Storage Usage Toilet
Name Area in m2 Toilet
Pantry 7 Toilet
Total 7 Total

Lounge Sevice rooms for Confer.


Name Area in m2 Name
Staff lounge 99 Meetings Hall
Total 99 Total

Name Area m2 Load density VA/M2 Total connected Load VA


Sevice rooms 13 40 520
Public Usage 864 48 41472
Offices 1063 72 76536
Lobby and Halls 212 48 10176
Sevice rooms for studies 41 64 2624
Service rooms (Toilets) 85 40 3400
Stairs 50 48 2400
Storage Usage 7 48 336
Electrical rooms 25 48 1200
Lounge 99 64 6336
Meetings Hall 56 72 4032
For fourth floor
lic Usage Offices
Area in m2 Name Area in m2
864 Architecture Department 79
864 Architecture Department 56
Architecture Department 57
oms for Studies Geom Department 63
Area in m2 Geom Department 56
41 Landscape Architecture Department 56
41 Landscape Architecture Department 81
Office 57
Office 57
ooms (Toilets) Office 28
Area in m2 Office 56
4 Office 29
4 Office 28
4 Office 29
25 Office 13
22 Office 27
22 Office 77
4 Office 28
85 Salon & Secretary 23
Urban Department 56
oms for Confer. Urban Department 56
Area in m2 Vice Dean Office 51
56 Total 1063
56

Demand Factor Total Demand Load (VA)


0.65 338
0.7 29030.4
0.6 45921.6
0.7 7123.2
0.7 1836.8
0.65 2210
0.7 1680
0.7 235.2
0.7 840
0.7 4435.2
0.6 2419.2

Total Demand Load (KVA)


96.07
Lobby and Halls
Name Area in m2
Lobby 8
Lobby 12
Roof 192
Total 212

Electrical rooms
Name Area in m2
Data 6
Data 5
Electrical 6
Electrical 8
Total 25
Roof
Mech room
Name Area (m2)
Lifts Room-372 16
Lifts Room-376 17
Lifts Room-380 17
ELECTRICAL CLOSET-385 2
ELECTRICAL CLOSET-387 2
Room-388 17
Total 71

Name Area m2 Load density VA/M2 Total connected Load VA


Mech room 71 48 3408
Stairs 33 48 1584
free spacing for lighting and power-Service usage
Roof
Stairs
Number Area (m2)
Stair (01)-392 17
Stair (02)-384 16
Total 33

Demand Factor Total Demand Load (VA)


0.7 2385.6
0.7 1108.8
3000

Total Demand Load (KVA)


6.49
Additional Load
Name Load(KW) Quantity Total Power (KW) P.F
Air coooled chilers CH-1 475 2 950 0.8
Pumps CH.W.P.P-01 20 2 40 0.8
AHU-01 12 1 12 0.8
AHU-02 18 1 18 0.8
AHU-03 17 1 17 0.8
AHU-04 16 1 16 0.8
AHU-05 21 1 21 0.8
AHU-06 14 1 14 0.8
Air Handling Unit
AHU-07 18 1 18 0.8
AHU-08 18 1 18 0.8
AHU-09 20 1 20 0.8
AHU-10 16 1 16 0.8
AHU-11 20 1 20 0.8
AHU-12 15 1 15 0.8
F/A.F-01 12.5 1 12.5 0.8
F/A.F-02 15 1 15 0.8
F/A.F-03 12.5 1 12.5 0.8
F/A.F-04 12.5 1 12.5 0.8
F/A.F-05 16 1 16 0.8
F/A.F-06 12.5 1 12.5 0.8
Fresh Air Fan F/A.F-07 16 1 16 0.8
F/A.F-08 15.5 1 15.5 0.8
F/A.F-09 16.5 1 16.5 0.8
F/A.F-10 13.5 1 13.5 0.8
F/A.F-11 16.5 1 16.5 0.8
F/A.F-12 12.5 1 12.5 0.8
P/A.F-01 9.5 3 28.5 0.8
EX.F-01 0.58 2 1.16 0.8
EX.F-02 0.13 1 0.13 0.8
EX.F-03 0.2 1 0.2 0.8
Exhaust Fans
EX.F-04 3.2 1 3.2 0.8
EX.F-05 3.2 1 3.2 0.8
EX.F-06 2 1 2 0.8
SM.F-01 12 1 12 0.8
SM.F-02 13 1 13 0.8
SM.F-03 12.5 1 12.5 0.8
SM.F-04 12 1 12 0.8
SM.F-05 14 1 14 0.8
SM.F-06 12 1 12 0.8
Smoke Fans
SM.F-07 14 1 14 0.8
SM.F-08 14 1 14 0.8
SM.F-09 14.5 1 14.5 0.8
SM.F-10 13 1 13 0.8
SM.F-11 14.5 1 14.5 0.8
SM.F-12 12.5 1 12.5 0.8
Fan Coil High Wall F.C.U-01 0.8 24 19.2 0.8
SP.U-01 2.8 1 2.8 0.8
Split High Wall (DX) units
Split High Wall (DX) units SP.U-02 1.8 25 45 0.8
AC-01 0.35 8 2.8 0.8
AC-02 0.35 7 2.45 0.8
Air Curtain
AC-03 0.35 1 0.35 0.8
AC-04 0.35 1 0.35 0.8
14 4 56 0.8
Elevator
14 2 28 0.8
DOMESIC PUMP 41 2 82 0.8
SUBMERSIBLE 3.31 2 6.62 0.8
JOKEY PUMP 8.95 1 8.95 0.8
Light Current
ditional Load
Total Connected Load (KVA) Demand Factor Total Demand Load (KVA)
1187.5 1 1187.5
50 1 50
15 0.8 12
22.5 0.8 18
21.25 0.8 17
20 0.8 16
26.25 0.8 21
17.5 0.8 14
22.5 0.8 18
22.5 0.8 18
25 0.8 20
20 0.8 16
25 0.8 20
18.75 0.8 15
15.625 0.8 12.5
18.75 0.8 15
15.625 0.8 12.5
15.625 0.8 12.5
20 0.8 16
15.625 0.8 12.5
20 0.8 16
19.375 0.8 15.5
20.625 0.8 16.5
16.875 0.8 13.5
20.625 0.8 16.5
15.625 0.8 12.5
35.625 0.8 28.5
1.45 0.8 1.16
0.1625 0.8 0.13
0.25 0.8 0.2
4 0.8 3.2
4 0.8 3.2
2.5 0.8 2
15 0.8 12
16.25 0.8 13
15.625 0.8 12.5
15 0.8 12
17.5 0.8 14
15 0.8 12
17.5 0.8 14
17.5 0.8 14
18.125 0.8 14.5
16.25 0.8 13
18.125 0.8 14.5
15.625 0.8 12.5
24 0.8 19.2
3.5 0.8 2.8
56.25 0.8 45
3.5 0.8 2.8
3.0625 0.8 2.45
0.4375 0.8 0.35
0.4375 0.8 0.35
70 0.85 59.5
35 0.72 25.2
102.5 0.8 82
8.275 0.8 6.62
11.1875 0.8 8.95
38 1 38
Total Demand Load (KVA)
2103.61
BASEMENT (KVA) Ground (KVA) 1ST Floor (KVA) 2NDT Floor (KVA) 3RD Floor (KVA)
80.31 81.90 82.09 128.25 128.75

Generator (MVA) Transformer (MVA)


1.0 3.0
4Th Floor (KVA) Roof (KVA) Additional Load (KVA) Total(MVA)
96.07 6.49 2103.61 2.70748

Conclusion
2 RMU – 2 TRANSROMERS.
DIV . F Total Load(MVA)
1 2.7

You might also like