Assignment 3

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views3 pages

Assignment 3

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Assignment 2 Last date of submission: 18/11/2024

1. Define/write down about Following


• Blasting-Off-Solid
• Active Mining Zone
• Ventilating District
• Thick Seam
• Goaf
• Immediate roof
• Working Area
• Working Face
• Mine
• Contiguous seam
• Coal Bump
• Superimposed working
• Isolation stopping/Fire sealing
• Creep
• Active Support
• Passive Support
• Abutment Loading/stress
• Induced Stress
• Local Fall
• Main/major Fall
• Air blast
• Rock Mass Rating and its application
• Convergence
• Bed Separation
• Roof Sagging
• Incubation period
• Goaf edge
• Line of extraction
• Breaker Line Support
• Hydraulic profile and hydraulic gradient
• Cuttable bolt
• Goaf angle
• Abutment angle
• Bulking factor
• Rib/snook
• Fender/stook
• Cut-out Distance (COD)
• Minimum parting thickness between two sections as per CMR 2017
• Degree 1, 2 and 3 gassiness of seam
• Incubation period
• Staple pit
• Green roof/freshly exposed roof
• Strata Control and Monitoring Plan as per Reg. 123 of CMR 2017
• Hydraulic Mining
• Anchorage testing of roof bolts and its significant/application

Page 1 of 3
2. Draw a flow chart about following modules of underground coal mining (UCM) by showing
procedure, technical parameters/design guidelines including statutory provisions for safe
mining:
• Indian Status Coal Mining
• Stages in the life of the underground coal mine
• Access to the mine
• Development of Stratified Deposits
• Bord and Pillar (B&P) method of mining
• Longwall method of mining
• Mining Under Difficult Geological Situations
• Stowing

3. Draw a layout of continuous miner-based mechanized depillaring panel. What are different
methods of pillar extraction using continuous miner technology. Explain manner of pillar
extraction using Split and Fender Method including design applied support system and strength
of coal pillar.
Assume:
Pillar size: 36 m x 36 m (Centre to Centre)
Gallery width = 6 m
RMR= 48
Density of immediate roof = 2.4 t/m3
Bearing capacity of resin grouted roof bolt = 20 t
Depth of cover = 250 m

4. Draw a layout of retreat and advance longwall panels. Design the development of roadways,
cut through, chain pillars and support system for a retreat longwall panel considering following
conditions.

Strike

Coal seam

Dip

RMR= 50
Depth = 600 m
Proposed roadway width= 5.5 m
Immediate roof up to 4 m highly laminated
Density of immediate roof=1.6 t/m3
Bearing capacity of resin grouted roof bolt= 20 t
Bearing capacity of bulbed flexi bolt= 60 t

Page 2 of 3
5. Draw a wedge cut and Fan cut for Blasting-off-Solid in underground coal mine. Evaluate
powder factor, detonator factor considering following parameters.
Pull-out length = 1.3 m
No. of short hole = 18
No. of detonator used = 18
Size of bord (gallery) = 4.8 m width and 3 m height
Density of coal = 1.4 t/m3

6. What are the different Statutory provisions before, during and after extraction of depillaring.
7. Factor affecting longwall mining.
8. Write down the factor of safety of solid pillar, fender, rib/snook.
9. Draw a diagram of cable-truss support system.
10. What is periodic weighting? What are different methods for predicting peridia weighting?
11. Write down the name of different standing and reinforcement support system with their bearing
capacity.
12. What are the different mining methods for extraction of thick seam. Explain cable bolting based
depillaring method and required support system.
13. How to estimate Caveability Index? Write down the classification of Caveability Index and its
consequences around line of extraction.
14. What are different types of line of extraction? Explain with suitable diagram.
15. What are different types of goaf management? What are the different techniques to induce
caving of hanging roof in goaf if roof is difficult to cave.
16. Estimate recovery and pillar strength using Sheorey (1992) and Salamon and Munaro (1967)
formulations for developed seams considering
Pillar size (centre to centre): 40 m x 40 m, depth of cover= 280, height of working=3 m
26 m x 26 m, depth of cover = 150 m, height of working=3 m
Gallery width for both cases 6 m
Uniaxial strength of coal = 25 MPa
17. Underground mines producing 2000 ton of coal in day by continuous mine and 500 ton in a day
using LHD. Total manpower in a shift is 125 and 150 for continuous miner and LHD sections.
Estimate output-per-manshift (OMS) for both mines.
18. Difference between Bord & Pillar and Longwall mining method.
19. Suggestions for improving production from underground mine.
20. Mining methods for extraction of coal pillars below important surface features.
21. Write down different complex and difficult situation of coal deposit. Explain through diagram
and also write suitable mining method for safe extraction of the complex deposit.

Page 3 of 3