P08 Pump Control With Sequence Control Function
P08 Pump Control With Sequence Control Function
Control requirements
The pumping system for a large fountain installation in a public park needs to be
replaced. This will involve the use of two pumps, one to feed the large vertical fountain
in the middle and another to handle to ring-shaped fountain around the edge. The
control system needs to ensure that the ring-shaped fountain can only operate if the
large central jet is already in operation. Plan and implement a circuit for this.
The fountain's two pumps, 1 and 2, should each be turned on by a dedicated switch and
turned off via another switch which they share in common.
When button 3 is pressed, both pumps should turn off if they are working or remain off if
they are not.
Component Function
Button Both pumps OFF
Button Central pump (Pump 1) ON
Button Ring pump (Pump 2) ON
Motor protection switch Overload protection for Pump 1
Motor protection switch Overload protection for Pump 2
Contactor Power contactor for Pump 1
Contactor Power contactor for Pump 2
Planning
Develop, try out and test a control circuit using the circuit simulator. Print out the results
when you are finished.
Match the components to the names they should be identified with in this project.
Button to turn both pumps OFF ???
Procedure
Now implement the complete circuit on the experiment board and undertake a practical
test of your results.