0% found this document useful (0 votes)
15 views1 page

Final All 05-12-22-DRG 03

Detaillinf format-3

Uploaded by

DEEPAK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views1 page

Final All 05-12-22-DRG 03

Detaillinf format-3

Uploaded by

DEEPAK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTE: PLEASE REFER LAVOTORY DRAWING FOR DETAILS CONSTRUCTION OF BUILDING FOR

BRICK WALL 150MM Th. SCHEDULE FOR LINTEL BEAM


C1 C1 C1 C1 M/S. ABHAYA WOMEN ENTREPRENEUR
REBAR DETAILS
ASSOCIATION, NAGPUR ON PLOT NO T-56,
FBY1 FBY1 FBY1 FBY1 BEAMTYPE
FBX1 WIDTH DEPTH REMARK MIDC INDUSTRIAL AREA, BUTTIBORI,
FBX1 FBX1 MAIN TOP R/F MAIN TIES
C2 C2 C2 C2
(mm) (mm) BOTTOMN R/F DISTRICT- NAGPUR
FBY2 FBY2 FBY2 FBY2 FBY2 230 450 6 - 16Ø 6 - 16Ø ALL BARS CONTIOUS LINTEL BEAM DETAILS
LBX1 8Ø @ 150 C/C
CH2 CH2 CH2
AT TOP & BOTTOMN
NOTES:
F ALL BARS CONTIOUS 1. ALL DIMENSIONS ARE IN mm.
C1 LBY1 230 450 4 - 16Ø 4 - 16Ø 8Ø @ 150 C/C
LBX1 C1 LBX1 C1 LBX1 C1 LBX1 AT TOP & BOTTOMN 2. FOR DIMENSIONS, LEVELS, CENTERLINE AND GENERAL
ARRANGEMENT REFER ARCHITECTURAL DRAWING.
3. BUILDING IS DESIGNED FOR G ONLY.
SCHEDULE FOR CHHAJA OVER WINDOWS AND SHUTTERS
7460
CH1
LBY1 LBY1 CH2
4. S.B.C. OF THE SOIL IS 240.0 MT/SQM AS PER SOIL REPORT.
5. PRECAST MORTAR BLOCKS OF STRENGTH NOT LESS THAN THAT OF
DIMENSIONAL DETAILS REBAR DETAILS
CONCRETE SHOULD BE USED TO ENSURE REQUISITE CLEAR COVER
CHHAJA
REMARK TO REINFORCEMENT.
TYPE WIDTH OVERHANG DEPTH DEPTH MAIN TOP R/F MAIN Distribution 6. MIN. DEPTH OF FOUNDATION SHOULD BE 1.5 M BELOW NATURAL
C2 C2 (mm) (mm) START(mm) END(mm) BOTTOMN R/F GROUND LEVEL.
E
7. MAXIMUM WATER TABLE WILL BELOW FOUNDATION LEVEL IS
CH1 RS+300 1000 100 80 8Ø@200 C/C - 8Ø @ 300 C/C Numbers and position of ASSUMED.
chhaja are w.r.t final 8. USE M20 GRADE OF CONCRETE & FE500 GRADE STEEL
CH2 W+300 800 80 80 8Ø@200 C/C - placement dimensions REINFORCEMENT OF HIGH STRENGTH DEFORMED BARS.
7460

LBY1 8Ø @ 300 C/C


CH2 LBY1 CH2 9. DENSITY OF BRICK ASSUME TO BE 19 KN/M³
10. PROVIDE CLEAR COVER OF 50mm FOR FOOTING R/F.
5. PROVIDE CLEAR COVER OF 40mm FOR COLUMN R/F.
5. PROVIDE CLEAR COVER OF 25mm FOR BEAM R/F.
C2 C2 SCHEDULE FOR COLUMN FROM PLINTH TO LINTEL LEVEL 5. PROVIDE CLEAR COVER OF 20mm FOR SLAB R/F.
D
COLUMN DETAILS 6. NOT MORE THAN 50% BARS SHOULD BE LAPPED AT ONE SECTION.
COLUMN 7. EXECUTIONS SHALL BE AS PER IS 456:2000 & IS 13920:2016.
TYPE WIDTH DEPTH REMARK 8. FOR DIMENSIONS, LEVELS, CENTERLINE AND GENERAL
MAIN TIES
(mm) (mm) ARRANGEMENT REFER ARCHITECTURAL DRAWING.
R/F
7460

CH2
LBY1 LBY1 CH1 9. ALL BARS SHOULD BE EXTENDED UPTO DEVELOPMENT LENGTH +

C1 300 600 8 - 16Ø 8Ø @ 150 C/C 10 DIA. OF BAR.


10. LAP SHOULD BE EQUAL TO DEVELOPMENT LENGTH + 10 DIA. OF
BAR.
11. USE OPC/PCC WITH MINIMUM GRADE 43/53 AND USE MAXIMUM
C
C2 C2 C2 300 600 8-16Ø 8Ø @ 150 C/C
WATER CEMENT RATIO 0.5.
12. NO OVERLAPS ARE ALLOWED IN FOOTING.
13. FOR ISOLATED FOOTING LONG BARS SHALL BE KEPT BELOW SHORT
BARS.

RING PATTERN FOR COLUMN THROUGHOUT


7460

14. FOR COMBINED AND RAFT FOOTING SHORT BARS SHALL BE KEPT
CH2
LBY1 LBY1 CH2 BELOW LONG BARS.
15. GRADE OF CONCRETE FOR P.C.C. IS 1:3:6.
300x600 16. PIPES REQUIRED FOR RAIN WATER/ SANITARY OR ANY OTHER
COLUMN TYPICAL HOOK PURPOSE ARE NOT ALLOWED TO BE TAKEN THROUGH COLUMN.
C2 C2 SIZE 8-16Ø DETAILS 17. SUPERVISION AT OWN RISK.
B
18. BUILDING IS DESIGN FOR SEISMIC ZONE II AS PER IS 1893:2016.
600 19. DESIGN IS CARRIED OUT FOR MILD EXPOSURE CONDITION.

D 20. POSITION OF DRAIN PIPES IN TOILETS MAY VARY AS PER

300
ARCHITECTURAL REQUIREMENT & SHALL BE 250mm AWAY FROM
7460

CH1 LBY1 LBY1 CH2 SUPPORT.


21. CONCRETE AND STEEL MATERIAL TESTING AT OWNERS RISK.
RING 22. USE CURED MORTOR COVER BLOCKS OF SAME STRENGTH OF
PATTERN CONCRETE.
C1 LBX1 C1 LBX1 C1 LBX1 C1 LBX1 C1 23. USE SUPER PLASTICISER TO MAINTAIN WATER / CEMENT RATIO.
A 24. CURING EXPOSED SURFACE OF CONCRETE SHALL BE KEPT
CH2 CH2 CH2 CH2
115 D = 80mm CONTINUOUSLY IN WET CONDITION FOR MINIMUM 14 DAYS.
25. ALL HOT ROLLED MEMBERS SHALL CONFORM TO BSEN 10025-S275
OR EQUIVALENT.
26. ALL THE BUILT UP MEMBERS SHALL CONFORM TO ASTM A572 OR
8649 10500 10500 8649 BSEN 10025-S355.
08-16Ø 27. ALL WELDS ARE AWS STANDARD UNLESS OTHERWISE NOTED.
28. BOLTS FOR MAIN STRUCTURAL CONNECTIONS ARE ASTM A325.
29. BOLTS FOR BRACINGS, PURLINS, GIRTS ETC.. ARE GRADE 4.6
30. PAINTING SYSTEM AND ALL OTHER TERMS AS PER CONTRACTS.

DIA. Ld 10Ø
1 2 3 4 5 OF
BAR

8mm 400mm 80mm

10mm 500mm 100mm


LINTEL BEAM DETAILS
12mm 600mm 120mm
(LVL+3700) 16mm 800mm 160mm

20mm 1000mm 200mm

DRG. NO.- 03
MAIN STEEL SEISMIC ZONE - II
8MM@ 200C/C
DISTRIBUTION STEEL EXPOSURE CONDITION - MILD
8MM@ 300C/C
BASED ON IS: 456-2000, IS: 13920-2016, IS: 1893-2016, IS:875-1987.

100
PROJECT - DESIGN FOR PEB STRUCTURE

TITLE - LINTEL BEAM-LB- DETAILS

80
CLIENT - M/S. ABHAYA WOMEN ENTREPRENEUR ASSOCIATION, NAGPUR

800 ISO/ABHAYA/PEB /2022/DRG 03 OF 10 DATE - 19/04/2022

DESIGNED BY
VIKRANT R.NAIR
BE (Civil),
M.Tech.(Structures),
M.Tech.(Structural Dynamics
& Earthquake Engg.),
M.Tech.(Geotechnical Engg..),
MIE , PROFESSIONAL ENGINEER,
PE.No: 7006182

DETAIL OF LINTEL BEAM (PB) DETAIL OF CHAJJA SLAB