0% found this document useful (0 votes)
52 views6 pages

Ansa

Boq

Uploaded by

tsegayeterefe23
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views6 pages

Ansa

Boq

Uploaded by

tsegayeterefe23
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

STANDARD

LOCATION:- N/WOLLOELEMENTARY
Zone, Meket SCHOOL AnsawhaPrimary
Woreda,(1-8)
School

SPECIFICATION AND BILL OF QUANTITIES FOR


ELMENTARY SCHOOL (1-8), CLASS ROOM BLOCK ''A''

Item DESCRIPTION Unit Qty Amount


No Unit Price
A. Sub structure
1. Excavation and Earth Work
1.1 Clear the site to remove the top soll to an average depth of 20 cm
m2 354.67 -
1.2 Bulk ecavation to reduce levels to a depth of 80 cm starting from reduced G.L. (p.Q)
-
a) In ordinary soil
m3 183.12 -
b) Ditto but in soft rock
m 3
23.15 -
c) Ditto but in boulder rock
m3 - -
d) Ditto but in hard rock
m 3
- -
1.3 Excavation for footing foundation/pit/ not exceeding to depth of 1500mm starting from
Stripped ground level. - -
a) In ordinary soil
m3 -
b) Ditto but in soft rock
m 3
-
c) Ditto but in boulder rock
m3 - -
d) Ditto but in hard rock
m 3
- -
1.4 Excavate for foundation trenches in ordinary soil to a depth not eceeding 150 cm,
starting from reduced ground level G.L. (p.Q) - -
a) In ordinary soil
m3 39.47 -
b) Ditto but in soft rock
m 3
29.60 -
c) Ditto but in boulder rock
m3 - -
d) Ditto but in hard rock
m 3
- -
Fill around foundation with granular material imported from outside /quary/ and
1.5
compact in layers not exceeding 20 cm thick m3 86.90 -
Ditto but under hard core by sprinkling water insure 95% modified AASHTO dry density
1.6
(compact in layers not exceeding 20 cm thick) m3 180.00 -
Cart away surplus excavated material and deposit at a distance not exceeding 1 km
1.7
from the site m3 150.00 -
25 cm thick basaltic or equivalent stone hard core, well rolled, consolidated and blinded
1.8
with crushed stone m2 214.37 -
Totall Carried to summary -
2. Masonary work
40 cm thick hard basaltic or equivalent stone masonary foundation wall below NGL,
2.1
bedded and jointed in cement mortar 1:4 m3 46.89 -
40 cm thick hard tyachytic stone masonary foundation wall above ground level,
2.2
bedded and jointed in cement mortar 1:4 m3 35.00 -
2.3 ditto but for steps and Ramps.The price include plastering and 3cm thick cement screed
for ramps m3 6.72 -
60cm from the Base & 40cm thick at the Top, Hard basaltic or equivalent stone
2.4
masonary retaining wall , bedded and jointed cement mortar 1:4.(as per the Drawing) m3 - -
Totall Carried to summary -
3. Concrete work
3.1 5 cm thick lean concrete c-5, 150 kg cement/ of concrete, for:-
a) under footing pad
m2 - -
b) under masonary foundation wall
m2 73.50 -
Reinforced concrete, Concrete quality c-25, 360 kg cement/m3 of concrete, filled into
3.2 form work and vibrated around reinforcement. Form work and reinforcement measured
Separately. -
a) in Footing pad
m3
- -
b) in Footing column
m3 - -
c/ In R.C. grade beam
m3
5.85 -
In 10 cm thik R.C floor slab, concrete quality c-20 320 kg cement/m3 of concrete,
3.3
evenly spread. m2 214.37 -
Provide, cut and fix in position sawn zigba form work or equivalent, to sides of
3.4
- -
a/Footing pad
m2
- -
b/ Footing column
m2 - -
c/ grade beam
m2
74.71 -
3.5 Steel reinforcement , cut bend and placed in position. Unit price shall include cutting
bending placing in position and tying wire. - -
Ø6mm plain bars kg 120.00 -
Ø8 mm deformed bars kg 660.72 -
Ø12 mm deformed bars kg 365.00 -
Totall Carried to summary -
B. Super structure -
4. Concrete work
4.1 Reinforced concrete, class C-25, filled into form work and vibrated around
reinforcement bars. Form work and reinforcement measured Separately.

a/ elevation columns m3 2.76 -


b/ Intermidiate beam m3 - -
c/ R.C. top tie beam m3 3.71 -
d/ 6cm*25cm window sill. ml 24.80 -
4.2 Steel reinforcement, cut bent and placed in position. Unit price shall include cutting
bending placing in position and tying wire.
-
a) ø 6 mm plain bars kg 130.23 -
b) ø 12 mm deform bars kg 665.36 -
Provide, cut and fix in position sawn zigba wood form work or equivalent for:
4.3 -
a/ elevation columns m2 55.20 -
b/ Intermidiate beam m2 - -
c/ top tie beams m2 55.61 -
d/ 6cm*25cm window sill. m2 6.20 -
Totall Carried to summary -
5. Hollow Cencrete Block Work
5.1 hollow concrete block wall CLASS-C bedded in cement mortar 1:3 ratio.
a) 20x20x40 cm HCB m2 235.00 -
b) 15x20x40 cm HCB m2
- -
Totall Carried to summary -
6. Roofing
6.1

G-30 galvanized corrugated steel sheet roofing, tied to 5x7 cm zigba purlins at c/c 90
cm and 10-12 cm eucalypturs trusses. Each shall be firmly fixed with Ø6 mm plain bar to
concrete tie beam and column. All done according to roof truss drawing. Unit price
includes G-28 flat metal roof ridge cover and three coats of wood presevative paint to all
truss members and roof purlins. Horizontal projection of roof area shall be taken for
measurement.

m2 279.36 -
6.20 100cm development length G 28 flat sheet down pipe ml 63.00 -
6.30 Supply and fix G-28 Galvanized flat Sheet metal gutter of delompent length 500mm ml 63.00 -
Totall Carried to summary -
7. Carpentry and joinery
7.1
All structural members shall be well seasoned, Straight and free of any harmful defects.
Each truss joint shall be connected and with band iron and truss shall be firmly fixed to
concrete top tie beam with Ø6 mm plan bars unit rate is with out eucalptus

a/ 10-12 cm eucalyptus lower and upper member ml 460.00 -


b/ 8-10 cm eucalyptus bracing and internal member ml 283.00 -
c/ 5x7 cm Zigba purlin ml 372.50 -
7.2 Supply and fix 0.2 cm thick and 20cm width kararo or equivalent fascia board including
3 coats of weather resistant oil paint. ml 80.52 -
7.3
8 mm chipwood ceiling, devided in to 60x120cm panels, with 1cm recess between
joints, fixed to 5x4cm sawn zigba wood battens in both directions, including 2x4cm tid or
equivalent corner ceiling list.
m2 215.00 -
7.4
0.4mm thick ribbed sheet ceilling under eaves, unit price shall include 5*4cm sawn
zigba wood battens with c/c spacing of 60cm both ways corner list and all other
necessary accessaries.
m2 48.43 -
Totall Carried to summary -
8. Metal work
8.1
All metal doors and windows shall be fabricated from locally manufactured frame, LTZ
profile 38 mmx38mm x1.25 mm, with the necessary iron mongry, accessories and 3
coats synthetic enamel paint.

Type Door, size 90x300cm no 4 -


8.2 steel windows, as indicated on the door and window schedule, window size,
- -
a/ W3, 145*210cm no 16 -
b/ W5 200*50cm no 8 -
8.3 Rectangular hollow section steel pipe, verndah post size 60*60*3mm
thick and length = 3.5m, RHS price include one coat of antirust
and three coats of centetic enamail paint, as shown on the
drawing.
no 9 -
8.4 4mm gauge ventillation wire mesh at gable sides as per the drawing. no 2 -
Totall Carried to summary -
9. Plastering and pointing
9.1 Apply three coats of cement mortar plaster 1:3 ratio to all internal walls, columns and
beams m2 420.00 -
9.2 Apply two coats of plastering in cement mortar 1:3 to all external HCB wall with one coat
of tyrolin rendering. m2 98.60 -
9.3
Apply cement mortar pointing with 1:3 ratio to all exposed stone masonry above NGL.
m2 35.00 -
9.4
Apply deep pointing b/n wall, beam & column to with cement sand mortar 1:3 ratio
ml 362.00 -
Totall Carried to summary -
10. Paving and Flooring
10.1 5cm cement screed flooring, Filled in cement mortar 1:3 Unit price shall include
Smooth finishing and grid line pointing.
m2 215.00 -
10.2 10cm high cement tile skirting stuck to wall in cemnt mortar 1:2 ml 130.00 -
10.3
80cm wide and 8cm thick concrete Pavement all around the building bedded on
compacted granular material imported from outside.Price shall include selected material
and joint deep pointing in cement mortar 1:3.
m2 82.00 -
10.4 concret half open ditch 30cm diameter,with ratio of 1:3 mortar joint all round the building
including selected material and compaction. ml 83.00 -
Totall Carried to summary -
11. Glazing
11.1 Supply and fix 4 mm thick clear sheet glass panes, glazed to metal beads and putted
with approved quality of putty. For Doors & windows m2 62.00 -
11.2 Ditto as item No. 11 but 6 mm thick figured glass panes, glazed to metal beads and
putted with approved quality of putty. For Doors m2 - -
Totall Carried to summary -
12. Painiting
12.1 Apply three coats of approved type plastic paint to all internal, external plastered wall
and external columns and beam surfaces. m2 420.00 -
12.2 Ditto as Item 12.1, but for external tyroline rendered wall surfaces
m2
98.60 -
12.3 Ditto as Item 12.1, but to chipwood celling
m2 215.00 -
12.4 Apply three coats of approved type enamail paint to ribbed sheet ceilling.
m2
48.43 -
Totall Carried to summary -
13.Electrical Installation
1.0 Distribution boards SDB-CL should be made of sheet metal and have separate neutral
and ground busbars/ph
1 pc main switch MCB of 32A, 1-phase
3 pcs MCB of 10A, 1-phase
2 pcs MCB of 16A, 1-phase,
25% Reserve space

Complete with bus bar system of 63A, fixing No 1 -


1.1
Light points fed throug PVC conductor 2x2.5 mm2 in thermoplastic conduit of 16mm
under surface, including junction boxes with cover and screw type connectors with
insulating caps
No 24 -
2.00 Switches -
LEGRAND, SUNO, recessed or approved equivalent
-
2.10 single(774001+774041) No 5 -
2.20 Duoble(774005+774042) No 5 -
2.30 Two-Way(774006+774041) No 2 -
2.40
Intermediate(774007+774041) No 1 -
3.00
SOCKET OUTLET POINTS -
Socket outlet of 16A, 1-phase , with earthing contact fed through PVC conductor of
3.10 3x2.5mm2 in the thermoplastic conduit of 16mm running under surface including junction
boxes with covers and screw type connectors with insulating caps all complete
accessaries No 16 -
4.00
SOCKET OUTLETS -
4.10
(TYPE LEGRAND DECOR OR EQUIVALENT) -
4.20 Flush mounting singel socket outlet of 16A/1P. No 16 -
5.00 FEEDER CABLES -
PVC sheathed PVC insulated power cable type NYY 0.6/1KV or equivalent (Tentative
5.10 measurement)
-
5.20 3x4 mm² from CMDB to SDB-CL WITH PVCconduit of dia.32mm0 ML 10 -
6.00 LIGHT FITTING AND LAMPS -
6.10 (Specified or Equivalent) -
6.20 (Specified or Equivalent) osram incadesent lamp of 25w No 24 -
PHILIPS TMS 022/136 HFP with 1XTL'D 36W No 8 -
7.00 MANHOLE -
7.10 Manhole in HCB of 500x500x700mm mm including reinforced concrete cover with
lifting lug. No 1 -
8.00 Low Voltage Earthing system -
8.10 Copper Earthing rod of 16x2400mm No 1 -
8.20 Copper conductor of 1x4mm2 for Earthing Ml 10 -
Totall Carried to summary -
end of Specification for Class room (G+o) Block ''A''
STANDARD
LOCATION:- N/WOLLO ELEMENTARY
Zone, Meket Woreda, Ansawha
SCHOOL (1-8) Primary
School
CLASS ROOM BLOCK "A" SUMMERY
A. Sub structure Eth.Birr
1. Excavation and Earth Work -
2. Masonary work -
3. Concrete work -
Sub total (A) -
B. Super structure
4. Concrete work -
5. Hollow Cencrete Block Work -
6. Roofing -
7. Carpentery and Joinery -
8. Metal work -
9. Plastering and painting -
10. Paving and Flooring -
11. Glazing -
12. Painiting -
13.electrical instalation
Sub total ( B) -
Grand Total (A+B) -
Rebat ------ % , Eth. Birr:- -
After Rebat, Eth. Birr:- -
VAT (15%), Eth. Birr:- -
Grand Total for One Class Room Block, Eth. -