Halfaya Oil Field Surface Facility
Phase III Project
Request For Inspection (RFI)
PRID No: 3700 RFI Ref No: HFY3-3700-CIV-RFI-0004
Project Title: EPCC of ISF Camps ( 1,2 ) & CPS ( 1,2,3 ) RFI Issued Date & Time:13 .11.2017 & 0:00
Contractor: T. S. C. PMC-3 EXIDASP
Discipline: CIV ITP No: HFY3-3700-CIV-ITP-0001 ITP Activity Code & Intervention level:
Description of Inspection: compaction Test
We would like to inform you that T.S.C. ready to test the compaction of natural ground of
(check point 2) as discribed in the attached drawing, so you are kindly requested to inspected
this activity.
Do drawings need to be marked up/ red-lined due to site changes?
Y N (If " Yes ", then the RFI should only be signed once the Inspection Mark-up Drawings have
Tick Mark ( P )
been submitted along with the RFI.)
Attachments:
check list
The above mentioned activity has been Inspected by the Contractor.
Name: Position: Signature Date:
Saad Motlib Ali QA/QC Manager -------------------- 13.11.2017
Inspection Date: Inspection Time: Location/Area: Reference Docs / DWGs
14.11.2017 8:30:00 AM CHECK POINT 2
PMC3 Comments:
RFI Acceptance & Inspection Result
Acceptable Yes No
A Work is not ready at the Inspection time. New RFI shall be issued
Comments Code
B Result of Inspection is not acceptable. New RFI shall be issued
The above mentioned activity has been Inspected by the PMC3.
Name: Position: Signature Date:
Form No: 100
RFI Rev: 1
Inspection Checklist
EARTHWORK-EXCAVATION
Document # :
Report # PRID #: 3700 Project Name: ISF&CP Contractor : TSC
RFI #
Inspection Time Start: Finish: Inspection Date:
Dwg # / Line # : Area/Location: Check Point 2
Spec Reference : HFY-GEN-CIV-SP-0009 - Excavation, Backfill & Compaction
Inspector's Checklist
Inspector's Observation
Sr # Description of Activity
Yes No
Availability of DWG:
1
AFC drawing & Spec available at site
Surveying:
2 Survey setting-out done and excavated area marked (Survey report Yes No
attached).
Existing Underground Facilities:
Referring to site general survey and record documents is there any Yes No
existing UG facilities?
3 Yes No
If yes, One / All of the following action has been taken: UG facilities Explain:
were detected, exposed by manual excavation, protected, and/or ……………………………………………….
relocated.
Water Logging:
4 Yes No
Area prevented from surface water.
Barrication & Safety Signs:
5 Barriers and safety signs provided around Excavation area Yes No
Decision of Dumping Area:
6 Dumping Area for excavated materials decided and accepted. Yes No
Quarantine Un-Suitable Soil:
7 Suitable and Un-suitable soil separated and stocked at the Yes No NA
designated areas.
De-Watering:
Dewatering system installed and ground water discharged to
8 Yes No NA
approved area .
Depth & Profile: Yes No
9 Excavation done according to the depths and profiles shown in the
Drawing.
Over Excavation:
Over excavation treated as per specification.
10 Yes No NA
1. Fill with approved material in layers and do compaction OR
2. Fill blinding for structures.
Yes No NA
Protection during Deep Excavation:
Protection for deep excavation provided include one / all of the
11 Specify What Action Taken:
following:
Slope, Side Bracing, Sheet Pile. …………………………………………………………
Sufficient Excavation:
Excavations for structures shall be extended for a sufficient
12 Yes No NA
distance required for placing and removing of shuttering,
scaffolding and for inspection.
HSE Precautions:
13 Ensure that after excavation, area shall be cleaned and all HSE Yes No NA
precautions are taken place.
Contractor PMC
Name
Date
Signature