Request For Inspection (RFI) : Halfaya Oil Field Surface Facility Phase III Project

Uploaded by

mohkhaeng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views3 pages

Request For Inspection (RFI) : Halfaya Oil Field Surface Facility Phase III Project

Uploaded by

mohkhaeng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Halfaya Oil Field Surface Facility

Phase III Project


Request For Inspection (RFI)
PRID No: 3700 RFI Ref No: HFY3-3700-CIV-RFI-0004

Project Title: EPCC of ISF Camps ( 1,2 ) & CPS ( 1,2,3 ) RFI Issued Date & Time:13 .11.2017 & 0:00

Contractor: T. S. C. PMC-3 EXIDASP

Discipline: CIV ITP No: HFY3-3700-CIV-ITP-0001 ITP Activity Code & Intervention level:

Description of Inspection: compaction Test


We would like to inform you that T.S.C. ready to test the compaction of natural ground of
(check point 2) as discribed in the attached drawing, so you are kindly requested to inspected
this activity.

Do drawings need to be marked up/ red-lined due to site changes?

Y N (If " Yes ", then the RFI should only be signed once the Inspection Mark-up Drawings have
Tick Mark ( P )
been submitted along with the RFI.)

Attachments:

check list

The above mentioned activity has been Inspected by the Contractor.

Name: Position: Signature Date:

Saad Motlib Ali QA/QC Manager -------------------- 13.11.2017


Inspection Date: Inspection Time: Location/Area: Reference Docs / DWGs

14.11.2017 8:30:00 AM CHECK POINT 2

PMC3 Comments:

RFI Acceptance & Inspection Result


Acceptable Yes No
A Work is not ready at the Inspection time. New RFI shall be issued
Comments Code
B Result of Inspection is not acceptable. New RFI shall be issued
The above mentioned activity has been Inspected by the PMC3.

Name: Position: Signature Date:

Form No: 100


RFI Rev: 1
Inspection Checklist
EARTHWORK-EXCAVATION
Document # :
Report # PRID #: 3700 Project Name: ISF&CP Contractor : TSC
RFI #
Inspection Time Start: Finish: Inspection Date:
Dwg # / Line # : Area/Location: Check Point 2
Spec Reference : HFY-GEN-CIV-SP-0009 - Excavation, Backfill & Compaction

Inspector's Checklist
Inspector's Observation
Sr # Description of Activity

Yes No
Availability of DWG:
1
AFC drawing & Spec available at site

Surveying:
2 Survey setting-out done and excavated area marked (Survey report Yes No
attached).

Existing Underground Facilities:


Referring to site general survey and record documents is there any Yes No

existing UG facilities?
3 Yes  No
If yes, One / All of the following action has been taken: UG facilities Explain:
were detected, exposed by manual excavation, protected, and/or ……………………………………………….
relocated.

Water Logging:
4 Yes No
Area prevented from surface water.

Barrication & Safety Signs:


5 Barriers and safety signs provided around Excavation area Yes No

Decision of Dumping Area:


6 Dumping Area for excavated materials decided and accepted. Yes No

Quarantine Un-Suitable Soil:


7 Suitable and Un-suitable soil separated and stocked at the  Yes  No  NA
designated areas.
De-Watering:
Dewatering system installed and ground water discharged to
8  Yes  No  NA
approved area .

Depth & Profile: Yes No


9 Excavation done according to the depths and profiles shown in the
Drawing.

Over Excavation:
Over excavation treated as per specification.
10  Yes  No  NA
1. Fill with approved material in layers and do compaction OR
2. Fill blinding for structures.

 Yes  No  NA
Protection during Deep Excavation:
Protection for deep excavation provided include one / all of the
11 Specify What Action Taken:
following:
Slope, Side Bracing, Sheet Pile. …………………………………………………………

Sufficient Excavation:
Excavations for structures shall be extended for a sufficient
12  Yes  No  NA
distance required for placing and removing of shuttering,
scaffolding and for inspection.

HSE Precautions:
13 Ensure that after excavation, area shall be cleaned and all HSE  Yes  No  NA
precautions are taken place.

Contractor PMC
Name
Date

Signature