0% found this document useful (0 votes)
11 views5 pages

2024.07.05 Progress Report No. 1

Improvement of Al Khor St., UAQ - Progress Report

Uploaded by

nicole.basegc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views5 pages

2024.07.05 Progress Report No. 1

Improvement of Al Khor St., UAQ - Progress Report

Uploaded by

nicole.basegc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Client: Ministry of Energy & Infrastructure

Engineer: Road & Traffic Engineering

Contractor: Base General Contracting LLC

57/2023 IMPROVEMENT OF AL KHOR STREET, UAQ

PROGRESS
REPORT NO. 1
(up to July 5, 2024)
Project: 57/2023 Improvement of Al Khor Street, Umm Al Quwaain
PROGRESS REPORT NO. 1
As of: July 5, 2024

Backfilling works on road

57/2023 Improvement of Al Khor Street, UAQ Progress Report|Page 2 of 5


Project: 57/2023 Improvement of Al Khor Street, Umm Al Quwaain
PROGRESS REPORT NO. 1
As of: July 5, 2024

Preparation of formation

57/2023 Improvement of Al Khor Street, UAQ Progress Report|Page 3 of 5


Project: 57/2023 Improvement of Al Khor Street, Umm Al Quwaain
PROGRESS REPORT NO. 1
As of: July 5, 2024

Excavation, laying and backfilling of future ducts for various authorities

57/2023 Improvement of Al Khor Street, UAQ Progress Report|Page 4 of 5


Project: 57/2023 Improvement of Al Khor Street, Umm Al Quwaain
PROGRESS REPORT NO. 1
As of: July 5, 2024

Blinding for new kerbstone Installation of gully

57/2023 Improvement of Al Khor Street, UAQ Progress Report|Page 5 of 5