RS4 Case Study F2015
RS4 Case Study F2015
WANs
2-2 CCNA 2: WAN Technologies v3.1 Copyright ~ 2003, Cisco Systems, Inc.
Scenario
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
area 0
VLA N Limerick LAN
N VLAN VLAN VLA
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
area 0
VLA N Limerick LAN
N VLAN VLAN VLA
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
4-4 CCNA 4: WAN Technologies v3.1 Copyright ~ 2003, Cisco Systems, Inc.
Phase 2: Configuring Static and Default
Routes, RIP & OSPF Routing
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
VLA N
area 0
N VLAN VLAN VLA Limerick LAN
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
area 0
VLA N Limerick LAN
N VLAN VLAN VLA
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
Document the PP & NAT configuration in a chart; it will serve as the deliverable item for Phase 3.
Phase 4: Configuring ACLs
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
area 0
VLA N Limerick LAN
N VLAN VLAN VLA
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
area 0
VLA N Limerick LAN
N VLAN VLAN VLA
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
area 0
VLA N Limerick LAN
N VLAN VLAN VLA
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
DHCP Services
DHCP should provide services to the following LANs hosts:
Galway LAN,
Cork’s VLAN 2, VLAN 3 and VLAN 4
DHCP should pass the following parameters to the hosts:
IP address, Subnet Mask and Default Gateway
The Galway router will perform DHCP. Configure the Galway using the DHCP
pools documented in Phase 1.
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
area 0
VLA N Limerick LAN
N VLAN VLAN VLA
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
The Belfast router will perform NAT. Configure the Belfast router as follows:
Define the NAT pool. The pool consists of public network address
200.10.10.64/26. Exclude first 10 addresses from this pool (to be
used for public domain servers, when required).
Define an access control list, which will translate for all internal
(172.16.0.0/22) addresses only.
Establish dynamic source translation, specifying the NAT pool and the ACL
defined in the previous steps.
Specify the inside and the outside NAT interfaces.
Configure Static NAT so the Web Server can be accessed from the Internet
12-10 CCNA 4: WAN Technologies v3.1 Copyright ~ 2003, Cisco Systems, Inc.
Phase 8: Verification and Testing
S0/0/0
S0/0/0 209.165.200.6/30
Frame ISP
(Use a Router to
Galway Relay simulate the Derry
DCE Internet) 209.165.200.4/30
DCE
RIP V2 209.165.200.0/30
Galway LAN S0/1/0 10 hosts
S0/0/0 209.165.200.1/30
150 hosts
S0/0/0
S0/0/1
Cork S0/0/1 Belfast S0/0/0
Nat Outside PPP Link
G0/0 CHAP
G0/0
200.10.10.64/26 PPP Link Limerick
PAP
Nat Inside G0/0
172.16.0.0/22
OSPF 10
area 0
VLA N Limerick LAN
N VLAN VLAN VLA
2 99 Web Server
3 4 100 hosts
Belfast LAN
50 hosts
Cork VLANs
426 hosts (total)
Use
S0/0 the following instructions to complete
Frame InternetPhase 5:
(Use a PC to
Galway 1. Verify communication
Relay between various hosts in the network. Troubleshoot
simulate
DCE
and fix any problems in the network until10.0.0.2/30)
it works Galaway
properly. Document the
results of the
DCE
tests in a table.
2. RIP V2
Recapture and save the router configuration files for all four routers. Edit the
Fa0/0
Galway LAN text files, and include comments at the top of10.0.0.1/30
each file documenting the
S0/0
400 hosts following:
S0/0
– Your name S0/1
Cork
– The date S0/1 Belfast S0/0
Nat Outside PPP Link
– Fa0/0
CCNA4 Case Study –CHAP
Final RouterFa0/1
Configuration PPP Link Limerick
200.10.10.64/26
– The router name that corresponds to each file. PAP
Nat Inside Fa0/0
172.16.0.0/21
This documentation, along with the completed tables from Phase 1, Phase 2, Phase 3,
Phase4, Phase 5, Phase 6, and Phase 7, will serveBelfast
as theLAN
final deliverable item for the
case study.
VLA N
20 hosts
N VLAN VLAN VLA Limerick LAN
2 99
3 4 200 hosts
OSPF 10
Cork VLANs area 0
900 hosts (total)
12-11 CCNA 4: WAN Technologies v3.1 Copyright ~ 2003, Cisco Systems, Inc.
Phase 9: Case Study Deliverables
Documentation & Presentation
The final task in this case study is to deliver a 20 minutes presentation of the main features
of the design decisions and recommendations. A formal written report should also be
provided that contains all of the design documents as well as all the supporting worksheets
(see the case study requirements; Overview and Objectives on page 1).
The design documentation should include: device configurations, a list of the number and
types of networking devices selected for this design, logical and physical diagrams,
subnetting scheme, and network testing verifications. The completed tables from Phase 1,
Phase 2, Phase 3, Phase 4, Phase 6, Phase 6, Phase 7, and Phase 8 should be included with
the final deliverable items.
The following items must be included in the final report and presentation:
• Outline
• Summary of the Company and Network Requirements
• Discussion on the implementation of IP address and VLSM
• Discussion on the implementation of Routing
• Discussion on the implementation of VLANs, STP, and switches
• Discussion on the physical layer design and equipment
• Discussion on testing and verification strategies
• Recommendations for future network upgrades
• Logical Diagram
• Physical Diagram
• IP Addressing Table
• Router Interface Table
• Switch Table
• Equipment Table including quantity, make and model (Routers & Switches
ONLY)
• Show Commands outputs to verify connectivity and operation:
show ip route, show ip ospf neighbors, show spanning-tree, show vlan,
ping, telnet, etc.
• Router Configurations
• Switch Configuration
The documentation should be complete and should contain enough information to allow a
third party to properly install and configure or troubleshoot the network without requesting
additional information.
12-12 CCNA 4: WAN Technologies v3.1 Copyright ~ 2003, Cisco Systems, Inc.