Modification work
APH erosion rate will get minimise and elimination of
1 Modification work of BAC outlet line Box to be provided with divertion plate clinkeraization 2 Provision to operate air blaster in DCS Platform to be made in CFBC fly ash silo for 3 opening and closing of bulker door 4 Reduction of service air compressor power 5 Optimaisation in ACW pressure 6 Optimaisation in BFP power at low load 7 Optimisation of BFP Power by improvement in attemperator efficiency. 8 Optimize the Boiler Fans powerby optimise the pressure Drop 9 CHP Power consumption 10 Plant Heat rate rate improvement by DM water auto spray 11 Machine guarding as per safety satadard in belt conveyors with limit switch 12 Automation of Secondary air Upper& lower nozzle with respect to Boiler Loading 13 Firing the Alternative Fuel ratio 14 Proper Drainage to be required for reject water
15 proper coverage of HRSCC top to avoid bacterial
growth & foreign particles/ matter 16 proper Tagout and Tagin of drives to be provided