TRAIN 3 OF WARA PRESSURE MAINTENANCE PROJECT (NSK)
Project No. EF/1945, CONTRACT NO. 17052048
GENERATOR/WELDING DG CHECK LIST
Name of Operator :
Plate No./ Sl.No.: Capacity :
Project / Location : Model :
Week Start : Week End :
Sl. No Items to check Date of Inspection Remarks
Sat Sun Mon Tue Wed Thu Fri
1 Check for KOC Clearance Certificate
2 Check for Oil, Fuel, Water Leakage
3 Battery Electrolytes Level
4 Air Impeller / Radiator Coolant Level
5 Air Cleaner Dust Indicator
6 Cooling Fan
7 Check for Emission (Smoke)
8 Check wiring and Piping for loose Connection
9 Check correct function of each Instruments attached
10 Check grounding of Machine
11 Check output Power open Voltage
12 Check leads Status / Receptacles
13 Check Tires
14 Check Monthly Color coding Inspection Stickers
15 Check Fire Extinguisher
Contractor Supervisor / Foreman
Name :
Signature :
date: