0% found this document useful (0 votes)
26 views32 pages

Gypsum

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views32 pages

Gypsum

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 32

Work Schedule for External Development Works on South Side

SL No Description
Unit Total Qty Rate Amount REMARK

Part 4 - Draingae Works Base Price

EXTERNAL WATER SUPPLY SYSTEM


Providing and fixing electronic water Mtr. with direct
reading dial in KL with all internal parts in gunmetal or MAKE
1 brass, flanged distance piece for easy removal in future, CONSIDERED:
100mm dia strainer, 100 mm dia Bourden type pressure KENT
gauge and isolation cock complete in all respects.

Please mention - type required - Domestic/Bulk (Vane -wheel /


1.1 100MM DIA SET 1.00 4,500.00 4,500.00
Helical) & Capacity Flow per hour detail required

2 99712099720 -

With common burnt clay F.P.S.(non modular) bricks of class (Black Bituminous paint detail not mentioned in item for C.I. cover &
2.1 EACH 2.00 Err:508 Err:508
designation 7.5 Fixing / provision of sleeves details for water meter not clear.
MAKE
Providing and fixing cast iron double flanged butterfly - CONSIDERED:
3 valves conforming to IS 13095 PN 1.6 complete with bolts, - - ADVANCE/ mi
3.1 nuts,MM
100 3.0 DIA
mm thick compressed asbestos gasket. EACH - 1,650.00 - AUDCO/
ZOLOTO
Providing, fixing, jointing and testing in position the C.I. - MAKE
4 class LA pipe conforming to IS :1536 including all necessary - - CONSIDERED:
4.1 fittings
100 MM& DIAspecials such as bends, junctions etc., Lead Joint RM 60.00 1,100.43 66,025.98 NICO
Excavating trenches of requried width for pipes,
4.2 150 MM DIAincluding
cables,etc For STPexcavation for sockets and dressing of RM 140.00 1,742.48 243,947.03
sides ramming of bottoms depth upto 1.5 m including gtting -
out the excavated soil and then returning the soil as required
5 Pipes, cables etc. exceeding 80inmm dia.including
but not exceeding - -
in layers not exceeding 20 cm. depth
5.1 300 mm dia each deposited layer by ramming watering etc.
cosolidating RM 200.00 175.39 35,077.30
and disposing
Providing of surplus
and laying excavated
cement soils1:5:10
concrete as directed within: 5a
(1 cement -
lead of sand
coarse 50 m : 10 graded stone aggregate 40 mm nominal
6 - -
size) all-round CI- LA class pipes including bed concrete as
6.1 100 standard
per MM DIA design : RM 60.00 Err:508 Err:508 150 mm bed concrete, 75 mm allaround
6.2 150 MM DIA RM 140.00 Err:508 Err:508
- 100,000.00

Providing and making connection to EXT.water main


including cutting the existing C.I.L.A. line and fixing required
7 fitting with loose collars and lead joints including excavation, JOB 1.00 2,600.00 2,600.00 82,000.00
bailing out water, back filling, fixing strainer etc. complete in
all respects.

Total For External Water Supply System: Err:508

EXTERNAL STORM WATER DRAINAGE SYSTEMS

Providing, fixing, jointing and testing in position the following


uPVC pipes conforming to IS : 4985 of 10 kg/cm2 pressure MAKE
1 rating including all fittings like T - bend , elbow , reducer CONSIDERED: AKG Dr
etc .with solvent joint complete and making good the same PRINCE PIPE
complete as required.

1.1 160 MM DIA RM 85.00 1,225.75 104,188.67


MAKE
2 Providing and fixing Spun cast iron soil, waste, vent and rain water pipes conforming -to IS : 3989 including all fittings (plain or door) eg., bends,
CONSIDERED;
junctions, cowls,
NiKo offsets, access pieces jointing drip seal joints and painting also as per manufacturer's specification, and making good complete in all respects. FROM BASEMENT TO MANHOLE
2.1 200 MM DIA RM 80.00 3,770.90 301,672.25 KAPILANSH
Providing and laying cement concrete 1:5:10 (1 cement : 5
coarse sand : 10 graded stone aggregate 40 mm nominal
3 -
size) all-round UPVC & CI pipes including bed concrete as
3.1 160 MM DIA design :
per standard RM 85.00 Err:508 Err:508 150 mm bed concrete, 75 mm alaround
3.2 200 MM DIA RM 80.00 Err:508 Err:508
Providing and laying non-pressure class NP3 R.C.C. pipes with MAKE
collars jointed with stiff mixture of cement mortar in the proportion
4 of 1:2 (1 cement : 2 fine sand) including testing of joints etc. - - CONSIDERED:
4.1 complete
250 MM DIA: RM 400.00 Err:509 Err:509 JAI SPUN PIPE
4.2 300 MM DIA RM 70.00 Err:509 Err:509
4.3 400 MM DIA RM 235.00 Err:509 Err:509
Providing and laying cement concrete 1:5:10 (1 cement : 5
coarse sand : 10 graded stone aggregate 40 mm nominal size)
5 all-round on jointing collar ofRC.C. pipes over the bed concrete as - Mo l
per standard design : (Considered 150 mm thick alround) ,The cost
5.1 250
of PCCMM DIA
bed concrete shall be paid in seperate item. RM 75.00 Err:509 Err:509
5.2 300 MM DIA RM 14.00 Err:509 Err:509
5.3 400 MM DIA RM 45.00 Err:509 Err:509
Providing and laying cement concrete 1:5:10 (1 cement : 5
2b coarse sand : 10 graded stone aggregate 40 mm nominal size)
PCC bed and Hunches of 150 mm thickness for the RCC pipe.
250 mm dia RM 400.00 Err:509 Err:509
300 mm dia brick masonry circular type manhole 0.91 m
Constructing RM 70.00 Err:509 Err:509
400 mm dia
internal dia at bottom and 0.56m dia at top in cement RM 235.00 Err:509 Err:509
mortar 1:4 (1 cement :4 coarse sand), in side cement plaster
0.91
12 mm m thick
deep with
with cement
S.F.R.C.mortarcover1:3 and(1frame
cement (heavy duty,
: 3 coarse
HD-20 grade designation)
sand) finished with a floating560 coatmm internal
of neat diameter
cement, foundation
6 conforming
concrete 1:3:6 to I.S.
mix12592,
(1 cement total: weight
3 coarse of sand
cover: and frame to
6 graded - MAKE FOR
be notaggregate
stone less than 182 40 mm kg.,nominal
fixed in size),
cement andconcrete
making1:2:4 (1 - SFRC: JAI
cement
necessary
With : 2 channel
common coarse
burntsand
inclay :F.P.S.
cement4 graded(non stone
concrete 1:2:4
modular) aggregate
(1bricks
cement of20class
: 2mm
6.1 nominal
coarse sandsize)7.5
: including
4 graded centering,
stone aggregateshuttering20 mm all nominal
complete. EACH 11.00 Err:509 Err:509 SPUN PIPE
designation
(Excavation, foot
size) finished brick rests
with amasonry andcoat
floating 12mm thickcement,
of neat cement all plaster at
Constructing circular manhole 1.22 m
the
Extraexternal
completedepthas surface
for circular
per shall type
standard be paid
design :fordia
manhole separately)
0.91m internal: dia
internal dia at bottom and 0.56 m at top in cement -
(at bottom)
With common beyond 0.91m
burnt clay to 1.67m
F.P.S. sand)
(non modular) bricksplaster
of class
6.2 mortar 1:4 (1 cement :4 coarse inside cement RM 5.50 Err:509 Err:509
designation
1.68
12 mm mthick
deep 7.5
withwith SFRCmortar
cement Cover 1:3 and(1frame
cement (heavy duty
: 3 coarse
HD-20 grade designation)
sand) finished with a floating560 coatmm internal
of neat cement diameter
foundation
7 conforming
concrete 1:3:6 to I.S. 12592, :total
(1 cement weight
3 coarse sandof cover and frame
: 6 graded stoneto - MAKE FOR
be not less40
aggregate thanmm182 kg. fixed
nominal in and
size) cementmakingconcrete
necessary1:2:4 (1
- SFRC: JAI
cement
channel
With : 2cement
in
common coarse sand
burntconcrete
clay : 1:2:4
F.P.S.4 graded
(1 cement
(non stone: 2aggregate
modular) coarse
bricks 20
of class
7.1 mm
sandnominal
: 4 graded size) including
stone centering,
aggregate 20 mm shuttering
nominal all size) EACH 4.00 Err:509 Err:509 SPUN PIPE
designation 7.5
complete.
finished with (Excavation,
a floating coat foot ofrests
neatand 12 mmallthick
cement, completecement as
plaster
Extra at thefor
depth
per standard external : surface
circular
design type shall be paid
manhole 1.22 formseparately)
internal dia:
-
(at bottom)
With common beyond
burnt1.68clay m to 2.29
F.P.S. (nonm modular)
: bricks of class
7.2 RM 4.00 Err:509 Err:509
designation 7.5
Constructing brick masonry road gully chamber 50x45x60
cm with bricks in cement mortar 1:4 (1 cement : 4 coarse
8 -
sand)common
With includingburnt500 clay
x 450F.P.S.
mm pre-cast R.C.C. bricks
(non modular) horizontalof class
8.1 grating with frame EACH 35.00 Err:509 Err:509
designation 7.5 complete as per standard design :
Extra depth for masonry road gully chamber 50x45x60 cm
-
beyond 0.6 m to
With common 0.9 clay
burnt m : F.P.S. (non modular) bricks of class
8.2 MTR 2.00 Err:509 Err:509
designation 7.5
Providing M.S. foot rests including fixing in manholes with
20x20x10 cm cement concrete blocks 1:3:6 (1 cement : 3
9 - Price??
coarse sand trenches
Excavating : 6 graded of stone aggregate
requried width20 mm for nominal
pipes,
9.1 With 20x20
size) as per mm
cables,etc square
standard
including bar :
design
excavation for sockets and dressing of EACH 70.00 170.00 11,900.00
sides ramming of bottoms depth upto 1.5 m including gtting
out the excavated soil and then returning the soil as required
10 -
in layers not exceeding 20 cm. in depth including
all kinds of Soil
cosolidating each deposited layer by ramming watering etc. -
pipes cables
and disposing etc. exceedign
of surplus excavated80 mm dia but not exceeding
10.1 Providing
300 and constructing masonrysoils as directed
de-silting chamber within a RM 565.00 175.39 99,093.37
lead mm
pipes
2.0x2.0mofcables
50with
m etc. exceedign
required depth300 mmwith
inside dia but not exceeding
75 class designated
10.2 RM 305.00 272.95 83,250.51
600 mm
brick work in cement mortar 1:6
Construction of Rectangular type(1cement
rain water : 6harvesting
fine sand)pit with
870.00
C.I
sizedouble
5.5x2.5x3sealm medium
effective duty 560mm
depth dia re-charging
manhole cover
11 Providing
(2Nos.). and constructing oil andfor the
grease separator of storm
sand chamber -
water runtop
2.0x1.5m offslab
with
1:2:4 mix civil
including
requiredthe depth
(1cement
work with
inside
: 2coarse
following
withsize)
75 class
:4
graded
De-Silting stone
specification aggregate
Chamber:
[Construction 20mm
of nominal
Chamber]. with designated
minimum -
brick
1.5% work in cement foundation
reinforcement, mortar 1:6 concrete
(1cement1:5:10 : 6 fine(1sand)cement with:
560mm dia C.I double seal medium duty manhole cover -
5 fine sand : 10 grade stone aggregate 20mm nominal size
(2Nos.)
Oil and top
including slabwall,
Grease
baffle 1:2:4necessary
mix (1Chamber:
Separator cement : 2 coarse
excavation, backsand filling: 4and -
graded stone
disposalpercolation aggregate
of surface earth.20mm
Complete nominal with size) with
inlet,reverse
outlet minimum
and
Drilling borehole 300mm dia with rotary: 5 -
1.5%
overflow reinforcement
arrangement. foundation
Foot concrete 1:5:10 (1 cement
methodsandinsize
Drilling:
fine all types
and 10 of soil
graded uprest @m400mm
to aggregate
80 (approx.) c/c,depth
grating of
-
required
Providing
including andwith
cost 16mm stone
constructing
for mobilizationsq.bars andand
Rectangular
of rig frame
type20mm
making@ rain nominal
20mmwater
good clear
the
size
spacingincluding
harvesting fixed
pit attwo
size brickofmasonry
month
5.5x2.5x3 pipeeffective
as baffle
per site walls,
depth with
conditions
inside necessary
and75
with -
area upon
excavation, completion
back brick
filling of work.
and Contractor
disposal of motor shall
surface arrange for
direction
class
Providing ofand
Engineer
designated layinguPVCinwork
peacharge. (As
in cement
gravel per
all6 around Attached 1:6earth
drawing)
(1cement :
all
160 necessary
mm dia
compete with tools,
slotted
inlet, water
outlet, and
pipeconsumable
PVC of
coated Kg/cmfoot -the
35 casing
2 and
rest. laying
m
(As -40m
per
pipe.
foror as - No. of Boring Required
6 coarse sand) with 560 mm dia C.I double seal medium
drilling.
per site sub-strata
Attached drawing) or set as per direction of Engineer- in -
duty manhole cover with top slab 1:2:4 mix (1cement : 2
charge
160 mmsand dia uPVC blindstone
pipe aggregate
of 6 Kg/cm2. -
course :4 graded 20mm nominal size)
with
Rainminimum 1.5% reinforcement
Water Harvesting Pit Filtration , foundation
Chamber: concrete -
1:5:10 (1cement : 5 fine sand and 10 graded stone)
-
aggregate
Rate 20mm nominal
shall include excavation,size back
includingfilling500mm
and all depth.
other Tentative - Rate for B/W Harvesting Pit for Complete Item
11.1 Boulder 10-20mm, 500mm depth, gravel 5-10mm size, EACH 4.00 370,000.00 1,480,000.00
operations necessary for completing the job. (Detail required)
500mm depth coarse sand 1.5-2.0mm including necessary
excavation, back filling and disposal of surface earth
Total for External Water Storm Water Drainage Systems Err:509
complete with inlet, outlet, overflow arrangement pvc coated
Foot Rest, 100mm dia deep holes @ 500mm c/c to be
provided 1200 c/cSystem
Garden Hydrant above the bottom of
(Irrigation wall, 100mm C.I vent
System)
pipe -2m height with cowls. (As per Attached drawing)
Providing & laying UPVC pressure pipes of 6Kg/Sq.cm
UPVC PIPE
pressure rating class V (IS : 4985-2000) including fittings,
CONSIDERED
tees, bends, clamps, coupling and adaptors supports, and
1 10Kg/Sq.cm AKG , Ajay
jointing with solvent joint, testing and & fittings and thrust
class V Make:
blocks at bends as per standard design (For garden
Prince Pipe
hydrants).

1.1 32 mm outer dia RM 580.00 142.15 82,447.93


1.2 40 mm outer dia RM 60.00 171.44 10,286.61
1.3 50 mm outer dia RM 125.00 226.44 28,305.35
1.4 63 mm outer dia RM 50.00 286.57 14,328.30
1.5 75 mm outer dia RM 220.00 416.89 91,715.85

Providing, Fixing, Testing & Commissioning of full way lever


operated forged brass ball valve of brass body with forged Make
2 brass hard chromeplated steel ball tested to a pressure - Considered:
rating of PN 16 with threaded / flanged joints complete with Zoloto
nuts, bolts, gaskets, washers union etc.

2.1 25 MM DIA EACH 10.00 425.00 4,250.00

Providing, laying, jointing and testing, GI medium class


pipes conforming to IS:1239, with all fittings couplings,
3 - Make : Jindal
adapters including two or more Coats of synthetic enamel
paint over a coat of primer complete in all respect .

3.1 25 MM DIA RM 15.00 268.48 4,027.16 Basic Rate of Pipe as per Class B

Constructing brick masonry chamber 30x30x50cms inside


with 1st class brick work in cement mortar 1:5 (1
cement : 5 fine sand) for stop cock with CI surface box
100x100x75mm (inside) with hinged cover fixed in cement
concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4
graded stone aggregate 20mm nominal size)necessary
4 EACH 10.00 Err:508 Err:508
excavation foundation concrete 1:5:10 (1 cement : 5 fine
sand : 10 graded stone aggregate 40mm nominal size) and
inside plastering with cement mortar 1:3 (1 cement 3 coarse
sand) 12mm thick
Constructing masonryfinished with a 60x45x50
Chamber floating coat cmofinside,
neat in
cement
brick workcomplete
in cement as per standard
mortar 1:4 (1design.
cement(For Gardensand)
: 4 coarse
Hydrant)
for water meter & butterfly valve complete with C.I. double
flap surface box 400x200x200 mm (inside) with locking
arrangement and RCC top slab 1:2:4 mix (1 cement : 2
coarse sand trenches
Excavating : 4 graded of stone aggregate
requried width20 mmfor nominal
pipes, -
With
size) common
, i/c necessary
cables,etc burnt clay
including F.P.S.(non
excavation,
excavation for modular)
foundation bricks
socketsconcrete
and of class
1:5:10
dressing of(
4.1 EACH 1.00 Err:508 Err:508
designation
1 cement
sides ramming: 57.5
fine
of sand:10
bottoms graded
depth uptostone1.5aggregate
m including40 mm
nominalout
getting size)theand inside plastering
excavated soil and thenwith returning
cement mortar
the soil1:3as(1
5 cementcables
required
Pipes, : in
3 coarse
layers sand)
etc. not
not 12 mm thick,
exceeding
exceeding 20
80 cm.
mm finished
in depth
dia. with
but a floating
including
upto 80 mm -
5.1 coat
dia of neat
cosolidating cement
each complete
deposited as
layer per
by standard
ramming design
watering : etc. RM 580.00 175.39 101,724.17
and including of sand bedding all alround the pipes &
disposing of surplus excavated soils as directed within a lead
of 50 m
Total for Garden Hydrant System ( Irrigation System ) Err:508

SUB TOTAL Err:508


SERVICE TAX @ 5.6% Err:508
SBC @ 0.2% Err:508
KKC @ 0.2% Err:508
Labour Cess @ 1% Err:508
GRAND TOTAL Err:508
(RUPEES FIFTY NINE LAKH THIRTY TWO THOUSAND ONLY.)

PN.: TERMS AS PER LETTER ATTACHED.

FOR RAJESH INDUSTRIAL PROJECTS PVT. LTD.

AUTH. SIGN.
Comparison of Storm Water works at Reach Airia Mall

S.No. Description Unit Qty Rate Amount

Providing and laying non-pressure class NP3 R.C.C. pipes with


collars jointed with stiff mixture of cement mortar in the
1 proportion of 1:2 (1 cement : 2 fine sand) including testing of
joints etc. complete :

250 mm dia RM RO
300 mm dia RM RO
400 mm dia RM 55 -

Providing and laying cement concrete 1:5:10 (1 cement : 5


coarse sand : 10 graded stone aggregate 40 mm nominal size)
all-round on jointing collar ofRC.C. pipes over the bed concrete as
2a per standard design : (Considered 150 mm thick alround) , CPWD
Specs fig 19.11 The cost of PCC bed concrete shall be paid in
seperate item.

250 mm dia RM RO
300 mm dia RM RO
400 mm dia RM 11 -
Providing and laying cement concrete 1:5:10 (1 cement : 5
2b coarse sand : 10 graded stone aggregate 40 mm nominal size)
Haunches for the RCC pipe.
250 mm dia RM RO
300 mm dia RM RO
400 mm dia RM 55 -
0.91 m deep with S.F.R.C. cover and frame (heavy duty, HD-
20 grade
finished designation)
with a floating coat 560 ofmm
neatinternal
cement, diameter
foundation conforming
concreteto
3 I.S. 12592,
1:3:6 mix (1total weight
cement : 3 of coversand
coarse and :frame to bestone
6 graded not less than 182
aggregate
kg., fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 20 mm nominal size) including centering,
Nos. 2 -
With common
shuttering all burnt clay F.P.S.
complete. (non modular)
(Excavation, bricks
foot rests of 12mm
and class thick
designation
Constructing
cement 7.5
plaster brick
at masonry
the external circular
surface manhole
shall be 1.5 m
paid for internal
Extraat depth for circular typediamanhole
at top in0.91m internal
mortardia1:4(at
4 dia bottom
separately)
bottom) :
beyond
and
0.91m
0.56 m
to 1.67m
cement (1 RM 1 -
cement
With common:4 coarse sand) inside cement plaster 12 mm thick with
1.68
cement deep burnt
m mortar with SFRCclay F.P.S.
Cover (nonandmodular)
frame bricks ofduty
sand)(heavy
class
finished with HD-
designation
20 grade 7.5 1:3 (1 cement
designation)
: 3 coarse
560foundation
mm internal diameter
a
floating coat of neat cement concrete 1:3:6 (1
5 conforming to I.S. 12592,
cement : 3 coarse sand : 6total weight
graded of cover
stone and frame
aggregate 40 mmto be
not less than
size) 182
and kg. fixednecessary
in cementchannel
concretein1:2:4 (1 concrete
cement :
nominal
2 coarse
making
sand :: 24 coarse
gradedsand stone
cement Nos. 2 -
1:2:4 (1 cement : 4 aggregate
graded stone 20 mm nominal
aggregate 20
size) including
mm nominal centering,
size) finishedshuttering all complete.
with a floating (Excavation,
coat of neat cement, all
foot rests as
complete and 12standard
per mm thickdesign cement : plaster at the external surface
shall be paid for separately) :
With common burnt clay F.P.S. (non modular) bricks of class
designation 7.5
Extra depth for circular type manhole 1.5 m internal dia (at
6 bottom) beyond 1.68 m to 2.29 m :
RM 2 -
With common burnt clay F.P.S. (non modular) bricks of class
designation 7.5

7 Constructing Brick Buffel wall inside 1.5 m Internal dia Nos. 1 -

TOTAL -
Service Tax @ 6% -

Labour Cess @1% -


GRAND TOTAL -
Comparison of Storm Water works at Reach Airia Mall
M/s Paramaah M/s Rajesh Industrial
S.No. Description Unit Qty Rate Amount Rate Amount

Providing and laying non-pressure class NP3 R.C.C. pipes with


collars jointed with stiff mixture of cement mortar in the
1 proportion of 1:2 (1 cement : 2 fine sand) including testing of
joints etc. complete :

250 mm dia RM RO 1,230


300 mm dia RM RO 1,760
400 mm dia RM 55 Material 900
rate 49,500 2,620 144,100
is Rs 1400 +
taxes
Providing and laying cement concrete 1:5:10 (1 cement : 5
coarse sand : 10 graded stone aggregate 40 mm nominal size)
2 all-round RC.C. pipes including bed concrete as per standard
design : (Considered 150 mm thick alround + 150 mm pcc bed),
width & height 750mm, CPWD Specs fig 19.11

250 mm dia RM RO 1,050


300 mm dia RM RO 1,280
400 mm dia RM 55 800 44,000 1,750 96,250

finished with a floating coat of neat cement, foundation concrete


3 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate

0.91 m deep with S.F.R.C. cover and frame (heavy duty, HD-
20 grade designation) 560 mm internal diameter conforming to
I.S. 12592, total weight of cover and frame to be not less than 182
kg., fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 20 mm nominal size) including centering,
Nos. 3 9,000 27,000 15,750 47,250
shuttering all complete. (Excavation, foot rests and 12mm thick
cement plaster at the external surface shall be paid for
separately) :

With common burnt clay F.P.S. (non modular) bricks of class


designation 7.5
-
Extra depth for circular type manhole 0.91m internal dia (at
4 bottom) beyond 0.91m to 1.67m
RM 2 4,000 8,000 10,000 20,000
With common burnt clay F.P.S. (non modular) bricks of class
designation 7.5
floating coat of neat cement foundation concrete 1:3:6 (1
5 cement : 3 coarse sand : 6 graded stone aggregate 40 mm
1.68 m deep with SFRC Cover and frame (heavy duty HD-
20 grade designation) 560 mm internal diameter
conforming to I.S. 12592, total weight of cover and frame to be
not less than 182 kg. fixed in cement concrete 1:2:4 (1 cement :
2 coarse sand : 4 graded stone aggregate 20 mm nominal
Nos. RO
size) including centering, shuttering all complete. (Excavation,
foot rests and 12 mm thick cement plaster at the external surface
shall be paid for separately) :

With common burnt clay F.P.S. (non modular) bricks of class


designation 7.5

Extra depth for circular type manhole 1.22 m internal dia (at
6 bottom) beyond 1.68 m to 2.29 m :
RM RO

With common burnt clay F.P.S. (non modular) bricks of class


designation 7.5

TOTAL 128,500 307,600


Service Tax @ 6% 7,710 18,456

Labour Cess @1% 1,285 3,076


GRAND TOTAL 137,495 329,132
Estimate
Rate Amount

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508
Err:508

Err:509

Err:508
Err:508

Err:508
Err:508
BASIC RATES
G.I. Pipes - Class B (Medium Duty)
25mm Dia Rmt 110
C.I. Pipes - Class LA Confirming to I.S. 1536 (Rates incl. GST 18%)
100mm Dia Rmt 872
150mm Dia Rmt 1416
200mm Dia Rmt 2072
250mm Dia Rmt 2792
300mm Dia Rmt 3600

NP2 Pipe 400mm Dia Rmt 1100


Manhole Cover 560 mm Dia - Class - HD 20 Nos 1250
Cement OPC 43 Grade Bag 280
Cement PPC Bag 280
Aggregate 10mm Cum 1550
Aggregate 20mm Cum 1450 1765.5
Aggregate 40mm Cum 1350
Coarse Sand Zone III Cum 1550
Fine Sand Cum 800

Bricks - Designation Class 7.5 Nos 4.5


Mason 1st Class (For 8 Hours) Day 387.66
Mason 2nd Class (For 8 Hours) Day 351.11
Beldar / Bhisti / Labour (For 8 Hours) Day 318.46
Fitter / Welder /Blacksmith 1st Class (For 8 Hours) Day 426.426
Fitter / Welder/blcksmith 2nd Class (For 8 Hours) Day 386.221

RATE ANALYSIS FOR EXTERNAL SERVICES WORKS


SUB HAED - EXTERNAL WATER SUPPLY SYSTEM
Description of Item Unit Quantity Rate Amount
99712099720
With common burnt clay F.P.S.(non modular) bricks of class designation 7.5
Excavation Rmt 1.66 130 215 1.21 1.06 4.54 0.454
PCC - (1:5:10) Cum 0.13 Err:508 Err:508 1.06 0.91 3.94 0.394
Brick Work (1:4) Cum 0.35 Err:508 Err:508
RCC slab 1:2:4 Cum 0.24 Err:508 Err:508 2.1
Form Work Cum 1.44 320 460 1.05
Inside Floating coat of Cement with plaster Cum 1.32 Err:508 Err:508 0.27
Surface Box including Bitumin Paint /Other Paint Nos 1.00 450 450
Misc. Charges @ 3% for cutting & fixing of sleeves in walls LS Err:508
Total Cost - A Err:508
Water Charges 1% Err:508
Electricicty Charges 2%
Total Amount - B Err:508
Add Contractor Prophit @ 15% Err:508
Total Cost for 1 Chamber Err:508
Rate for 1 Rmt Err:508
Add Service Tax @ 6% Err:508
Total Rate for 1 Chamber Err:508

Description of Item Unit Quantity Rate Amount

Excavating trenches of requried width for pipes, cables,etc


including excavation for sockets and dressing of sides ramming of
bottoms depth upto 1.5 m including gtting out the excavated soil and
then returning the soil as required in layers not exceeding 20 cm. in
depth including cosolidating each deposited layer by ramming watering
etc. and disposing of surplus excavated soils as directed within a lead
of 50 m of cost for 110m length of a pipe of an average dia. say 200mm
Details
Slope
Pipes, assumed 1 in
cables etc. 200. Earth
exceeding 80work and but
mm dia. filling-
not exceeding 300 mm dia
Minimum depth of trench = 0.75+0.20 = 0.95m Average depth =
(1.50+0.95)/2 = 1.225M
Cost of 1 M
Width = 0.40 + 0.20 = 0.60 m
Machinary / Manpower
110x0.60x1.225 = 80.85 cum
5% for collars = 4.04 cum
Total Qty 85 Cum in 110 M Trench Excavation Rmt 0.7727273 194.91525 151
Total Cost - A 151
Water Charges 1% 2
Electricicty Charges 2%
Total Amount - B 153
Add Contractor Prophit @ 15% 23
Total Cost for 1 Rmt 175
Rate for 1 Rmt 175
Add Service Tax @ 6% 11
Total Rate for 1 Rmt 186
Excavating trenches of requried width for pipes, cables,etc
including excavation for sockets and dressing of sides ramming of
bottoms depth upto 1.5 m including gtting out the excavated soil and
then returning the soil as required in layers not exceeding 20 cm. in
Details of cost for
depth including 60 m length
cosolidating of adeposited
each pipe of anlayer
average dia. say watering
by ramming 200mm
Slope assumed
etc. and 1 inof
disposing 200. Earthexcavated
surplus work and soils
filling-
as directed within a lead
Minimum
of 50 m depth of trench 0.75+0.45= 1.20m
pipes cables
Average etc.=exceedign
depth 300 mm
(1.50+1.20)/2 dia but not exceeding 600 mm
= 1.35
Width = 0.40 + 0.45 = 0.85 m
Cost of 1 M
60x0.85x1.35 = 68.85 cum
Machinary / Manpower
5% for collars = 3.44 cum
Total = 72.29 cum
Total Qty 72.29 Cum in 60 M Trench Excavation Rmt 1.2048333 194.91525 235
Total Cost - A 235
Water Charges 1% 2
Electricicty Charges 2%
Total Amount - B 237
Add Contractor Prophit @ 15% 36
Total Cost for 1 Rmt 273
Rate for 1 Rmt 273
Add Service Tax @ 6% 16
Total Rate for 1 Rmt 289
Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse
6 sand : 10 graded stone aggregate 40 mm nominal size) all-round CI- LA
class pipes including bed concrete as per standard design :

6.1 100 MM DIA (Make - Kapilansh


Cost of 10 M
100mm dia. spun iron pipes (in 5.5 m lengths) Weight of 1 m pipes =
MaterialKg
19.820 :
Weight of 10m pipes 19.820x10 = 198.20 Kg
Centrifugally (Spun) C.I. Pipe class - LA 100mm dia Rmt 10 872 8,720
Tycon rings Nos 3 23 69
Carriage of Spun iron S & S pipes 100 mm dia Rmt 10 4 35
Misc. Charges @ 1% LS 88
Labour:
Fitter / Welder /Blacksmith 1st Class (For 8 Hours) Day 0.17 426 72
Fitter / Welder/blcksmith 2nd Class (For 8 Hours) Day 0.17 386 66
Beldar / Bhisti / Labour (For 8 Hours) Day 1.33 318 424
Total Cost - A 9,474
Water Charges 1% 95
Electricicty Charges 2%
Total Amount - B 9,569
Add Contractor Prophit @ 15% 1,435
Total Cost for 10 Rmt 11,004
Rate for 1 Rmt 1,100
Add Service Tax @ 6% 66
100mm C.I. Class LA - Pipe - Total Rate for 1 Rmt 1,166
Providing, fixing, jointing and testing in position the C.I. class LA pipe
6 conforming to IS :1536 including all necessary fittings & specials such
as bends, junctions etc., Lead Joint

6.1 150 MM DIA For STP


Cost of 10 M
150mm dia. spun iron pipes (in 5.5 m lengths) Weight of 1 m pipes =
MaterialKg
32.180 :
Weight of 10m pipes 32.180x10 = 321.80 Kg
Centrifugally (Spun) C.I. Pipe class - LA 100mm dia Rmt 10 1,416 14,160
Tycon rings Nos 3 29 87
Carriage of Spun iron S & S pipes 100 mm dia Rmt 10 5 50
Misc. Charges @ 1% LS 143
Labour:
Fitter / Welder /Blacksmith 1st Class (For 8 Hours) Day 0.17 426 72
Fitter / Welder/blcksmith 2nd Class (For 8 Hours) Day 0.17 386 66
Beldar / Bhisti / Labour (For 8 Hours) Day 1.33 318 424
Total Cost - A 15,002
Water Charges 1% 150
Electricicty Charges 2%
Total Amount - B 15,152
Add Contractor Prophit @ 15% 2,273
Total Cost for 10 Rmt 17,425
Rate for 1 Rmt 1,742
Add Service Tax @ 6% 105
150mm C.I. Class LA - Pipe - Total Rate for 1 Rmt 1,847
Providing and fixing Spun cast iron soil, waste, vent and rain water
pipes conforming to IS : 3989 including all fittings (plain or door) eg.,
bends, junctions, cowls, offsets, access pieces jointing drip seal joints
and painting also as per manufacturer's specification, and making good
complete in all respects.
FROM BASEMENT TO MANHOLE

200 mm dia - Rate Analysis for For 10 Rmt. Pipe


Material :
200mm Dia - Cast Iron S & S (Class B) Rmt 10 3,044 30,440.00
Tycon rings Nos 3 60 180
Carriage of Spun iron S & S pipes 100 mm dia @ 470 Kg Rmt 10 12 120
Misc. Charges @ 1% LS 307
Labour:
Fitter / Welder /Blacksmith 1st Class (For 8 Hours) Day 0.4 426 171
Fitter / Welder/blcksmith 2nd Class (For 8 Hours) Day 0.5 386 193
Beldar / Bhisti / Labour (For 8 Hours) Day 1.33 318 424
Total Cost - A 31,835
Water Charges 1% 318
Electricicty Charges 2% 637
Total Amount - B 32,790
Add Contractor Prophit @ 15% 4,919
Total Cost for 10 Rmt 37,709
Rate for 1 Rmt 3,771
Add Service Tax @ 6% 226
Total Rate for 1 Rmt for Pipe Dia 75mm 3,997

Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse


sand : 10 graded stone aggregate 40 mm nominal size) all-round CI- LA
class pipes including bed concrete as per standard design :

100 mm dia - Rate Analysis for For 17 Rmt. Pipe = 1 Cum (PCC) - All Roun 0.059 17.00 1.00
Material :
Total Cost of M-5 (1:5:10) Cum 1 Err:508 Err:508
Misc. Charges @ 3% LS Err:508
Labour:
Mason - 1st Class Day 0.1 351 35
Beldar Day 0.5 318 159
Total Cost - A Err:508
Water Charges 1% Err:508
Electricicty Charges 2%
Total Amount - B Err:508
Add Contractor Prophit @ 15% Err:508
Total Cost for 17 Rmt Err:508
Rate for 1 Rmt Err:508
Add Service Tax @ 6% Err:508
PCC 1:5:10 All Around - Total Rate for 1 Rmt for Pipe Dia 100mm Err:508

Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse


sand : 10 graded stone aggregate 40 mm nominal size) all-round CI- LA
class pipes including bed concrete as per standard design :

150 mm dia - Rate Analysis for For 13 Rmt. Pipe = 1 Cum (PCC) - All Roun 0.077 13.00 1.00
Material :
Total Cost of M-5 (1:5:10) Cum 1 Err:508 Err:508
Misc. Charges @ 3% LS Err:508
Labour:
Mason - 1st Class Day 0.15 351 53
Beldar Day 0.6 318 191
Total Cost - A Err:508
Water Charges 1% Err:508
Electricicty Charges 2% Err:508
Total Amount - B Err:508
Add Contractor Prophit @ 15% Err:508
Total Cost for 13 Rmt Err:508
Rate for 1 Rmt Err:508
Add Service Tax @ 6% Err:508
PCC 1:5:10 All Around - Total Rate for 1 Rmt for Pipe Dia 150mm Err:508

Constructing brick masonry circular type manhole 0.91 m internal dia at


bottom and 0.56m dia at top in cement mortar 1:4 (1 cement :4 coarse
sand), in side cement plaster 12 mm thick with cement mortar 1:3 (1
cement : 3 coarse sand) finished with a floating coat of neat cement,
foundation concrete 1:3:6 mix (1 cement : 3 coarse sand : 6 graded
stone aggregate 40 mm nominal size), and making necessary channel in
cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) finished with a floating coat of neat
cement, all complete as per standard design :
160 mm dia - Rate Analysis for For 14.9 Rmt. Pipe = 1 Cum (PCC) -
All Round 75mm 0.067 14.90 1.00
Material :
Total Cost of M-5 (1:5:10) Cum 1 Err:508 Err:508
Misc. Charges @ 3% LS Err:508
Labour:
Mason - 1st Class Day 0.1 388 39
Beldar Day 0.5 318 159
Total Cost - A Err:508
Water Charges 1% Err:508
Electricicty Charges 2%
Total Amount - B Err:508
Add Contractor Prophit @ 15% Err:508
Total Cost for 14.9 Rmt Err:508
Rate for 1 Rmt Err:508
PCC 1:5:10 All Around 75mm - Total Rate for Add Service
1 Rmt Tax @Dia
for Pipe 6% Err:508
160mm Err:508

Constructing brick masonry circular type manhole 0.91 m internal dia at


bottom and 0.56m dia at top in cement mortar 1:4 (1 cement :4 coarse
sand), in side cement plaster 12 mm thick with cement mortar 1:3 (1
cement : 3 coarse sand) finished with a floating coat of neat cement,
foundation concrete 1:3:6 mix (1 cement : 3 coarse sand : 6 graded
stone aggregate 40 mm nominal size), and making necessary channel in
cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) finished with a floating coat of neat
cement, all complete as per standard design :
200 mm dia - Rate Analysis for For 13 Rmt. Pipe = 1 Cum (PCC) -
All Round 75mm 0.078 12.75 1.00
Material :
Total Cost of M-5 (1:5:10) Cum 1 Err:508 Err:508
Misc. Charges @ 3% LS Err:508
Labour:
Mason - 1st Class Day 0.1 388 39
Beldar Day 0.5 318 159
Total Cost - A Err:508
Water Charges 1% Err:508
Electricicty Charges 2%
Total Amount - B Err:508
Add Contractor Prophit @ 15% Err:508
Total Cost for 12.7 Rmt Err:508
Rate for 1 Rmt Err:508
PCC 1:5:10 All Around 75mm - Total Rate for Add Service
1 Rmt Tax @Dia
for Pipe 6% Err:508
160mm Err:508

Providing, fixing, jointing and testing in position the following uPVC


pipes conforming to IS : 4985 of 10 kg/cm2 pressure rating including all
fittings like T - bend , elbow , reducer etc .with solvent joint complete
and making good the same complete as required.

160 mm dia - Rate Analysis for For 10 Rmt. Pipe


Material :
75mm Dia - Pipe - Class V - 10kg/sqcm. Rmt 10 716 7,160.00
Add 30% for fittings and wastage etc. on (X) 105.00 30 * X / 100 for Class V L.S 2,148.00
Misc. Charges @ 3% LS 279
Labour:
Fitter / Welder /Blacksmith 1st Class (For 8 Hours) Day 0.33 426 141
Fitter / Welder/blcksmith 2nd Class (For 8 Hours) Day 0.88 386 340
Beldar Day 0.88 318 280
Total Cost - A 10,348
Water Charges 1% 103
Electricicty Charges 2% 207
Total Amount - B 10,659
Add Contractor Prophit @ 15% 1,599
Total Cost for 10 Rmt 12,257
Rate for 1 Rmt 1,226
Add Service Tax @ 6% 74
Total Rate for 1 Rmt for Pipe Dia 75mm 1,299
Providing & laying UPVC pressure pipes of 6Kg/Sq.cm pressure rating
class V (IS : 4985-2000) including fittings, tees, bends, clamps, coupling
and adaptors supports, and jointing with solvent joint, testing and &
fittings and thrust blocks at bends as per standard design (For garden
hydrants).

32 mm dia - Rate Analysis for For 10 Rmt. Pipe


Material :
32mm Dia - Pipe Class III (6 Kg) @ 45 % Extra for Class V - 10kg/sqcm. Rmt 10 37 369.00
Add 40% for fittings and wastage etc. on (X) 105.00 30 * X / 100 for Class V L.S 147.60
Misc. Charges @ 3% LS 15
Labour:
Fitter / Welder /Blacksmith 1st Class (For 8 Hours) Day 0.33 426 141
Fitter / Welder/blcksmith 2nd Class (For 8 Hours) Day 0.82 386 317
Beldar Day 0.66 318 210
Total Cost - A 1,200
Water Charges 1% 12
Electricicty Charges 2% 24
Total Amount - B 1,236
Add Contractor Prophit @ 15% 185
Total Cost for 10 Rmt 1,422
Rate for 1 Rmt 142
Add Service Tax @ 6% 9
Total Rate for 1 Rmt for Pipe Dia 32mm 151
40 mm dia - Rate Analysis for For 10 Rmt. Pipe
Material :
40mm Dia - Pipe Class III (6 Kg) @ 70 % Extra for Class V - 10kg/sqcm. Rmt 10 48 476.00
Add 40% for fittings and wastage etc. on (X) 105.00 30 * X / 100 for Class V L.S 190.40
Misc. Charges @ 3% LS 20
Labour:
Water Charges 1% Day 0.33 426 141
Electricicty Charges 2% Day 0.88 386 340
Beldar Day 0.88 318 280
Total Cost - A 1,447
Water Charges 1% 14
Electricicty Charges 2% 29
Total Amount - B 1,491
Add Contractor Prophit @ 15% 224
Total Cost for 10 Rmt 1,714
Rate for 1 Rmt 171
Add Service Tax @ 6% 10
Total Rate for 1 Rmt for Pipe Dia 40mm 182
50 mm dia - Rate Analysis for For 10 Rmt. Pipe
Material :
50mm Dia - Pipe Class III (6 Kg) @ 90 % Extra for Class V - 10kg/sqcm. Rmt 10 80 798.00
Add 40% for fittings and wastage etc. on (X) 105.00 30 * X / 100 for Class V L.S 319.20
Misc. Charges @ 3% LS 34
Labour:
Electricicty Charges 2% Day 0.33 426 141
Total Amount - B Day 0.88 386 340
Beldar Day 0.88 318 280
Total Cost - A 1,912
Water Charges 1% 19
Electricicty Charges 2% 38
Total Amount - B 1,969
Add Contractor Prophit @ 15% 295
Total Cost for 10 Rmt 2,264
Rate for 1 Rmt 226
Add Service Tax @ 6% 14
Total Rate for 1 Rmt for Pipe Dia 50mm 240
63 mm dia - Rate Analysis for For 10 Rmt. Pipe
Material :
63mm Dia - Pipe Class III (6 Kg) @ 70 % Extra for Class V - 10kg/sqcm. Rmt 10 115 1,150.00
Add 40% for fittings and wastage etc. on (X) 105.00 30 * X / 100 for Class V L.S 460.00
Misc. Charges @ 3% LS 48
Labour:
Fitter / Welder/blcksmith 2nd Class (For 8 Hours) Day 0.33 426 141
Beldar / Bhisti / Labour (For 8 Hours) Day 0.88 386 340
Beldar Day 0.88 318 280
Total Cost - A 2,419
Water Charges 1% 24
Electricicty Charges 2% 48
Total Amount - B 2,492
Add Contractor Prophit @ 15% 374
Total Cost for 10 Rmt 2,866
Rate for 1 Rmt 287
Add Service Tax @ 6% 17
Total Rate for 1 Rmt for Pipe Dia 63mm 304
75 mm dia - Rate Analysis for For 10 Rmt. Pipe
Material :
75mm Dia - Pipe Class III (6 Kg) @ 25 % Extra for Class V - 10kg/sqcm. Rmt 10 191 1,913.00
Add 40% for fittings and wastage etc. on (X) 105.00 30 * X / 100 for Class V L.S 765.20
Misc. Charges @ 3% LS 80
Labour:
Carriage of Spun iron S & S pipes 100 mm dia Day 0.33 426 141
Misc. Charges @ 1% Day 0.88 386 340
Beldar Day 0.88 318 280
Total Cost - A 3,520
Water Charges 1% 35
Electricicty Charges 2% 70
Total Amount - B 3,625
Add Contractor Prophit @ 15% 544
Total Cost for 10 Rmt 4,169
Rate for 1 Rmt 417
Add Service Tax @ 6% 25
Total Rate for 1 Rmt for Pipe Dia 75mm 442

SUB HAED - Garden Hydrant System (Irrigation System)


Description of Item Unit Quantity Rate Amount
Providing, laying, jointing and testing, GI medium class pipes
conforming to IS:1239, with all fittings couplings, adapters including
3 two or more Coats of synthetic enamel paint over a coat of primer
complete in all respect .
Cost of 10 M
Material
G.I. pipes :25 mm dia metre 11.50 110.00 1265.00(A) Weight for carriage = pipe
weight + 15% for fiitings = 11.5 Rmt including carriage Rmt 11.5 115 1,323
White lead, hemp, oil etc. LS 10 2 20
Cement, sand and grit etc. if Any LS 5 2 10
Two or more Coats of Enamel Paint & primer @ Area 1.1 sqm Rmt 11.5 13 144
Misc. Charges @ 3% LS 41
Labour:
Fitter / Welder /Blacksmith 1st Class (For 8 Hours) Day 0.33 426 141
Fitter / Welder/blcksmith 2nd Class (For 8 Hours) Day 0.98 386 378
Beldar / Bhisti / Labour (For 8 Hours) Day 0.66 318 210
Total Cost - A 2,267
Water Charges 1% 23
Electricicty Charges 2% 45
Total Amount - B 2,335
Add Contractor Prophit @ 15% 350
Total Cost for 10 Rmt 2,685
Rate for 1 Rmt 268
Add Service Tax @ 6% 16
25mm Dia - GI Medium Duty Pipe Class B - Total Rate for 1 Rmt 285
GYPSUM BOARD CEILING CALCULATOR Area Sqft 550

Coefficients / Materials
Description of Materials
Per Sqft
Unit Qty Piece

10 mm Thick Gypsum Board (6 x 4 Feet) 1.05 Sqft 577.5 25

Galvanised Steel Intermediate Channel (Size 0.086 Rft 47 4


15x45x15x0.90 mm) @ L - 3600mm

Galvanised Steel Celling Section (size 80x26x0.50 mm) 0.175 Rft 96 9


@ L - 3600mm

Galvanised Steel Perimetre Channel (Size 0.103 Rft 57 5


20x27x30x0.50 mm) @ L - 3600mm

Galvanised Steel Angle hanger (Celling angle) (Size 0.041 Rft 23 2


25x10x0.50 mm) @ L -3600mm

Soffit Cleat Box - 50 Pcs 0.074 Nos 41 1

Rawl Plug Box - 100 Pcs 0.074 Nos 41 1

Metal to Metal Screw Box - 500 Pcs 0.31 Nos 170 1

Drywall Screw Box - 1000 Pcs 1.43 Nos 786 1

Connecting Clips - 100 Pcs 0.15 Nos 85 1

Fibre Glass Jointing Tape Roll - 90 Metre 0.17 Rft 94 2

Joint Filling Compound Bag 25 Kg 0.052 Kg 29 2

Primer 20 Litre Bucket 0.010 Kg 6 1


GYPSUM BOARD CEILING CALCULATOR Area Sqf 550

Coefficients / Materials
Description of Materials
Per Sqft
Unit Qty Piece

12.5mm Thk Gypsum Board (6 x 4 Feet) 1.06 Sqft 583 25

Galvanised Steel Intermediate Channel (Size 0.086 Rft 47 4


15x45x15x0.90 mm) @ L - 3600mm

Galvanised Steel Celling Section (size 80x26x0.50 mm) 0.175 Rft 96 9


@ L - 3600mm

Galvanised Steel Perimetre Channel (Size 0.100 Rft 55 5


20x27x30x0.50 mm) @ L - 3600mm

Galvanised Steel Angle hanger (Celling angle) (Size 0.040 Rft 22 2


25x10x0.50 mm) @ L -3600mm

Soffit Cleat Box - 50 Pcs 0.054 Nos 30 1

Rawl Plug Box - 100 Pcs 0.054 Nos 30 1

Metal to Metal Screw Box - 500 Pcs 0.27 Nos 151 1

Drywall Screw Box - 1000 Pcs 1.43 Nos 786 1

Connecting Clips - 100 Pcs 0.15 Nos 85 1

Fibre Glass Jointing Tape Roll - 90 Metre 0.17 Rft 94 2

Joint Filling Compound Bag 25 Kg 0.054 Kg 30 2

Primer 20 Litre Bucket 0.010 Kg 6 1


RATE ANALYSIS FOR GYPSUM BOARD CEILING WORKS
Materials Price Per Piece
12.5mm Thk Gypsum Board (6 Feet x 4 Feet = 24 Sqft) 450 Sqft 18.75
Galvanised Steel Intermediate Channel (Size 15x45x15x0.90 mm) @ L - 3600mm 170 Rft 14
Galvanised Steel Celling Section (size 80x26x0.50 mm) @ L - 3600mm 125 Rft 10
Galvanised Steel Perimetre Channel (Size 20x27x30x0.50 mm) @ L - 3600mm 150 Rft 13
Galvanised Steel Angle hanger (Celling angle) (Size 25x10x0.50 mm) @ L -3600mm 150 Rft 13

Soffit Cleat Box - 50 Pcs 100 Each 2


Rawl Plug Box - 100 Pcs 900 Each 9
Metal to Metal Screw Box - 500 Pcs 500 Each 1.0
Drywall Screw Box - 1000 Pcs 500 Each 0.5
Connecting Clips - 100 Pcs 500 Each 5.0
Fibre Glass Jointing Tape Roll - 90 Metre 500 Rmt 5.6
Joint Filling Compound Bag 25 Kg 500 Kg 20.0
Primer 20 Litre Bucket 500 Litre 25

Gypsum Board Ceiling Works Unit Qty Rate Amount

Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and
galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with
flanges of 27 mm and 37 mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50 mm long with 6 mm dia bolts,
other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed
with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge
of 80 mm with tapered flanges of 26 mm each having clips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I.
intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm
thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre,
with 25 mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall
screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended
jointing compound , jointing tapes , finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer
suitable for board, all as per manufacturer’s specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made
with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of
painting with :

12.5 mm thick tapered edge gypsum plain board conforming to IS: 2095- Part I

Details of Cost for Room 3.600 x 4.500 Metre =16.2 Sqm (175 Sqft) 294
Materials :
12.5mm Thick Gypsum Board (Make - GYPROC / BORAL) Sqft 294.00 18.8 5,513 2.16 7.5
Wastage @ 5% Sqft 14.7 18.8 276 8 Board
Intermediate Channel (Size 15x45x15x0.90 mm) @ L - 3600mm Rft 44 14 627
Celling Section (size 80x26x0.50 mm) @ L - 3600mm Rft 83 10 861
Galvanised Steel Perimetre Channel (Size 20x27x30x0.50 mm) @ L - 3600mm Rft 53.14 13 664
Galvanised Steel Angle hanger (Celling angle) (Size 25x10x0.50 mm) @ L -3600mm Rft 24 13 295
Soffit Cleat Each 12 2 24
Rawl Plugs Each 12 9 108
Metal to Metal Screws Each 24 1 24
Drywall Gyp Board Screw (Per Board 25-30 Nos) Each 240 0.5 120 16.2 2.16
Connecting Clips Each 30 5.0 150 7.5
Joint Filling Compound (200 gm Sqm) Kg 3.2 20.0 65
Joint Finisher Surface 2 Coats @ 10-12 Sqft / Kg Kg 17.5 22.5 394
Jointing Tape Roll Each 1.0 500 500
Dry Board Primer coverage 2 coats @ 90-100 Sqft Litre 2.0 25 50
Misc, Tools & Scaffolding @ 5% 484
10,154 58.0233
Labour 22
Labour Rate for Gypsum Ceiling Works including Putty & Primer Sqft 294 30 8,820 80.0233
Total Cost - A 18,974
Water & Electricity Charges 2% 2% 379
Total Amount - B 19,354
Add Contractor Profit @ 15% 15.00% 2,903
Rate for 175 Sqft 294 22,257
Per Sqft Price 75.7 64.347292
Per Sqft Price 814.9
RATE ANALYSIS FOR GYPSUM BOARD CEILING WORKS
Materials Price Rate Per Piece
10 Thk Gypsum Board (6 Feet x 4 Feet = 24 Sqft) 450 Sqft 18.75
10mm Thk Gypsum Board (6 Feet x 4 Feet = 24 Sqft) 450 Sqft 38
Galvanised Steel Celling Section (size 80x26x0.50 mm) @ L - 3600mm 248 Rft 21
Galvanised Steel Perimetre Channel (Size 20x27x30x0.50 mm) @ L - 3600mm 165 Rft 14
Galvanised Steel Angle hanger (Celling angle) (Size 25x10x0.50 mm) @ L -3600mm 97 Rft 8

Soffit Cleat Box - 50 Pcs 295 Each 6


Rawl Plug Box - 100 Pcs 972 Each 10
Metal to Metal Screw Box - 500 Pcs 649 Each 1.3
Drywall Screw Box - 1000 Pcs 531 Each 0.5
Connecting Clips - 100 Pcs 590 Each 5.9
Fibre Glass Jointing Tape Roll - 90 Metre 170 Rmt 1.9
Joint Filling Compound Bag 25 Kg 673 Kg 26.9
Primer 20 Litre Bucket 2,150 Litre 108

Gypsum Board Ceiling Works Unit Qty Rate Amount

12.5 mm thick tapered edge gypsum plain board conforming to IS: 2095- Part I
Details of Cost for Shoping complex=1800 Sqft) 2,400
Materials :
10 mm Thick Gypsum Board (Make - GYPROC / BORAL) Sqft 2400.00 18.8 45,000 2.16 7.5
Wastage @ 5% Sqft 120.0 18.8 2,250 8 Board
Intermediate Channel (Size 15x45x15x0.90 mm) @ L - 3600mm Rft 156 38 5,850
Celling Section (size 80x26x0.50 mm) @ L - 3600mm Rft 324 21 6,691
Galvanised Steel Perimetre Channel (Size 20x27x30x0.50 mm) @ L - 3600mm Rft 180.00 14 2,478
Galvanised Steel Angle hanger (Celling angle) (Size 25x10x0.50 mm) @ L -3600mm Rft 72 8 581

Soffit Cleat Each 98 6 578 2007


Rawl Plugs Each 98 10 953
Metal to Metal Screws Each 500 1 649
Drywall Gyp Board Screw (Per Board 25-30 Nos) Each 2571 0.5 1,365 16.2 2.16
Connecting Clips Each 278 5.9 1,640 7.5
Joint Filling Compound (200 gm Sqm) Kg 100.0 26.9 2,690
Joint Finisher Surface 2 Coats @ 10-12 Sqft / Kg Kg 200.0 22.5 4,500
Jointing Tape Roll Each 4.0 170 680
Dry Board Primer coverage 2 coats @ 90-100 Sqft Litre 20.0 108 2,150
Misc, Tools & Scaffolding @ 5% 1,545
79,601 454.8617
Labour 22
Labour Rate for Gypsum Ceiling Works including Putty & Primer Sqft 2400 20 48,000 476.8617
Total Cost - A 127,601
Total Amount - B 127,601
Add Contractor Profit @ 15% 15.00% 19,140
Rate for 1800 Sqft 2,400 146,741
Per Sqft Price 61.1 51.97074
Per Sqmt Price 658.1

rrrrrrrrr
Description of Item Unit Nos L B H Total
All Round PCC as per Fig. No. 19.11
Dia of Pipe -400mm - Thickness -32mm
Bottom Bed Cum 1 1 0.764 0.15 0.115
Around Above of Pipe R - 540mm Cum 0.5 3.14 0.2916 1 0.458
Less Volumne of Pipe Cum -1 3.14 0.054 1 -0.169
Total Qty of PCC for 1 M 0.403
1 Cum Consumption Length of Pipe 2.479
Circular Manhole Dia 910mm at Bottom &
560mm Dia at top.
Foundation Concrete 225mm Offset & Thickness Cum 1 3.14 0.828 0.225 0.585
FormWork Cum 1 6.28 0.910 0.225 1.286
Brick Work (1:4) (Avarage Dia = 0.85mm) Cum 6.28 0.425 0.23 0.91 0.559
Internal Plaster 12mm (1:3) Sqm 6.28 0.3675 0.91 2.100 1.7
Neat Cement Punning / Floating Coat of Cement Sqm 6.28 0.3675 0.91 2.100 0.85
Cement Concrete 1:2:4 for Drain Channel Cum 6.28 0.425 0.23 0.91 0.559

Circular Manhole Dia 910mm at Bottom &


560mm Dia at top. Quantity as Per DAR for Manhole upto 910mm Deep
Foundation Concrete 225mm Offset & Thickness Cum 1 3.14 0.828 0.225 0.585
FormWork Sqm 1 6.28 0.910 0.3 1.714
Brick Work (1:4) (Avarage Dia = 0.85mm) Cum 6.28 0.425 0.23 0.91 0.559
Internal Plaster 12mm (1:3) Sqm 6.28 0.3675 0.91 2.100
Neat
CementCement Punning
Concrete 1:2:4/ Floating
for DrainCoat of Cement
Channel & Cover Sqm 6.28 0.3675 0.91 2.100
fixing Cum 6.28 0.425 0.23 0.91 0.559
Form work for Manhole Frame Fixing Concrete Cum 1 6.28 0.598 0.1 0.375
Manhole Cover HD -20 Nos 1 1.000

All Round PCC as per Fig. No. 19.11


Dia of Pipe -100mm - Thickness -10mm
Bottom Bed Cum 1 1 0.27 0.15 0.041
Around Above of Pipe R - 135mm Cum 0.5 3.14 0.018225 1 0.029
Less Volumne of Pipe Cum -1 3.14 0.004 1 -0.013
Total Qty of PCC for 1 M 0.056
1 Cum Consumption Length of Pipe 17.906

Dia of Pipe -150mm - Thickness -10mm


Bottom Bed Cum 1 1 0.32 0.15 0.048
Around Above of Pipe R - 165mm Cum 0.5 3.14 0.027225 1 0.043
Less Volumne of Pipe Cum -1 3.14 0.007 1 -0.023
Total Qty of PCC for 1 M 0.068
1 Cum Consumption Length of Pipe 14.694

Dia of Pipe -300mm - Thickness -30mm


Bottom Bed Cum 1 1 0.66 0.15 0.099
Around Above of Pipe R - 330mm Cum 0.5 3.14 0.1089 1 0.171 0.66
Less Volumne of Pipe Cum -1 3.14 0.032 1 -0.102
Total Qty of PCC for 1 M 0.168
1 Cum Consumption Length of Pipe 5.944

Dia of Pipe -250mm - Thickness -25mm


Bottom Bed Cum 1 1 0.6 0.15 0.090
Around Above of Pipe R - 60mm Cum 0.5 3.14 0.075625 1 0.119 0.55
Less Volumne of Pipe Cum -1 3.14 0.023 1 -0.071
Total Qty of PCC for 1 M 0.138
1 Cum Consumption Length of Pipe 7.242

Dia of Pipe -160mm - Thickness -10mm


Bottom Bed Cum 1 1 0.33 0.15 0.050
Around Above of Pipe R - 165mm Cum 0.5 3.14 0.027225 1 0.043 0.33
Less Volumne of Pipe Cum -1 3.14 0.008 1 -0.025
Total Qty of PCC for 1 M 0.067
1 Cum Consumption Length of Pipe 14.968

Dia of Pipe -200mm - Thickness -10mm


Bottom Bed Cum 1 1 0.37 0.15 0.056
Around Above of Pipe R - 165mm Cum 0.5 3.14 0.034225 1 0.054 0.37
Less Volumne of Pipe Cum -1 3.14 0.010 1 -0.031
Total Qty of PCC for 1 M 0.078
1 Cum Consumption Length of Pipe 12.848
1.47
0.735

1.47
0.735
1.195
RATE ANALYSIS FOR EXTERNAL SERVICES WORKS
Description of Item Unit Quantity Rate Amount

Cement Mortar 1: 1 (1 cement : 1 Fine sand)

Cost For 1 Cum


Material :
Cements OPC 43 Grade Bag 20.4 280 5,712
Carriage of Cement Bag Bag 1.02 92 94
Fine Sand Cum 0.7125 800 570
Carriage of Fine sand Cum 0.7125 103 73
Misc. Charges @ 3% LS 193
Labour:
Beldar Day 0.75 318 239
Bhisti Day 0.07 318 22
Total Cost - A 6,903
Water Charges 1% 69
Electricicty Charges 2% -
Total Amount - B 6,973
Add Contractor Prophit @ 15% 1,046
Total Cost for 1 Cum 8,018
Rate for 1Cum 8,018
Add Service Tax @ 6% 481
Cement Mortar (1 Cement :1 Fine Sand) - Total Rate for 1 Cum 8,499

Cement Mortar 1: 2 (1 cement : 2 Fine sand)

Cost For 1 Cum


Material :
Cements OPC 43 Grade Bag 13.6 280 3,808
Carriage of Cement Bag Bag 0.68 92 63
Fine Sand Cum 0.95 800 760
Carriage of Fine sand Cum 0.95 103 98
Misc. Charges @ 3% LS 142
Labour:
Beldar Day 0.75 318 239
Bhisti Day 0.07 318 22
Total Cost - A 5,132
Water Charges 1% 51
Electricicty Charges 2% -
Total Amount - B 5,183
Add Contractor Prophit @ 15% 777
Total Cost for 1 Cum 5,961
Rate for 1Cum 5,961
Add Service Tax @ 6% 358
Cement Mortar (1 Cement :2 Fine Sand) - Total Rate for 1 Cum 6,318

Cement Mortar 1: 3 (1 cement : 3 Fine sand)

Cost For 1 Cum


Material :
Cements OPC 43 Grade Bag 10.2 280 2,856
Carriage of Cement Bag Bag 0.51 92 47
Fine Sand Cum 1.07 318 341
Carriage of Fine sand Cum 1.07 103 110
Misc. Charges @ 3% LS 101
Labour:
Beldar Day 0.75 318 239
Bhisti Day 0.07 318 22
Total Cost - A 3,716
Water Charges 1% 37
Electricicty Charges 2% -
Total Amount - B 3,753
Add Contractor Prophit @ 15% 563
Total Cost for 1 Cum 4,316
Rate for 1Cum 4,316
Add Service Tax @ 6% 259
Cement Mortar (1 Cement :3 Fine Sand) - Total Rate for 1 Cum 4,575

Cement Mortar 1: 4 (1 cement : 4 Fine sand)

Cost For 1 Cum


Material :
Cements OPC 43 Grade Bag 7.6 350 2,660
Carriage of Cement Bag Bag 0.38 92 35
Fine Sand Cum 1.07 1,270 1,359
Carriage of Fine sand Cum 1.07 103 110
Misc. Charges @ 3% LS 125
Labour:
Beldar Day 0.75 900 675
Bhisti Day 0.07 900 63
Total Cost - A 5,027
Water Charges 1% 50
Electricicty Charges 2% -
Total Amount - B 5,077
Add Contractor Prophit @ 15% 762
Total Cost for 1 Cum 5,839
Rate for 1Cum 5,839
Add Service Tax @ 6% 350
Cement Mortar (1 Cement :4 Fine Sand) - Total Rate for 1 Cum 6,189

Cement Mortar 1: 5 (1 cement : 5 Fine sand)

Cost For 1 Cum


Material :
Cements OPC 43 Grade Bag 6.2 350 2,170
Carriage of Cement Bag Bag 0.31 92 29
Fine Sand Cum 1.07 800 856
Carriage of Fine sand Cum 1.07 103 110
Misc. Charges @ 3% LS 95
Labour:
Beldar Day 0.75 1,000 750
Bhisti Day 0.07 1,000 70
Total Cost - A 4,080
Water Charges 1% 41
Electricicty Charges 2% -
Total Amount - B 4,121
Add Contractor Prophit @ 15% 618
Total Cost for 1 Cum 4,739
Rate for 1Cum 4,739
Add Service Tax @ 6% 284
Cement Mortar (1 Cement :5 Fine Sand) - Total Rate for 1 Cum 5,023

Cement Mortar 1: 4 (1 cement : 3 Coarse sand : 1 Fine Sand)

Cost For 1 Cum


Material :
Cements OPC 43 Grade Bag 7.60 320 2,432
Carriage of Cement Bag Bag 0.38 94.7 36
Coarse Sand @ 42/- Cft Cum 0.71 1,483 1,057
Fine Sand @ 24/ Cft Cum 0.36 847 302
Carriage of Coarse sand Cum 1.07 103 110
Mixer / Misc. Charges @ 3% LS 118
Labour:
Beldar Day 0.75 400 300
Bhisti Day 0.07 400 28
Total Cost - A 4,090

RATE ANALYSIS FOR TILE FLOORING


TILE FLOORING

Providing and laying Ceramic glazed floor tiles of size 300x300 mm


(thickness to be specified by the manufacturer), of 1st quality
conforming to IS : 15622, of approved make, in colours such as
White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement
mortar 1:4 (1 Cement : 3 Coarse sand : 1 Fine Sand), including
pointing the joints with white cement and matching pigment etc.,
complete as per drawings & specification. (Basic Rate @ 40/- Sqft)

Cost For 10 Sqm


Material :
Glazed Ceramic floor tiles 300x300 mm size Sqm 10 431 4,306
Wastage as per CPWD @ 2.5% Sqm 0.25 431 108
Bed Mortar - Cement mortar 1:4 (1 cement : 3 coarse sand : 1 Fine Sand)
Cement Mortar Cum 0.24 4,090 982

Cement for slurry over bed @ 3.3 kg per sqm Bag 0.66 320 211
Cement Mortar for Pointing With White Cement LS 0.25 900 225
Misc., Nails, Drum, Sundries including carriage of cement Charges @ 3% LS 175
Labour:
Mason for Tile Work Day 2.0 550 1,100
Mason for Mortar Day 1.000 550 550
Beldar / Coolie for Tile Work Day 2.0 400 800
Beldar / Coolie for Mortar Day 1.000 400
Total Cost - A 8,457
Water & Electricity Charges 2% 169
Total Amount - B 8,626
Add Contractor Profit & Overheads @ 15% 1,294
Total Cost for 10 Sqm 9,920
Rate for 10 Sqm 9,920
Total Rate for 1 Sqm 992
plus Taxes as applicable
Description of Item & Unit Price
Diesel Cost Litre Litre 65
Mobil Oil Litre Litre 350
Hiring Charges of Transit Mixer Per Day 7,000 Say

COST OF TRIPS
1 2 3 4 5 6 7 8 9

Litres of
Litres of Mobil
Nos of Trips Nos of KM Diesel (Incl. Diesel
Lead in KM Average Cost of Diesel Oil Consumed Cost of Mobil
N=8/(2L/S) Done in One Consumed in Driver &
- (L) Speed (S) per Litre per @ 140 Km Oil
+1 Day (2NL+6) One Day @ 4 Helper)
Litre
Km Litre

0.5 15 7.50 13.50 3.375 219.38 0.096 33.75


0.75 18 7.38 17.08 4.269 277.50 0.122 42.69
1 22 7.33 20.67 5.167 335.83 0.148 51.67
1.5 25 7.14 27.43 6.857 445.71 0.196 68.57
2 30 7.06 34.24 8.559 556.32 0.245 85.59

CARRIAGE OF CONCRETE FROM PLANT TO SITE


1 2 3 4 6 7 8 9

Capacity Considered Cost per Trip per unit i/c 15% CP & OH
MATERIAL Unit of Rates
Per Trip Quantity

0.5 Km .75 Km 1 Km 1.5 2


Concrete 7.5 6 Cum 5.63 7.23 8.81 12.00 15.16
Contractor Profit & Over Heads @ 15%
Total Price Per Cubic Metre 5.63 7.23 8.81 12.00 15.16
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Net Cost Err:509 Err:509 Err:509 Err:509 Err:509
TM - Cost Err:509
Driver Err:509
Helper Err:509
10% Err:509

Saving Err:509

COST OF TRIPS
1 2 3 4 5 6 7 8 9

Litres of
Litres of Mobil
Nos of Trips Nos of KM Diesel (Incl. Diesel
Lead in KM Average Cost of Diesel Oil Consumed Cost of Mobil
N=8/(2L/S) Done in One Consumed in Driver &
- (L) Speed (S) per Litre per @ 140 Km Oil
+1 Day (2NL+6) One Day @ 5 Helper)
Litre
Km Litre

0.5 15 7.50 13.50 2.700 175.50 0.096 33.75


0.75 18 7.38 17.08 3.415 222.00 0.122 42.69
1 22 7.33 20.67 4.133 268.67 0.148 51.67
1.5 25 7.14 27.43 5.486 356.57 0.196 68.57
2 30 7.06 34.24 6.847 445.06 0.245 85.59

CARRIAGE OF CONCRETE FROM PLANT TO SITE


1 2 3 4 6 7 8 9

Capacity Considered Cost per Trip per unit i/c 15% CP & OH
MATERIAL Unit of Rates
Per Trip Quantity

0.5 Km .75 Km 1 Km 1.5 2


Concrete 7.5 6 Cum 4.65 5.97 7.28 9.92 12.53
Contractor Profit & Over Heads @ 15%
Total Price Per Cubic Metre 4.65 5.97 7.28 9.92 12.53

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


210,000 Per Month

10 11 12 13 14

Increase Average cost


Hiring Cost Per
of Cost per per additional
Charges of Total Cost Trip
Km over KM after 1st -
Transit 6+8+9+10 Col. 11 /
previous 5Km, 10Km,
Mixer Col. 3
KM 20 Km

253 34
320 43
388 53
514 72
642 91
10 11 12 13 14

Increase Average cost


Hiring Cost Per
of Cost per per additional
Charges of Total Cost Trip
Km over KM after 1st -
Transit 6+8+9+10 Col. 11 /
previous 5Km, 10Km,
Mixer Col. 3
KM 20 Km

209 28
265 36
320 44
425 60
531 75
SOFFIT CLIPS, RAWL PLUG & HANGER ANGLE @ 1200mm Intermediate Channel (Size 15x45x1
12 x .600 7.2 Metre Length

7.2

3.6
Metre

4.5 Meter
Galvanised Steel Celling Section (size 80
Perimetre Channel (Size 20x27x30x0.50 mm) @ L - 3600mm
Length 3.6 4.5 3.6 4.5 16.2 Rmt
7 Nos x 3.6 Metre
ate Channel (Size 15x45x15x0.90 mm) @ L - 3600mm
4.5 x 3 13.5 Rmt

eel Celling Section (size 80x26x0.50 mm) @ L - 3600mm


os x 3.6 Metre 25.2 Rmt
7 Nos
SOFFIT CLIPS, RAWL PLUG & HANGER ANGLE @ 1200mm Intermediate Channel (Size 15x45x1
12 x .600 7.2 Metre Length

7.2

3.6
Metre

4.5 Meter
Galvanised Steel Celling Section (size 80
Perimetre Channel (Size 20x27x30x0.50 mm) @ L - 3600mm
Length 3.6 4.5 3.6 4.5 16.2 Rmt
7 Nos x 3.6 Metre
ate Channel (Size 15x45x15x0.90 mm) @ L - 3600mm
4.5 x 3 13.5 Rmt

eel Celling Section (size 80x26x0.50 mm) @ L - 3600mm


os x 3.6 Metre 25.2 Rmt
7 Nos