0% found this document useful (0 votes)
19 views18 pages

Cppreport

capstone project report in computer eng

Uploaded by

rutpatil0347
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views18 pages

Cppreport

capstone project report in computer eng

Uploaded by

rutpatil0347
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

GOVERNMENT POLYTECHNIC, MIRAJ

Department of Computer Engineering


Academic Year 2024-25

PROJECT DIARY

Project Title: Answer Highliter

Name of Guide:

Class: TYCO (CO5I)

Group No:
GOVERNMENT RESIDENCE WOMEN
POLYTECHNIC, TASGAON
PROJECT DETAILS

Department of Computer Engineering

Project Title: Answer Highliter

Sponsored: (YES / NO) - NO

Name of shop –

Owner / Authorized person name –

Authorized person contact No –

Address –

Sr. No Student Name Roll No. Mobile No. Sign


1 Abhishek Vitthal Adake 2303 9511819931

2 Pratik Dayanand Bugade 2308 9371746348

3 Shreyash Sunil Patil 2347 9325807962

4 Suyash Shivaji Savant 2361 8766882681

Guide Name: Mr. A. L. Tarange


Week no.:1
Date: 22/07/2024 to 28/07/2024.

Activities Planed:
 Attend the introductory lecture for the Capstone Project.

Activities Executed:
 The lecture covered the overview of the Capstone Project, its
objective and the expectations from students.
 The subjects given for the Capstone Project included AI, Machine
Learning, Web Development, and Game Development, Block-
chain.
Reason For Delay if Any:
No Any Delay

Corrective Measures Adopted:


No corrective measures needed

Remark And Signature of Guide:


Week no.:2
Date: Date: 29/07/2024 to 04/08/2024.

Activities Planed:
 Create Group

Activities Executed:
 Select Group member
 Following Key Criteria To Guide The Selection Of Members For
The Project Group
• Technical skills (e.g. programming Language).
• Soft skills (e.g., communication, leadership).
• Project interests (e.g., AI/ML).

Reason For Delay if Any:


There were no significant delays during the group formation process

Corrective Measures Adopted:

No corrective measures needed

Remark And Signature of Guide:


Week no.:3
Date: 05/08/2024 to 11/08/2024.

Activities Planed:
 Finding various Topic for our Project

Activities Executed:
 all members contributed ideas based on their individual Interest
 Topics included AI based, web development, database management
 Select 4 topic:
• Stationary Shop Management
• AI Based Smart Health Care System
• Io T-Based Smart Agriculture System.
• Answer Highliter.

Reason For Delay if Any:


There were no significant delays during the Topic finding process

Corrective Measures Adopted:


No corrective measures were needed, as the tasks were completed on
schedule

Remark And Signature of Guide:


Week no.:4
Date: 12/08/2024 to 18/08/2024.

Activities Planed:
 Discuss about Topics with Guide

Activities Executed:
 Discussion with Guide about selected Project Topic.
 Note down their suggestions
 Discuss about other activities with guide

Reason For Delay if Any:


No Any Delay

Corrective Measures Adopted:


 We can choose Topics related to AIML
 The topic name is Answer Highliter.

Remark And Signature of Guide:


Week no.:5
Date: 19/08/2024 to 25/08/2024.

Activities Planed:
 Collecting information about AI-based Answer Highlighting.

Activities Executed:
 Researched AI models such as BERT, GPT-3, and T5 used for
answer extraction and highlighting.
 Gathered information on NLP techniques like Named Entity
Recognition (NER) and text summarization.

Reason For Delay if Any:


No significant delays occurred.

Corrective Measures Adopted:


No corrective measures were needed, as the tasks were completed on
schedule

Remark And Signature of Guide:


Week no.:6
Date: 26/08/2024 to 01/09/2024.

Activities Planed:
 Monitor existing AI-based answer extraction systems.

Activities Executed:
 Analyzed popular AI applications used for answer highlighting
like Google's BERT, GPT-3.
 Reviewed case studies on answer extraction systems in educational
platforms and customer support chatbots.
 Evaluated the effectiveness and limitations of these systems in real-
world applications.

Reason For Delay if Any:


No delays occurred this week. All activities were completed as
planned

Corrective Measures Adopted:


No corrective measures were needed, as the tasks were completed on
schedule

Remark And Signature of Guide:


Week no.:7
Date: 02/09/2024 to 08/09/2024.

Activities Planed:
 Identify potential problems in existing answer extraction
systems.

Activities Executed:
 Examined user feedback and reviews of AI-based answer
extraction systems.
 Identified common issues like poor relevance of extracted
answers, text misinterpretation, and slow response times.

Reason For Delay if Any:

No delays in the analysis process. All activities were executed on


schedule

Corrective Measures Adopted:


No corrective actions necessary.
Remark And Signature of Guide:
Week no.:8
Date: 09/09/2024 to 15/09/2024.

Activities Planed:
 Discuss ways to overcome the identified problems.

Activities Executed:
 Finding solutions to overcome problems.
 Discussed implementation feasibility with group members.
 Proposed solutions to enhance user interface

Reason For Delay if Any:

No delays in the analysis process. All activities were executed on


schedule

Corrective Measures Adopted:


No corrective actions necessary.

Remark And Signature of Guide:


Week no.:9
Date: 16/09/2024 to 22/09/2024.

Activities Planed:

 Study of AI libraries.

Activities Executed:

 Researched popular AI libraries like Hugging face.


 Compared features and compatibility of different AI libraries.
 Documented which libraries might be suitable for the project.

Reason For Delay if Any:


 No delays were encountered.

Corrective Measures Adopted:


 No corrective measures needed.

Remark And Signature of Guide:


Week no.:10
Date: 23/09/2024 to 29/09/2024.

Activities Planed:
 Analyzing the hardware and software resources required for the
project.

Activities Executed:
 Understanding about Hardware & Software resources
 Hardware Requirements: devices needed for running AI
Libraries.
 Software Requirements: Analyzed tools required for training
AI models, such as PyTorch, and NLP libraries like Hugging
Face's Transformers for answer extraction.

Reason For Delay if Any:

No delays in the analysis process. All activities were executed on


schedule

Corrective Measures Adopted:


Focused on Resource Planning

Remark And Signature of Guide:


Week no.:11
Date: 30/09/2024 to 06/10/2024.

Activities Planed:
 Understand customer requirements by conducting surveys
and interviews.

Activities Executed:
 Conducted user research by visiting relevant education
platforms and chatbot applications to observe the need for
accurate answer extraction.
 Gathered feedback through interviews with customers and
users to understand pain points in current systems (e.g.,
response accuracy, context understanding).

Reason For Delay if Any:

No delays were encountered.

Corrective Measures Adopted:

No corrective actions needed.

Remark And Signature of Guide:


Week no.:12
Date: 07/10/2024 to 13/10/2024.

Activities Planed:
 Draw an Entity-Relationship (ER) diagram.

Activities Executed:
 Designed an ER diagram to model data entities involved in
the answer highlighting system (e.g., questions, answers,
users, and feedback).
 Mapped the relationships between entities to ensure data
integrity and efficiency in retrieval.

Reason For Delay if Any:

No delays were encountered.

Corrective Measures Adopted:

No corrective actions needed.

Remark And Signature of Guide:


Week no.:13
Date: 14/10/2024 to 20/10/2024.

Activities Planed:
 Design the database schema.

Activities Executed:
 Drafted the schema for database tables, including
attributes for questions, answers, users, and user
interaction data.
 Ensured the schema covered the necessary relationships for
efficient data retrieval and storage.

Reason For Delay if Any:

No delays were reported.

Corrective Measures Adopted:

No corrective measures required.

Remark And Signature of Guide:


Week no.:14
Date: 21/10/2024 to 27/10/2024.

Activities Planed:
 Draw a Data Flow Diagram (DFD).

Activities Executed:
 Created a DFD to map out the flow of data within the
system, including processes like answer extraction,
answer ranking, and user feedback collection.
 Incorporated feedback from team members to ensure all
system processes and interactions were clearly visualized.

Reason For Delay if Any:

No significant delays occurred.

Corrective Measures Adopted:

No corrective actions necessary.

Remark And Signature of Guide:


Week no.:15
Date: 28/10/2024 to 03/11/2024.

Activities Planed:
 Draw a UML diagram.

Activities Executed:
 Developed UML diagrams to represent system
interactions, including use cases for answer extraction and
highlighting and class diagrams for data management.
 Reviewed the diagrams for any inconsistencies or missing
components.

Reason For Delay if Any:

No delays were encountered.

Corrective Measures Adopted:

No corrective measures needed.

Remark And Signature of Guide:


Week no.:16
Date: 04/10/2024 to 10/11/2024.

Activities Planed:
 Document the entire process.

Activities Executed:
 Completed all project document including report, weekly
diary and portfolio.
 Prepared the document for submission.

Reason For Delay if Any:

No significant delays occurred.

Corrective Measures Adopted:

No corrective actions necessary.

Remark And Signature of Guide: