5KW On Grid - MR - Gowtham
5KW On Grid - MR - Gowtham
FOR
District TRICHY
Solar Photovoltaic (PV) modules convert solar radiation from the sun into electrical
energy in the form of direct current (DC). The power generated from the PV Modules is
supplied to the load through solar inverter unit (part of Grid Tied Inverter), which
converts DC power to pure 240V AC sine wave power. The inverter unit powers the
dedicated loads from the solar array.
MPPT Charger powers the DC bus from the PV array. A microprocessor control circuit
automatically adjusts the DC-DC converter to ensure that it always matches the PV
array under varying conditions and transfers the maximum possible power.
The Inverter is programmed for solar priority mode of operation. If solar power is
available it is directed to the battery charging and the excess power to load. The Solar
Power is not available in that case direct load from battery ,when battery reached 30%
automatically load from grid and battery not charging from the grid so we can use 100%
solar from this system .
S. No Parameters Specifications
2. Make RENEWSYS
The module mounting structure is designed for holding suitable number of modules in
series. The frames and leg assemblies of the Module Mounting structure are
manufactured using standard Mild Steel sections of angle, channel, tubes and any other
sections conforming to IS: 2062. These structures are hot dip galvanized for the long life
in external weather conditions. All fasteners used for the structure assembly is of very
good quality Stainless Steel (SS304). The Module mounting structure is designed in
such a way that it will occupy minimum space without sacrificing the output from solar
modules at the same time it will withstand severe wind speed up to maximum 150
KMPH (horizontal wind speed).
S. No Parameters Specifications
1 Type GI structure
4 Fasteners SS 304
S. No Parameters Specifications
Trackers
OUTPUT(AC)
(User suitable)
EFFICIENCY
PROTECTION
Protection
Protection
CABLE TECHNICAL SPECIFICATIONS
Sizes of cables between array interconnections, array to junction boxes, junction boxes
to Inverter etc. shall be so selected to keep the voltage drop (power loss) of the entire
power plant to the minimum.
The bright annealed 99.97% pure bare copper conductors that offer low conductor
resistance are used in the power Plant. They result in lower heating of the cable thereby
increase in life of the cable and also reduction in Power Losses in the system. These
cables are insulated with a special grade PVC compound formulated for outdoor use.
The skin coloration offers high insulation resistance and long life. Cables are flexible
and are used with annealed electrolytic grade copper conductors. They are suitable for
outdoor and for 1000VDC application.
3 Material Copper
Measurement
2 GI Structure 1 Set
The cost of the power plant is calculated and estimated on the basis of the present day
market price, availability of different equipment’s, place of installation where the said
project will be implemented. During cost estimation, maximum care is taken to preserve
the quality and reliability of the system while keeping in mind that the price should be
extremely competitive. The maintenance contract has been separated from the main
project cost and shall be finalized during project execution period, before handing over
of the system to the owner.
S. No Description Amount
2. GST(12)% Rs.25,200.00
2. Payment Terms:
50% advance payment against your valuable PO, Remaining 40% payment against delivery of
Materials at your site & 10% against complete installation and commissioning.
3. Supply, Delivery & Installation: 2 Weeks from the date of receipt of your firm & technically
clear Purchase Order
4. Warranty: 5 Years Product Warranty and 20 Years Performance Warranty for Solar Panels,
10 years for Inverter.
5. Validity: 15 days from the date of offer.
6. Scope of Customer: Water, Electricity and space for installation, construction of control
room.
7. Installation time:
< 10 KW : 7 Days
< 20 KW : 12 Days
< 50 KW : 20 Days
< 100 KW : 45 Days
8. Limited Liability: Our liability is limited to the scope of manufacture and keeps it ready for
dispatch, Installation & Commissioning.
9. Force majeure clause: This offer and resulting contract are subject to standard force
majeure clause.
In case of any further Information/Clarification, please feel free to contact us.