> Objective:
• Streamline workflow processes to reduce material handling and
transportation time.
Minimize movement of both materials and workers, thereby
increasing productivity.
Provide sufficient room for future expansion or addition of new
equipment.
> Introduction:
• In a manufacturing organization, a job to be manufactured
spends most ofthe time in movingand waiting.
For reduction of this moving and waiting time ofjobs/parts, it
is necessary to have proper layout and proper scheduling
procedure.
Plant layout specifies the position of the overall arrangement
of the various facilities such as equipment's, material,
manpower, materials handling, service and passage
facilities,
13/11/2024 12:47 pm
congestion points
Plant layout and shop layouts must be flexible to facilitate
changes in productionrequirements
13/11/2024 12:47pm
3) Line layout:
Product Layout
3) Combination Layout:
A combination layout, also known as a hybrid layout, integrates
elements of both process and product (line) layouts to optimize
R-OXN G-00Y
002 L002
RFogng
HTHeat hemmor Hobbing mechine
Iutron funo GF Gearinathrng mochle
13/11/202412:48 pm
(3)
Stores and Tooling Sheet Metal
Iypical Section Section
Smithy Section FG
Layout
with
WALK -VWAY
illustrati
ons
Conventional
CNC Machines Welding Section PPE
Machines