0% found this document useful (0 votes)
15 views18 pages

CAPS Solution

Uploaded by

rekharanpurohit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views18 pages

CAPS Solution

Uploaded by

rekharanpurohit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Goal Seak Method General Form

x^2+2x-20=0
x 3.5826523 First Law Of Thermodynamics
a 1 Q-W=U 20000
b 2 W 5200
c 20 Q 25200
x^2+2x-20 0.0007019
Of Thermodynamics
Experiment No 01: Minimum Utility Target and Pinch Point using Temperature Interval Method

Stream Tin (oC) Tout (oC) mCp


C1 120 235 2
C2 180 240 4
H1 260 160 3
H2 250 130 1.5

∆Tmin 10

Reconstruct Table by adding ∆Tmin in Cold Stream


Stream Tin (oC) Tout (oC) mCp
C1 130 245 2
C2 190 250 4
H1 260 160 3
H2 250 130 1.5

Interval T ∆T ∑FCph-∑FCpc (∑FCph-∑FCpc)*∆T Initial Pass Final Pass


1 260 0 50
10 3 30
2 250 30 80
5 0.5 2.5
3 245 32.5 82.5
55 -1.5 -82.5
4 190 -50 0
30 2.5 75
5 160 25 75
30 -0.5 -15
6 130 10 60

Pinch Point (oC) 190 QH (KW) 50


Hot Pinch (oC) 200 QC (KW) 60
Cold Pinch (oC) 180
Experiment No 02: Minimum Utility Target and Pinch Point using HCC & GCC Method in MS Excel

Stream Tin (oC) Tout (oC) mCp


C1 120 235 2
C2 180 240 4
H1 260 160 3
H2 250 130 1.5

∆Tmin 10

QHCascade QHAvailable ∑FCpH ∆T H2 H1 THot

0 0 0 0 260
30 30 3 10 3 250
52.5 22.5 4.5 5 1.5 3 245
300 247.5 4.5 55 1.5 3 190
435 135 4.5 30 1.5 3 160
480 45 1.5 30 1.5 130

QNet QCascadeNet QAdjusted

0 0 50
30 30 80
2.5 32.5 82.5
-82.5 -50 0
75 25 75
-15 10 60
TCold C1 C2 ∑FCpC QCAvailable QCCascade

250 0 0 0
240 0 0 0
235 4 4 20 20
180 2 4 6 330 350
150 2 2 60 410 120
120 2 2 60 470 130
150
160
180
190
235
240
245
250
260
Experiment No 03: Minimum Utility Target and Pinch Point using Hint Software

Stream Tin (oC) Tout (oC) mCp


C1 120 235 2
C2 180 240 4
H1 260 160 3
H2 250 130 1.5

∆Tmin 10

Stream Description Type Heat type T1 (K)


1 c1 Cold Sensible 120
2 c2 Cold Sensible 180
3 h1 Hot Sensible 260
4 h2 Hot Sensible 250
t using Hint Software

T2 (K) H (kW) mcp (kW/K)


235 230 2
240 240 4
160 -300 3
130 -180 1.5
Experiment No 04: Minimum Utility Target and Pinch Point using LP in MS Excel

Stream Tin (oC) Tout (oC) mCp


C1 120 235 2
C2 180 240 4
H1 260 160 3
H2 250 130 1.5

∆Tmin 10

Pinch Point (oC) 190 QH (KW) 50


Hot Pinch (oC) 200 QC (KW) 60
Cold Pinch (oC) 180
int using LP in MS Excel
Experiment No 06: Design Heat Exchanger Network using Hint Software

Stream Tin (oC) Tout (oC) mCp


C1 120 235 2
C2 180 240 4
H1 260 160 3
H2 250 130 1.5

∆Tmin 10

Reconstruct Table by adding ∆Tmin in Cold Stream


Stream Tin (oC) Tout (oC) mCp
C1 130 245 2
C2 190 250 4
H1 260 160 3
H2 250 130 1.5

Interval T ∆T ∑FCph-∑FCpc (∑FCph-∑FCpc)*∆T


1 260
10 3 30
2 250
5 0.5 2.5
3 245
55 -1.5 -82.5
4 190
30 2.5 75
5 160
30 -0.5 -15
6 130

Pinch Point (oC) 190 QH (KW) 50


Hot Pinch (oC) 200 QC (KW) 60
Cold Pinch (oC) 180
using Hint Software

Initial Pass Final Pass


0 50

30 80

32.5 82.5

-50 0

25 75

10 60
Experiment No 10: Design and scheduling of batch process

Problem 1

Start Hr Duration Start Hr Duration


Task A A Non OverLapping
Series 2 Series 4 0 2 4 6 8 10 12 14 16 18
Stage 1 0 4 4 4 Stage 1
Stage 2 4 1 7 1
Stage 2
Stage 3 5 2 6 2
Stage 4 7 1 7 1 Stage 3

Stage 4

Column D Column F

Start Hr Duration Start Hr Duration


Task A A OverLapping
Series 2 Series 4 0 2 4 6 8 10 12 14

Stage 1 0 4 0 4 Stage 1
Stage 2 4 1 3 1 Stage 2
Stage 3 5 2 2 2 Stage 3
Stage 4 7 1 3 1 Stage 4

Column D Column F

Problem 2

Start Hr Duration Start Hr Duration Start Hr Duration Start Hr


Task
A A B B
Stage 1 0 5 0 5 0 2 2
Stage 2 5 2 3 2 0 4 0
Start Hr Duration Start Hr Duration Start Hr Duration Start Hr
Task
A B A B
Stage 1 0 5 0 2 0 5 0
Stage 2 5 2 0 4 1 2 0

Start Hr Duration Start Hr Duration Start Hr Duration Start Hr


Task
A B A B
Stage 1 0 5 1 2 1 5 1
Stage 2 5 2 1 4 2 2 1

Problem 3

Start Hr Duration Start Hr Duration Start Hr Duration Start Hr


Task
A B A B
Stage 1 0 6 2 3 0 6 2
Stage 2 6 4 1 2 4 4 1
Stage 3 10 3 0 2 6 3 0

Start Hr Duration Start Hr Duration Start Hr Duration Start Hr


Task
A B A B
Stage 1 0 6 0 3 1 6 0
Stage 2 6 4 0 2 4 4 0
Stage 3 10 3 0 2 5 3 0
Start Hr Duration Start Hr Duration Start Hr Duration Start Hr
Task
A B A B
Stage 1 0 6 0 3 0 6 0
Stage 2 6 4 0 2 3 4 0
Stage 3 10 3 0 2 4 3 0
Duration
B Overlapping AABB
2 0 5 10 15 20 25
4
Stage 1

Stage 2

A A B B
Duration
B Overlapping ABAB
2 0 2 4 6 8 10 12 14 16 18 20
4
Stage 1

Stage 2

A B A B

Duration Overlapping ABAB with


B Cleaning time 1Hr
2 0 5 10 15 20 25
4
Stage 1

Stage 2

A B A B

Duration
B Overlapping ABAB with
3 ZW
2 0 5 10 15 20 25 30
2 Stage 1

Stage 2

Stage 3

A B A B

Duration
B Overlapping ABAB
3 with NIS
2
0 5 10 15 20 25 30
2
Stage 1
Stage 2
Stage 3

A B A B
0 5 10 15 20 25 30
Stage 1
Stage 2
Stage 3

A B A B

Duration
B Overlapping ABAB
3 with UIS
2
0 5 10 15 20 25 30
2
Stage 1
Stage 2
Stage 3

A B A B