0% found this document useful (0 votes)
507 views2 pages

RB Policy Letter dt.20.04.2023 Reg TAG For Important Bridge

B Policy letter dt.20.04.2023 reg. TAG for important Bridge

Uploaded by

rvnlamcrnc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
507 views2 pages

RB Policy Letter dt.20.04.2023 Reg TAG For Important Bridge

B Policy letter dt.20.04.2023 reg. TAG for important Bridge

Uploaded by

rvnlamcrnc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Ref - 9.

15
( GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
****
No. 2014/CE-III/BR/Bridge Policy New Delhi, dated 20.04.2023

Principal Chief Engineer, Chief Administrative Officer (Cons.),


All Zo_nal Railways. All Zonal Railways.

Sub: Constitution of Technical Advisory Group (TAG) I Technical Advisory


Committee (TAC) for new important bridges / Rebuilding - Rehabilitation -
retro fitment of Major & Important Bridges.

Ref: Railway Bo!frd's letters of even number dated 09.03.2017 & 12.02.2020.
*****
With a view to simplify and empower Zonal Railways in quicker decision making,
the following consolidated guidelines may be followed in supersession of instructions issued in
respect of formation of TAG/TAC for new important bridges and rebuilding - rehabilitation -
retro fitment of major/important Bridges specially in cases where use of special type of span/use
of new technology/unconventional solution is envisaged and which warrants expert advice/input
or warrants use of codes other than Indian Railway Codes due to peculiarity of each case:

1. For new important bridges & rebuilding of important/ major bridge:

1.1 DBR should be prepared (as per BS-122) for important bridges by the executing
agency (e.g., CAO/C unit or PSU or any other) and should be approved by CBE.

1.2 DBR should be submitted to RDSO, if RDSO's association is required as per Railway
Board letter under reference above. In cases, where requirement of opinion from outside
experts is felt, RDSO will recommend formation of TAG/TAC to Zonal Railway.

1.3 CAO/C or PCE (for PSUs or any other organization/ unit) of the concerned Zonal
Railway will approve formation of TAG/TAC, its members and Terms of reference, keeping
ED/B&S/RDSO and CBE of concerned Zonal Railways as standing members of the
TAG/TAC.

1.4 Modified DBR including final TAG/TAC recommendations shall be further examined
by PCE/ CAO (executing agency) and forwarded to RDSO with their concluding
recommendations.

1.5 Modified DBR including final TAG/TAC recommendations duly recommended/


modified by PCE (for PSUs or any other organization/ unit) /CAO-C (executing agency)
shall be examined & accepted/modified/approved by PED/Infra/Il/RDSO (looking after B&S
Dte.). This should be informed to Railway Board on conclusion.

2. For Rehabilitation/ retrofitment of Important/ Major bridges:


2.1 Proposal including design concept, technical challenge/ justification including other
details and also DBR (if required) should be prepared by the executing agency (e.g., CAO/C
unit or PSU or any other) and should be approved by CBE.
2.2 Steps 1.2 to 1.5 as above should be followed in all cases, where RDSO association is(
required.
2.2.1 In all other cases not requiring RDSO's association following shall be
adopted;
2.2.2 Proposal by executing agency should be submitted to CBE, who will
recommend the formation of TAC/TAG to Executing agency.
2.2.3 CAO/C or PCE (for PSUs or any other organization/ unit) of the concerned
Zonal Railway will approve formation of TAG/TAC, its members and Terms of
reference, keeping CBE of concerned Zonal Railways as standing member of the
TAG/TAC.
2.2.4 Final TAG/TAC recommendations alongwith final recommendations of
executing agency (CAO/C, CBE for others) shall be accepted/approved/modified by
PCE. This should be informed to RDSO, Railway Board on conclusion.

This issues with the approval of the Board (M/lnfra).


��
�1-�
(L. L. Meena)
Director/Civil Engg./B&S
Ph: No. 011-478-45455
Copy to folJowing for information and necessary action please:

1. PED (Infra-II)/RDSO for kind information and necessary action please.


2. ED/B&S/RDSO for information please.
3. Managing Director, Konkan Railway Corporation Ltd, (KRCL), Post Box No:-9, Belapur
Bhawan, Sector-I 1, CBD Belapur, Navi Mumbai-400614, Maharashtra.
4. Chairman & Managing Director, IRCON, C-4, District Centre, Saket, New Delhi-I 00017.
5. Chairman & Managing Director, RITES, RITES Bhavan, Plot No-1, Sector-29, Gurgaon,
Haryana-122001.
6. Chairman, DMRC, Metro Bhawan, 13, Fire Bridge Lane, Barakhamba Road, New Delhi -
110001.
7. Chairman & Managing Director, CONCOR, CONCOR Bhawan, C-3, Mathura Road, Opp.
Apollo Hospital, New Delhi-110076.
8. Chairman & Managing Director, RVNL, 1st Floor, August Kranti Bhavan, Bhikaji Cama
Place, R.K. Puram, New Delhi.
9. Chairman, DFCCIL, 5th Floor, Pragati Maidan, Metro Station Building Complex, New
Delhi-I10001.
10. Chairman & Managing Director, MRVC, 2nd Floor, Churchgate Station Building,
Churchgate, Mumbai-400020.
11. Vice Chairman, RLDA, Near Safdarjung Railway Station, Moti Bagh-1, New Delhi-110021.
12. Managing Director NHSRCL, Asia Bhavan, Sector-9, 2nd Floor, Road No. 205, Dwarka,
Delhi.
13. Managing Director, Pipavav Rail Corporation Ltd, B 1202, B Wing, 12th Floor, Statesman
House, 148 Barakhamba Road, New Delhi -110001.

Room No. 132-B, Rail Bhawan, New Delhi-11000I.

You might also like