Quotation
Date Estimate #
Name / Address
28/10/2024 216
NUSTAR
South Reclamation, Cebu City
c/o Engr. Leebert John Samson Rep Project
CBP Chilled Water @ Texas Tenant
Description Qty Cost Total
Supply of labor, materials, tools, equipment, consumables,
supervision and technical expertise for the Installation of Chilled
Water Provision for Tenants (TEXAS)
Materials supply
Bi Pipe 2.5" Sch. 40 12 4,340.00 52,080.00
Gate Valve 2.5" 2 7,570.00 15,140.00
Bi Pipe 2.5" Sch. 40 ELBOW 4 370.00 1,480.00
Styro pipe Insulation 2.5" x 2" x 3ft 40 985.00 39,400.00
Grip Anchor 1/2" 37 93.00 3,441.00
Polyethelene Tape (Blue) 10 300.00 3,000.00
Full Threaded Rod 1/2" 30 645.00 19,350.00
Clevis Hanger 2.5" 32 186.00 5,952.00
Red Lead 6 950.00 5,700.00
Teflon 20 120.00 2,400.00
Drill Bit 1/2" 5 260.00 1,300.00
Flinkote 5 - Shell 3 3,250.00 9,750.00
Welding Rod - 20kg 2 3,000.00 6,000.00
Scaffold 4 5,000.00 20,000.00
LABOR COST 1 65,000.00 65,000.00
Mobilization & Demobilization 1 18,000.00 18,000.00
MarkUp 1 40,000.00 40,000.00
Subtotal PHP 307,993.00
VAT 12... PHP 0.00
Cliff B. Paglinawan
__________________________
Authorized Signature Total PHP 307,993.00