Aim Pyq

automation manufacturing question paper
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views2 pages

Aim Pyq

automation manufacturing question paper
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Code No: 5833AA R22

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD


M.Tech I Semester Examinations, March - 2023
AUTOMATION IN MANUFACTURING
(Advanced manufacturing Systems)
Time: 3 Hours Max. Marks: 60

Note: This question paper contains two parts A and B. i) Part- A for 10 marks, ii) Part - B for
JN

50 marks.
 Part-A is a compulsory question which consists of ten sub-questions from all units carrying
equal marks.
TU

 Part-B consists of ten questions (numbered from 2 to 11) carrying 10 marks each. From
each unit, there are two questions and the student should answer one of them. Hence, the
student should answer five questions from Part-B.
H

PART - A
(10 Marks)
U

1.a) Differentiate fixed automation and Programmable automation. [1]


b) What are the basic components of automated systems? [1]
c) Name the four traditional (non-automated) methods for storing materials. [1]
se

d) Define Monorail and conveyor. [1]


e) Trace out the importance of the precedence diagram in the line balancing. [1]
f) List out the advantages of the Kilbridge wester method. [1]
d

g) What is buffer storage? Write its significance [1]


h) What is meant by transfer line? [1]
pa

i) Define adaptive control constraints. [1]


j) What are the benefits of adaptive control? [1]

PART - B
pe

(50 Marks)

2.a) Distinguish between automated production system and CIM.


rs

b) Classify actuators. What is the difference between hydraulic and pneumatic actuators?
[5+5]
OR
3.a) Explain the different types of production automation. Show, by suitable graph, three types
20

of production automation as a function of production volume and product variety.


b) What are the principles of automation? [6+4]
23

4.a) Describe the use of Material Handling Equipment in Machine Tools.


b) Explain the various problems encountered in interfacing handling and storage systems with
manufacturing units. [5+5]
OR
5.a) Describe the following automated guided vehicle system with the help of simple sketch:
(i) Driverless automated guided train (ii) Unit load carrier.
b) Enumerate the differences between asynchronous conveyors and continuous motion
conveyors. [5+5]
6.a) Discuss the different types of assembly systems.
b) Explain the ways to improve line balancing in flexible assembly lines. [5+5]
OR
7.a) What are the methods used in industry to accomplish the assembly process?
b) What are the two ways in which transfer of work part takes place between workstations?
[5+5]
JN

8.a) Explain the two principal reasons for the use of buffer storage zones. Show by means of a
diagram the case of two processing lines separated by a storage buffer.
b) Draw the neat sketches of any two transfer mechanisms and discuss them briefly.
TU

[5+5]
OR
9.a) Explain any two work part transfer methods.
b) Write a short note on partial automation. [5+5]
H

10. Explain in brief about


a) Design for Automated Assembly, and
U

b) Quantitative Analysis of Assembly Systems. [10]


OR
11. A proposal has been submitted to replace a group of assembly workers, each working
se

individually, with an assembly line. The following table gives the individual work
elements.
Element Tc(min) Immediate predecessors
d

1 1 -
2 0.5 -
pa

3 0.8 1,2
4 0.63 2
5 1.2 3
6 0.2 3,4
pe

7 0.5 4
8 1.5 5,6,7
rs

The demand rate for this job is 1600 units/week (assume 40 h/week) and the current
number of operators required to meet this demand is eight using the individual manual
workers. (a) Construct the precedence diagram from the data provided on work elements.
20

(b) Use the largest-candidate rule to assign work elements to stations. What is the balance
delay for the solution? [10]
23

---ooOoo---