0% found this document useful (0 votes)
21 views1 page

Akbar Bhai Slab

HUH

Uploaded by

nikhil kothari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

Akbar Bhai Slab

HUH

Uploaded by

nikhil kothari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

SCHEDULE OF FIRST SLAB BEAMS 1. BASIC REFERENCE COD IS 456-2000.

BOTTOM BARS TOP BARS 2. GRADE OF CONCRETE FOR FOOTING,


COLUMNS,SLAB AND BEAMS IS M20
BEAM SECTION SIDE BARS STIRRUPS (UNLESS SPECIFIED) GRADE OF STEEL
B1 B2 ANCHOR/ LEFT FROM RIGHT FROM
STRAIGHT CURAIL
MAIN BAR SUPPORT L/4 SUPPORT L/4
3. MINIMUM CLEAR COVER FOR FOOTING
3NO.-#12 - 2NO.-#10 Di.8@-6C/C =50MM,COLUMN =40MM, BEAM =25MM,
B2R S2 B3R S2 B2R B1 6X18 - SLAB =15MM.
-
4. LAP LENGTH:-
2NO.-#12 - 2NO.-#10 - - Di.8@-6C/C M20 M25
B2 6X15 -
B3 B4 - COLUMNS
SLABS &
34XD
52XD
32XD WHERE "D"
46XD DIA OF BAR
5NO.-#12 - 2NO.-#10 1NO.-#12 1NO.-#12 Di.8@-6C/C BEAMS BAR
B3 9X18 - AT ANY SECTION OF SLAB/ BEAM NOT MORE
-

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


S2 SUNK THEN 50% BAR TO BE LAPPED & LAPS
SHOULD BE STAGGERED.
3NO.-#12 - 2NO.-#10 - - Di.8@-6C/C
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

B4 9X18 - 5. DESHUTTERING PERIOD SHALL NOT BE


-
B2 LESS THEN SPECIFIED.
a) SLAB :
4NO.-#12 - 2NO.-#10 Di.8@-6C/C
S1 B5 9X18 - i) UPTO 3.5M SPAN -7DAYS
B5 B6 B7 - ii) UPTO 5.0M SPAN -10 DAYS
b) BEAM - 21 DAYS
S2 B2 S2 SUNK 4NO.-#16 - 2NO.-#12 - - Di.8@-5C/C c) VERTICAL FACES OF COLUMNS,BEAM &
B6 9X24 - R.C.C WALLS-24 HRS.
-
Di.8@-6C/C 6. DO NOT SCALE THE DRAWING.
4NO.-#16 - 2NO.-#10 - - FOR DIMENSION REFER RELEVANT
B7 9X18 -
B2 - ARCH.DWG.

2NO.-#10 - 3NO.-#16 Di.8@-6C/C


S2 B2 S2 SUNK B1R 9X18
-
-

B3 B4 2NO.-#10 - 3NO.-#12 - - Di.8@-6C/C


B2R 9X18 - 1. FOR BEAMS HAVING WIDTH OF 150MM
- PROVIDE ONLY THREE BARS IN ANY ONE
2NO.-#10 - 4NO.-#12 - Di.8@-6C/C LAYER.
B3R 9X18 -
ST - 2. FIRST STIRRUP IN BEAM SHOULD START
@50MM FROM THE FACE OF SUPPORT (i e
4NO.-#12 - 2NO.-#12 - - Di.8@-6C/C COLUMN FACE OR BEAM)
ZB 9X21 -
-
3. FOR CANTILEVER BEAM TOP REINF.TO
4NO.-#12 - 2NO.-#10 - - Di.8@-6C/C BE ANCHOERD BEHIND FOR SPECIFIED OR
MB1 230X450 - SPAN OF CANTILEVER WHICHEVER IS
S1 - GREATER

4. IF DEPTH OF BEAM EXCEEDS 750MM


B6 S2
B5
B6 ST ZB SCHEDULE OF FIRST SLAB C/C OR SPECIFIED ON EACH FACE OF BEAM.

5. EVERY END SUPPORT TOP & BOTTOM


BARS OF BEAM SHOULD BE BENT INTO THE
MAIN STEEL SHORT SPAN MAIN STEEL LONG SPAN COLUMN BY (Ld+10dia) AS SHOWN IN FIG.
B3 DISTRIBUTION
SLAB DEPTH TYPE 6. LINKS SHOULD BE PROVIDED AT EVERY
STEEL JUCTION OF COLUMN AND BEAM
SUPPORT MID SPAN SUPPORT MID SPAN

ST S1 5 #10-@6C/C #10-@6C/C #8-@6C/C #8-@6C/C TWOWAY


ST 5 #[email protected]/C #[email protected]/C - - #[email protected]/C ONEWAY
S2 5 #[email protected]/C #[email protected]/C - - #[email protected]/C ONEWAY
B5
S1

B4
B4 RIGHT TOP CUT BAR RIGHT TOP CUT BAR

B3 S2
TOP STRAIGHT BAR LEFT TOP CUT BAR
TOP STRAIGHT OR ANCHOR BAR
LEFT TOP CUT BAR
TOP STRAIGHT OR ANCHOR BAR
Ld+
10xDia
SPECIFIED / L/4 SPECIFIED/ L/4 SPECIFIED/ L/4
SPECIFIED

B3

Ld+10xDia
SPECIFIED SPECIFIED
D

STIRRUPS
Left Dist Mid Right Dist

B4 CANTILEVER 50 50
L/3 MID L/3
50 50 L/3 MID L/3
50
BOTTOM BAR BOTTOM STRAIGHT BOTTOM STRAIGHT BAR
S2
B1R RIGHT
SUPPORT
LEFT
SUPPORT
BAR RIGHT
SUPPORT
LEFT
SUPPORT
BOTTOM CURTAIL BAR RIGHT
SUPPORT
SPAN 1 BS SPAN 2 BS SPAN 3 BS
B3R S2 B2R
NOTE:- DO NOT SCALE THE DRAWING, FOR
B1 B2 MEASUREMENTS PLEASE REFER
ARCHITECTURAL DRAWINGS
ALT. BENTUP
L1/4 L2/4 L2/4

STR PLAN OF FIRST SLAB & BEAMS END SUPPORT


L1/7 L1/5
I.M. SUPPORT
L2/5 L2/5

L1 L2

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

You might also like