0% found this document useful (0 votes)
17 views3 pages

Utility Corridor BOQ

Uploaded by

j.shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views3 pages

Utility Corridor BOQ

Uploaded by

j.shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

UTILITY CORRIDOR MATERIL LIST

QUANTITY
SL.NO MATERIALS UNIT
(6 SET)

1 Marine Plywood 18 mm (2.4 X1.2 M ) PC 168


2 Timber 10x10 (4.0 m Long) PC 84
3 Tie Rod 16 mm dia (4m Long) PC 18
4 Tie Rod 16 mm dia (1.2 m Long) PC 72
5 Super Plate PC 180
6 H20 Beam (3.9 m Long) PC 264
7 UPN 120 ( L=12m) PC 56
8 Flange clamp PC 396
9 15 mm Bolt with Nut PC 144
10 Hollow Section (40x40x4 mm) PC 5
11 10mm MS PLATE 2.4 X 1.2 M(FOR HOOK) PC 1
UTILTY CORRIDOR

SHUTTER-2
SHUTTER-1
SL.NO MATERIALS UNIT 2-PC (INSIDE WALL & 2-PC STOPPER-SLAB
(OUTSIDE WALL)
BOX OUT)
1 Marine Plywood 18 mm (2.4 X1.2 M ) PC 5.5 11 5.5 11 1
2 Timber 10x10 (4.0 m Long) PC 0 1 2 2
3 Tie Rod 16 mm dia (4m Long) PC 3 3 0
4 Tie Rod 16 mm dia (1.2 m Long) PC 6 12 0
5 Super Plate PC 9 18 6 12
6 H20 Beam (3.9 m Long) PC 12 24 10 20
7 UPN 120 (L=12m) PC 2 4 2 4
8 Flange clamp PC 18 36 15 30
9 15 mm Bolt with Nut PC 6 12 6 12

10 Hollow Section (40x40x4 mm) PC


(FOR PREPARING DOUBLE UPN)

11 10mm MS PLATE 2.4 X 1.2 M PC


(FOR PREPARING LIFTING HOOK)
QUANTITY FOR 1 LIFTING FRAME &
2-PC STOPPER-WALL 4-PC FOR 6 SET
SET TOP BEAM

2 1 4 28 168
4 2 8 14 84
0 0 3 18
0 0 12 72
0 0 30 180
0 0 44 264
0 0 8 8 56
0 0 66 396
0 0 24 144