Rvnl-Ands3-W-21ttm-Ar-1401 (R-1) Platform
Rvnl-Ands3-W-21ttm-Ar-1401 (R-1) Platform
A B C D E F G H J K L M N P Q R
STATION
CH: 25418.061
ENTRY STRUCTURE
ROOF BELOW
ANDS3-G-21TTM-AR-1705
ANDS3-G-21TTM-AR-1701
F
ANDS3-G-21TTM-AR-1703
A
ANDS3-G-21TTM-AR-1704
ANDS3-G-21TTM-AR-1702
C
ANDS3-G-21TTM-AR-1705
B D E
13670 14680 1250 18000 18000 16800 1250 13950 16800 12100 9500 1250 14680 14680 13390
2150
D4 D4 D13
2800
2800
TERRACE
C v
SPACE 31c SPACE
C v DN OUTDOOR AC
5425
5425
5120
W B W B
DN
300MM WIDE
S
F
b
2 FOR DB D4 D4a
FOR DB
S
F
b
2
4000
UNITS
41 W6
300MM WIDE
GUTTER SPACE FOR 150MM RAISED GUTTER
PLATFORM FOR 4100
9925
WATER TANK
1750
1750
ELECTRICAL C v
6575
F.H.C.
SPACE FOR ESCALATOR: E-21TTM-21 S&T
4500
4345
C v
C v
VIADUCT DB 19752 ESCALATOR: E-21TTM-22 C v C v
3740
C v WG
WG C v
LENGTH 19752 19752 SHAFTS EXPANSION
WG WG
S f
F 11
WG
S f
WG
S f
F 11 LENGTH 19752 SPACE FOR S f
F 11
S f
F 11
S f
F 11
F 11 HEIGHT 6585 JOINT VIADUCT DB
PLATFORM HEIGHT 6585
1475
3575
2100 2100
VIADUCT VIADUCT
27000
16150
4200
7150
3575
1475
3740
SPACE FOR
4345
WG
PLATFORM
4500
C v S f C v C v C v
C v
WG SPACE FOR
WG
S f
C v
WG
S f
LENGTH 19752
S&T
F 11 19752 LENGTH 19752 WG
S f EXPANSION
VIADUCT DB WG
S f
WG
S f
6575
S f
F 11 HEIGHT 6585 19752 HEIGHT 6585 F 11 F 11 F 11
F 11
VIADUCT DB F 11
SHAFTS JOINT
F.H.C.
1750
1750
9925
32f SPACE FOR
WATER TANK
ELECTRICAL 32g
SHAFT TERRACE
300MM WIDE ABOVE 300MM WIDE
5425
5425
44 37 36 25 24 13 12 1 1 12 13 24 25 36 37 44
4000
J
2800
2800
GUTTER TERRACE C v
SPACE SPACE C v GUTTER
2150
W B D4 D4a W B
DN
DN S
F
b
2 FOR DB 31d FOR DB S
F
b
2
F.H.C.
ANDS3-G-21TTM-AR-1706 D4 D4
E F G H STATION
J K L GENERAL NOTE:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
METERS UNLESS OTHERWISE STATED.
CH: 25418.061 2. ALL DIMENSIONS ARE TO BE READ AND NOT MEASURED.
3830
SLOPE
SLOPE
SLOPE
SLOPE
IN BEAM IN BEAM IN BEAM VARY AS PER ARCHITECTURAL FEATURES OF THE STATION. THE
1:50
1:50
1:50
1:50
1:50
SHAFT SHAFT b 18MM THK. PREPOLISHED GRANITE ON RISERS. 04 21TTM-C-CO-S-P4 200X200MM SLEEVE
21TTM-C-CO-S-P1 21TTM-C-CO-S-P2 FIRE & WATER RAIN WATER 21TTM-C-CO-S-P3 21TTM-C-CO-S-P4 DETAIL DRAWINGS TO BE SUPPLIED BY RVNL DURING
11000 200X200MM 200X200MM SUPPLY SHAFT DRAINAGE SHAFT 200X200MM 200X200MM 4550 f 25MM THK. POLISHED GRANITE UP TO 1200MM.
ENTRY STRUCTURE CONSTRUCTION.
05 21TTM-C-CO-S-P5 200X200MM SLEEVE
SLEEVE FOR RWP SLEEVE FOR RWP SLEEVE FOR RWP SLEEVE FOR RWP ROOF BELOW 9. FRONT WALL AT ALL SHAFTS NOT TO BE CASTED UNTILL
AREA LEGEND 06
3
S.NO FLOORING FINISH 21TTM-C-CO-S-P6 200X200MM SLEEVE INSTALLATION HAS BEEN DONE.
3270 D10 D10 2 25MM THK. FLAMED GRANITE ON TREADS.
OPERATIONAL ROOMS 07 21TTM-C-CO-S-P7 200X200MM SLEEVE 10. ANY DISCREPANCIES MUST BE BROUGHT TO THE NOTICE OF RVNL
24 13 12 1
4000 2500 4000 1 12 13 24
19
2150
BEFORE EXECUTION.
2800
2800
2800
SPACE FOR 08
13 31c 07 20 11 21TTM-C-CO-S-P8 200X200MM SLEEVE 11. POSITION OF STUB COLUMNS AS PER ESCALATOR
4965
UP UP BAGGAGE
D1a
PROPOSED
22 SPACE
21 50b D1b SCANNER D1a S.NO. ROOM AREA (SQM)
MANUFACTURE'S DETAIL.
12. TENDER DRAWING INDICATES THE EXTENT OF WORK INVOLVED
5000 3430 REFERENCE DRAWINGS:- HOWEVER THE ACTUAL WORK SHALL BE EXECUTED AS PER
FOR DB S&T ELECTRICAL 18 17a UNISEX TOILET ROAD LEVEL PLAN - ANDS3-C-21TTM-AR-1101
1750
1750
2150
2890
31d S.NO. SYMBOL SYMBOL DESCRIPTION
STATION
CH: 25418.061 1 01 ESCALATOR WITH DIRECTION OF MOVEMENT
A
1. ACID PROOF TILES APPROVAL VIDE LETTER NO. RVNL-KOL-METRO-ANS3-1-74 -604 dt. 26.05.21
05 ANDS3-G-21TTM-AR-1701 SECTION LINE WITH SECTION NO & SHEET NO.
S&T ELECTRICAL
G H J 06 DRAIN PIPE
2. VITRIFIED TILES APPROVAL VIDE LETTER NO. RVNL-KOL-METRO-ANS3-1-74 -614 dt. 28.05.21
1750
1750
1830
SHAFTS SHAFT
32f 32g D1b D1b
07 PLATFORM AREA 3. INCORPORATION OF DOOR ''D1f" INSTEAD OF D3 IN A.S.S/ T.S.S ROOM AS PER LETTER No. RVNL-KOL-METRO-ANS3-1-1183
dated 21.03.22
22 40 09 08 06 1250 13950
5215
DOOR & WINDOW SCHEDULE 4. APPROVAL OF 'D1f' DOOR AS PER LETTER No. 1103 dated 15.02.22
50c D1 D1b
2800
2800
11
2570
14 UP
4000
31d 4000
UP GUTTER SUPPLY SHAFT DRAINAGE SHAFT
D/W
NO.
OPENING
CILL LEVEL LINTEL LEVEL PARTICULARS
5. APPROVAL OF P.O.P TO PUTTY& PAINTING AS PER LETTER No. ITDCEM/RVNL/ANS3/2021/DW/556
3270 4000 2002 24
13 12 1 2500 1 12 13
24 5900 4000 2900 3540 3730 2500 *WIDTH HEIGHT
6. APPROVAL OF GRANITE FLOORING IN PLACE OF KOTA FLOORING AS PER LETTER No. RVNL/KOL/METRO/ANS3/1/28/76
1 200X200MM
D10
200X200MM 200X200MM
D10
200X200MM 3
D1
D4
1050
750
2100
1800 300
- 2100
2100
METAL DOOR
METAL DOOR
DATED-19.08.2020
7. APPROVAL OF USE HONED GRANITE STONE IN TREADS AND LANDING OF STAIRCASE,ALL FLOORS & FLAMED GRANITE
2890
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
2900
2900
SLEEVE FOR RWP SLEEVE FOR RWP SLEEVE FOR RWP SLEEVE FOR RWP
1:50
1:50
1:50
1:50
1:50
TCPL-FH JV'S SCOPE OF WORKS DOES NOT INCLUDE SUPERVISION OF CONSTRUCTION FOR THIS PROJECT. THESE
DRAWING REPRESENT THE "AS-BUILT"STATUS OF CONSTRUCTION ON SITE AS CONFIRMED BY THE
"Godrej Waterside", Tower No. 1, Office #803, 8th Floor, Plot No. 5,
OF RAIL VIKAS NIGAM LTD.
CONTRACTOR/SUPERVISION AGENCY.ALL THE SKETCHES, FCR, OTHER CHANGES INFORMED VIDE EMAIL'S SITE
Commitment , Reliability & Quality
Block -DP, Sector - V, Salt Lake City, Kolkata -700091 METRO CORRIDOR - NEW GARIA TO BIMAN BANDAR, KOLKATA
INSTRUCTION REGISTER ETC.PREPARED AND ISSUED DURING CONSTRUCTION STAGES OF THE PROJECT AND AS
SUPPLIED BY CONTRACTOR HAVE BEEN INCORPORATED IN "AS BUILT"DRAWING.
PH. +033-23412400 FAX: +033-23412410
21TTM
METRO RAILWAY STAMP
20SC2
CONTRACT: ANS3: CONSTRUCTION OF 7 ELEVATED METRO STATIONS
TANDON CONSULTANTS PVT. LTD. WITHOUT FIELD CHANGE REQUEST
23VPR
22RBT
19CVC
INCLUDING RELATED WORKS FROM SUB CBD1 TO TITUMIR
17, LINK ROAD, JANGPURA EXTN. NEW DELHI-110014. PH. +91-11-24317684, 24319288, 24310509 FAX:
IN NEW GARIA-AIRPORT CORRIDOR OF KOLKATA
14BDN
18NTN
13TNP
+91-11-24316057 EMAIL: tandon@tcpl.com, tcpl_123@yahoo.com 17CB2
1ST FLOOR, AUGUST KRANTI BHAWAN, PLOT NO. 25, BHIKAJI CAMA PLACE, R.K. PURAM, NEW DELHI - 110066 WITH FCR BUT NO CHANGE IN DESIGN 12SLV
ARCHITECT & SERVICE CONSULTANTS 16CB1
15SC1
11NCO
FOUNTAINHEAD
ARCHITECTURE
10GKG
RVNL'S SCOPE OF WORKS INCLUDE DESIGN COORDINATION AND CONSTRUCTION SUPERVISION FOR THIS PROJECT.THESE DRAWING WITH FCR AND CHANGE IN DESIGN TITUMIR
09BLG STATION:
REPRESENT THE "AS BUILT"STATUS OF CONSTRUCTION ON SITE. FAX: C-9/9148, VASANT KUNJ, NEW DELHI - 110070. TEL: +91 11 26891534 +91-11-26898459 08BSG N
EMAIL: office@studiofountainhead.com 07RWG
06VBZ
NAME & DESIGNATION SIGN & DATE NAME & DESIGNATION SIGN & DATE
METRO RAILWAY DRAWING NO:
05HMJ
04KSK
03JNN
TITLE: PLATFORM LEVEL PLAN
AB
MR. N.K.SINGH MRS.S.KASHYAP MR. H.SINGH MR.KAMALESH CHAKRABORTY MR. S.K.MUKHOPADHYAY MR.R.KRISHNA DATE:
MR.PRAVEEN KUMAR MR.RAJAT MATHUR
SHAULI CHAKRABORTY MOUSUMI CHAUDHURI MR.ANIRUDDHA GHOSAL MR.SUKHAMOY MAHADANI
02SRY REV. SCALE STATUS
GM / METRO-CIVIL / CO. SR / DGM / ARCHITECTURE CPM / KOL-II AGM / CIVIL / EXPERT / KOL-II AGM / ELECTRICAL / KOL. GM/S&T/KOL. (VICE PRESIDENT) (CHIEF ARCHITECT) 01KSU DWG NO : RVNL-ANS3-ITD-AB -21TTM-AR-1401 AB-0 1:250 08.12.23 AS BUILT
PREPARED BY (CAD OPERATOR) CHECKED BY (DY.PROJECT MANAGER) PEER CHECKED BY (CHIEF SURVEYOR) APPROVED BY (PROJECT MANAGER) STATION LOCATION