0% found this document useful (0 votes)
29 views12 pages

Project 1

Uploaded by

inamdarparvej19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views12 pages

Project 1

Uploaded by

inamdarparvej19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Government Polytechnic,

Awasari(kh) Dept. of Computer


Engineering Project Diary
AY: 2024-2024
Group Id: 05
Group Members :-
Roll No. Name of Members
23CO367 Raheem Sattar Mulla
23CO360 Parvej Ashpak Inamdar
23CO343 Sakshi Sharad Lohakare
23CO354 Bhatt Harsh

Guide Signature with Name


Appendix D

ProjectDiary

Week No. 01 Date 🡺 1 Aug 2024 to 4 Aug 2024

Activities Planed: 🡺

● Teacher have Explained about Capstone Project Planning.

Activities Executed:🡺

● We learned how to develop a capstone project.

Reason for delay if any: 🡺

● Completed on time.

Corrective measures adopted:

● NA

Remarks and Signature of Guide:


Appendix D

ProjectDiary

Week No.02 Date 🡺 5 Aug 2024 to 9 Aug 2024

Activities Planed:

● We have done planning for forming a group.

Activities Executed:

● We have formed the group for capstone project.

Reason for delay if any: 🡺

● Delay in forming group.

Corrective measures adopted:

● NA

Remarks and Signature of Guide:


Appendix D

ProjectDiary

Week No.03 Date 🡺 12 Aug 2024 to 16 Aug 2024

Activities Planed:

● We have done discussion with group members and give 3 mentors name for
capstone project to the respective teacher.

Activities Executed:

● We have given 3 mentors name for capstone project to the respective teacher.

Reason for delay if any:

● Completed on time.

Corrective measures adopted:

● NA.

Remarks and Signature of Guide:


Appendix D

ProjectDiary

Week No.04 Date 🡺19 Aug 2024 to 23 Aug 2024

Activities Planed:

● We have given 3 mentors name to the respective teacher and then finalize one
mentor for our group.

Activities Executed:

● Teacher have successfully assigned a mentor to our group form the given 3 names.

Reason for delay if any:

● Completed on time.

Corrective measures adopted:

● NA.

Remarks and Signature of Guide:


Appendix D

ProjectDiary

Week No.05 Date 🡺 26 Aug 2024 to 30 Aug 2024

Activities Planed:

● We have done planning for deciding the topics for capstone project.

Activities Executed:

● We have decided 4 topics for capstone project 1. Automatic Fire Extinguisher


Car 2. Automatic Irrigation System 3.Vehical Rental System and did research
on it.

Reason for delay if any:

● Completed on time.

Corrective measures adopted:

● NA.

Remarks and Signature of Guide:


Appendix D

ProjectDiary

Week No.06 Date 🡺 02 Sep 2024 to 06 Sep 2024

Activities Planed:

● We have done discussion with guide about explored 4 topics and then finalizes
one topic for project that is Automatic Fire Extinguisher Car.

Activities Executed:

● We have given a presentation of explored topics to the guide, discussed with guide
and finalized
one topic accordingly.

Reason for delay if any:

● Completed on time.

Corrective measures adopted:

● NA.

Remarks and Signature of Guide:


Appendix D

ProjectDiaryFormat

Week No.07 Date 🡺 09 Sep 2024 to 13 Sep 2024

Activities Planed:

● We have done discussion with team members about topic and started
gathering information about it.

Activities Executed:

● We have gathered the information related to our project topic.

Reason for delay if any:

● Completed on time.

Corrective measures adopted:

● NA.

Remarks and Signature of Guide:


Appendix D

ProjectDiaryFormat

Week No.08 Date 🡺16 Sep 2024 to 20 Sep 2024

Activities Planed:

● We have analysis and verified the information that we have gathered.

Activities Executed:

● We have done analysis of the information that we have gathered.

Reason for delay if any:

● Completed on time.

Corrective measures adopted:

● NA.

Remarks and Signature of Guide:


Appendix D

ProjectDiaryFormat

Week No.09 Date 🡺 23 Sep 2024 to 30 Sep 2024

Activities Planed:
● We have done discussion with team members about which programing language do
we needed to develop the project.

Activities Executed:
● We have decided which programming languages we required for developing project.

Reason for delay if any:


● Completed on time.

Corrective measures adopted:


● NA.

Remarks and Signature of Guide:

You might also like