0% found this document useful (0 votes)
42 views13 pages

DFQ 201-2218 (Revised)

Uploaded by

chandra mohan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views13 pages

DFQ 201-2218 (Revised)

Uploaded by

chandra mohan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 13

Phenix Construction Technologies - DFQ Cover Sheet

Sr. No. Parameter/Field Value/Entry/Input Others/Remarks


1 Date
2 DQ No
3 Sales Office
4 Sales Zone
5 Sales Person
6 Name of client
7 Application

8 Industry

9 Category of client
10 Size of enquiry
11 Source of enquiry
No of previous
12
enquiries
13 Type of competitor(s)
Name(s) of
14
competitor(s)
15 Location of job site
Site Readiness for
16
supply

A
h
m
e
d
a
Ib
a
n
d
o
r
e

B
h
u
v
a
n
C
e
h
s
e
h
n
w
n
a
a
r###
i
###
###

###

###
###
###

###
PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

A. General Data

DFQ NO : 201-2218 Name of Client : Neogen Chemicals Ltd.

Name of Sales Person : Yogesh Gaikar Job Site & District: Pakhajan, Bharuch.

Sales office : Mumbai West I Name of Consultant : Knexir Consultants

Date of DFQ : 21.06.2024 Revision No R4 Date Of Revision : 2/12/2024 Building : A1 of A

B. Building Description

Name Of building: Warehouse 1 Frame Type: Clear Span

Building Parameters Main Building Lean To Shed - 1 Lean To Shed - 2

Length (m) 30m C/C

Width (m) 36.4m C/C

Clear Height (m) 11.9m

Bottom of base plate shall be 500mm below finished floor level of respective floor. Anchor bolt- Black
Base Plate Bottom With reference to FFL
(un-painted)

Roof Slope 1:20

Bay Spacing 5 @ 6m C/C

End wall Column Spacing 4 @ 7m C/C + 1 @ 8.4m C/C

Internal Column Nos & spacing As per drawing

Jack Beam Requirement NA

Future expansion Along left endwall as per shown in drawing

Roof Extensions NA

Brick wall Condition : Front Side wall 3.150m Brick wall and above sheeting

Brick wall Condition : Back Side wall 3.150m Brick wall and above sheeting

Brick wall Condition : Left End wall 3.150m Brick wall and above sheeting On grid 1 brick wall height 1m and above sheeting

Brick wall Condition : Right End wall 3.150m Brick wall and above sheeting on grid 8 brick wall height 1m and aboce sheeting

Bracings
At Peripheral Column Portal+Rod Bracings
Wall Bracing
At Internal Column Portal+Rod Bracings

Roof Bracing Diagonal Rod Braccings

Remark

C. Sheeting & Gutter Down takes

Sheeting Specifications Insulation Mesh For Insulation

26 gauge Standing Seam Galvalume sheet


(0.55 TCT) with yield strength of 345 MPA.
Roof Sheeting Rockwool 50mm 48kg/cum Dense Refer Notes GI 25x25x1.6
Top Sheet: External Face: color-coated
and Internal Face: Bare Galvalume/ precoated galvalume

26-gauge high tensile profiled Galvalume


sheet (0.55 TCT) with yield strength of 345 MPA.
Wall Sheeting NA NA NA NA NA
Exterior sheet: External face: Pre-coated Galvalume
Interior face: Bare Galvalume / Precoated

26-gauge high tensile profiled Galvalume


sheet (0.55 TCT) with yield strength of 345 MPA.
Roof Liner Sheeting Sub purlin Required : Yes Sub purlin Fixing Arrangement: Inside main Girt
Exterior sheet: External face: Pre-coated Galvalume
Interior face: Bare Galvalume / Precoated

Wall liner needs provided only the area shown below the mezzanine
Wall Liner Sheeting Sub girt Required: Yes Sub Girt Fixing Arrangement: Inside main Girt
as per drawing
1. PVC caps to match Roof sheet color. Water tight roofing system to be ensured.
1) Insulation and Liner sheet to be provided at locations indicated in the tender drawings.
2) Liner sheets where-ever indicated inside the warehouses shall be provided above purlins.
Remark 3) Liner sheets where-ever indicated below canopies shall be provided below purlins to conceal the purlins.
4) Junction of liner sheet with brick walls shall be suitably closed using soffit sheets
5) Consider the side wall sheeting between grid 7 to 8 from axis B to E upto 0.850m height

Gutter & Downspouts


Down-take pipes to be of same material
as that of the side cladding ie 26-gauge GI
Main Building Gutter : Galvalume Main Building Downspout : Material and of Rectangle in shape. ( Pipes to be provided with
bends at end to terminate
in manholes 1500 mm )
Canopy Gutter Yes Canopy Down take Yes

Remark 1. Pipes to be provided with bends at end to terminate in manholes 1500 mm below FGL (Finish Ground Level). If necessary, at certain locations RWP to be left above the adjacent roof.

D .Canopy & Framed Opening

Canopy

Location Nos Length (m) Width (m) Clear Height (m) Type of Canopy Soffit Required ? Gutter & Down take

On end wall between axis D to E 1 One Bay 3 4 Front Sloped Yes Yes

On west end wall between axis D to E 1 One Bay 3 2.2 Front Sloped Yes Yes

Lean to shed 1 3.2 1 1.2 Front Sloped Yes Yes

On axis C between grid 1 and 2 1 One Bay 3m 4.800m Front Sloped Yes Yes

On axis C between grid 7 and 8 1 One bay 3m 4.800m Front Sloped Yes Yes

Remark

Framed Opening

Location Nos Size (m) WxH Usage Door & Jamb Type (Hot Rolled / Cold Formed)

On end wall between axis D to E 1 3X4 Motorized Rolling Shutter Hot Rolled Members

In lean to shed 2 1 X 2.2 For Door Hot Rolled Members

Lean to shed 1 3 X 1.2 Window Cold Form Members

On west end wall between axis D to E 1 1 X 2.2 For Door Hot Rolled Members

On axis C between grid 1 and 2 1 3m X 4m Motorized Rolling Shutter Hot Rolled Members

On axis C between grid 7 and 8 1 3m X 4m Motorized Rolling Shutter Hot Rolled Members

Remark

E. Mezzanine
CL Stud's Deck sheet Thick Including / Excluding
Location & Size LL (KN/Sqm) DL (KN/Sqm) Clear Height Handrails Nos of Staircase Staircase Treads Slab Thickness
(KN/Sqm) Requirement (mm) Deck

Refere Refere 150mm above


Between axis E to B and grid 7 to 8 Refere remarks 4.950m TOC NA 1 no as per drawing RCC 0.8mm Excluding
remarks remarks deck sheet
PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

Refere Refere 150mm above


Between axis B to F and grid 1 to 2 Refere remarks 5m TOC NA 1 no as per drawing RCC 0.8mm Excluding
remarks remarks deck sheet

Live Load on mezzanine floors


1. AHU Mezzanine & Deck Slab =5 Kn/m2
2. Wash areas if any on deck slab area to be designed for an additional load of 200mm thick brickbat filling.
3. Note that difference in top of steel beam for normal floor and the steel beamfor sunken floor shall be 200mm. Thus after filling the sunken area and laying the floor finish over entire floor, the top of entire floor shall be at the same
Finished floor level.
Dead Loads on mezzanine floors
1. Deck slab (if indicated in the drawing)=150 thick RCC slab + Floor Finish =3.25 KN/m2
Staircase
Remark Pan type staircases to be considered at locations indicated in tender drawings.Self-weight load of concrete and floor finish provided within the pan of the tread to be considered in design of staircase.
Concrete over pan type treads and floor
finish shall not be in PEB scope.
i) Below Points eed to consider :-econdary / tertiary beams supporting equipment’s shall be permitted to be connected to primary members by welded connections at a later stage if necessary.
ii. All edge angles at periphery of deck slab shall have vertical leg up to top of proposed concrete RCC slab with proper supports at bottom to prevent sagging.
iii. Waterproof Mezzanine floor whether in chequered plate or with RCC deck slab is to be provided by PEB vendor.
iv. No column-beam connection plates to project above the top of steel beam as it would hinder the laying of deck sheet or chequered plate.
v. All plate to beam connections of entire chequered plate platform should be watertight by full length welds, necessary edge angles, backing platesetc
As per shown in drawing railings need to consider around the stairccase

F. Crane
Top of Bracket / Walkway
Type Location Capacity (MT) Nos Span (m) Crane Run Tandem Operation Walkway Walkway Handrail Cage Ladder Crane Beam & Brackets
Hook Height (m) Width

Remark NA
PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

G. Building Add On

1. Fascia

Location Types of Fascia Height Soffit Sheeting Fascia Outer sheet Fascia inner sheet

Remark NA

2. Partition wall
Removable /
Location Length of Partition (m) Type of sheeting Single Skin / Double skin Brick wall Condition Girt Condition Insulation
Nonremovable

Remark NA

3. Ventilation Add On

Roof Monitor Ridge Vent Turbo Vent

NA NA 10 Nos

Remark Location of turbovents will finalized during GAD approval stage.

Louvers

Location Size (m) WxH Nos Type of Louvers

Remark NA

4. Building's Natural Light System

Skylight: 2mm Thick 1m x 3m Skylight 5% of roof area

Wall Light: Others Please refer Notes 10 Nos (Locations are as per shown in drawing)

Remark For wall light 3mm polycarbonate sheet to be considered with proper framing.

5. Safety Life line system


Lifeline supports all around the building roof edge and on either side of ridge shall be fixed with suitable water tightening
Type of Life line : MT & T Location :
arrangements. Safety Wire ropes are to be considered.

Remark

6. Cage Ladder
For Main Shed For High bay to low bay For Lean To For Crane Walkway Any other location

2 cage ladder for roof access along with mid-landing (0 to 15m


height)

Remark

H. Design Data

Design Code Roof Live Load (KN/Sqm) Roof Dead Load (KN/Sqm) Wind Velocity m/sec Seismic Zone PeakRain
rainfall
fallintensity
Intensityshall Deflection Criteria
be as per local
guidelines considering the
44 m/s (3 sec Gust)-
IS 800 2007 Without Chapter 12 0.75 As per Design III maximum As per tender
Exposure category B
intensity of rainfall of the
respective site
Frame & Secondary under consideration.

Main Column Base Condition: Fixed/Pinned Minimum Thickness for Primary (mm) 4

Wind column Base Condition: Fixed/Pinned Minimum Thickness for Crane Beam (mm) As per design

Mezzanine Columns Base Condition: Fixed/Pinned Minimum Thickness for Secondary (mm) 1.5

Primary Material grades : 345 Mpa Secondary Finish Coating 275 GSM

Additional Loads

Solar Load on Roof Kn/sqm Collateral Load on Rafters kg/Sqm Collateral Load on Purlin kg/Sqm Collateral Load on column Kg Temperature Load Any Other Load (Kg/Sqm)

As applicable as per local codes and


Cable tray - 0.20 KN/m2 Cable tray - 0.20KN/m2
0.2 geometry of the building. Diff in temp =
Sprinkler - 0.20 Kn/m2 Sprinkler - 0.20 Kn/m2
15deg

Pipe Rack / Cable tray


One side / two Side of
Location Height from FFL (m) bracket Projection (mm) Load on Bracket (kg/m) Supporting Structure Required Type of supporting structure (HR / Cold Form)
Column

Remark NA

Version -03, Date : 18-05-2022


PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

A. General Data

DFQ NO : 201-2218 Name of Client : Neogen Chemicals Ltd.

Name of Sales Person : Yogesh Gaikar Job Site & District: Pakhajan, Bharuch.

Sales office : Mumbai West I Name of Consultant : Knexir Consultants

Date of DFQ : 21.06.2024 Revision No R4 Date Of Revision : 2/12/2024 Building : A1 of A

B. Building Description

Name Of building: Warehouse 2 Frame Type: Clear Span

Building Parameters Main Building Lean To Shed - 1 Lean To Shed - 2

Length (m) 37m C/C

Width (m) 39.190m C/C

Clear Height (m) 11.9m

Bottom of base plate shall be 500mm below finished floor level of respective floor. Anchor bolt- Black
Base Plate Bottom With reference to FFL
(un-painted)

Roof Slope 1:20

Bay Spacing 24m C/C

End wall Column Spacing 5 @ 7m C/C + 1 @ 4.190m C/C

Internal Column Nos & spacing As per drawing

Jack Beam Requirement NA

Future expansion Along left endwall as per shown in drawing

Roof Extensions NA

Brick wall Condition : Front Side wall 3.150m Brick wall and above sheeting

Brick wall Condition : Back Side wall 3.150m Brick wall and above sheeting

Brick wall Condition : Left End wall 3.150m Brick wall and above sheeting On grid 1 brick wall height 1m and above sheeting

Brick wall Condition : Right End wall 3.150m Brick wall and above sheeting on grid 8 brick wall height 1m and aboce sheeting

Bracings
At Peripheral Column Portal+Rod Bracings
Wall Bracing
At Internal Column Portal+Rod Bracings

Roof Bracing Diagonal Rod Braccings

Remark

C. Sheeting & Gutter Down takes

Sheeting Specifications Insulation Mesh For Insulation

26 gauge Standing Seam Galvalume sheet


(0.55 TCT) with yield strength of 345 MPA.
Roof Sheeting Rockwool 50mm 48kg/cum Dense Refer Notes GI 25x25x1.6
Top Sheet: External Face: color-coated
and Internal Face: high
26-gauge Baretensile
Galvalume/ precoated
profiled galvalume
Galvalume
sheet (0.55 TCT) with yield strength of 345 MPA.
Wall Sheeting NA NA NA NA NA
Exterior sheet: External face: Pre-coated Galvalume
26-gauge
Interior high
face: tensile
Bare profiled /Galvalume
Galvalume Precoated
sheet (0.55 TCT) with yield strength of 345 MPA.
Roof Liner Sheeting Sub purlin Required : Yes Sub purlin Fixing Arrangement: Inside main Girt
Exterior sheet: External face: Pre-coated Galvalume
Interior face: Bare Galvalume / Precoated
Wall liner needs provided only the area shown below the mezzanine
Wall Liner Sheeting Sub girt
1. PVC caps Required:
to match Yes roofing system to be
Roof sheet color. Water tight Sub Girt Fixing Arrangement:
ensured. Inside main Girt
as per drawing
1) Insulation and Liner sheet to be provided at locations indicated in the tender drawings.
2) Liner sheets where-ever indicated inside the warehouses shall be provided above purlins.
Remark 3) Liner sheets where-ever indicated below canopies shall be provided below purlins to conceal the purlins.
4) Junction of liner sheet with brick walls shall be suitably closed using soffit sheets
Gutter
5) Consider & Downspouts
the side wall sheeting between grid 7 to 8 from axis B to E upto 0.850m height

Down-take pipes to be of same material


as that of the side cladding ie 26-gauge GI
Main Building Gutter : Galvalume Main Building Downspout : Material and of Rectangle in shape. ( Pipes to be provided with
bends at end to terminate
in manholes 1500 mm )

Canopy Gutter Yes Canopy Down take Yes

Remark 1. Pipes to be provided with bends at end to terminate in manholes 1500 mm below FGL (Finish Ground Level). If necessary, at certain locations RWP to be left above the adjacent roof.

D .Canopy & Framed Opening

Canopy

Location Nos Length (m) Width (m) Clear Height (m) Type of Canopy Soffit Required ? Gutter & Down take

Not Fixed 2 One Bay 3 4 Front Sloped Yes Yes

Not Fixed 2 One Bay 3 4 Front Sloped Yes Yes

On axis C between grid 1 and 2 1 One Bay 3m 4.800m Front Sloped Yes Yes

On axis C between grid 7 and 8 1 One bay 3m 4.800m Front Sloped Yes Yes

Remark

Framed Opening

Location Nos Size (m) WxH Usage Door & Jamb Type (Hot Rolled / Cold Formed)

Not Fixed 6 3X4 Motorized Rolling Shutter Hot Rolled Members

On axis C between grid 1 and 2 1 3m X 4m Motorized Rolling Shutter Hot Rolled Members

On axis C between grid 7 and 8 1 3m X 4m Motorized Rolling Shutter Hot Rolled Members

Remark

E. Mezzanine
CL Stud's Deck sheet Thick Including / Excluding
Location & Size LL (KN/Sqm) DL (KN/Sqm) Clear Height Handrails Nos of Staircase Staircase Treads Slab Thickness
(KN/Sqm) Requirement (mm) Deck

5m Top of
In Lean to shed 1 5 As per design NA Yes Only at Open side 1 Chequered Plate 0.8 125 Excluding
concrete

As per As per
Between Axis B To F and between grid 6 to 7 As per remarks 4.950m TOC NA 1 NA 0.8 150 Excluding
remarks remarks

As per As per 5m Top of


Between grid 1 to 2 and between axis B to F As per remarks NA 1 NA 0.8 150 Excluding
remarks remarks concrete
As per As per 4.4m Top of
Between grid 1 to 2 and between axis B to F As per remarks NA 1 NA 0.8 150 Excluding
remarks remarks TOC
PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

The staircase of the building is from outside of building kindly consider all the details as per given in drawing
Secondary / tertiary beams supporting equipment’s shall be permitted to be connected to primary members by welded connections at a later stage if necessary.
ii. All edge angles at periphery of deck slab shall have vertical leg up to top of proposed concrete RCC slab with proper supports at bottom to prevent sagging.
iii. Water proof Mezzanine floor whether in chequered plate or with RCC deck slab is to be provided by PEB vendor.
iv. No column-beam connection plates to project above the top of steel beam as it would hinder the laying of deck sheet or chequered plate.
v. All plate to beam connections of entire chequered plate platform should be water tight by full length welds, necessary edge angles etc
Vi) Please consider the liner sheeting as per shown in KCPL drawing
Live Load on mezzanine floors
1. AHU Mezzanine & Deck Slab =5 Kn/m2
2. Wash areas if any on deck slab area to be designed for an additional load of 200mm thick brickbat filling.
3. Note that difference in top of steel beam for normal floor and the steel beamfor sunken floor shall be 200mm. Thus after filling the sunken area and laying the floor finish over entire floor, the top of entire floor shall be at the
same
Remark Finished floor level.
Dead Loads on mezzanine floors
1. Deck slab (if indicated in the drawing)=150 thick RCC slab + Floor Finish =3.25 KN/m2
Staircase
Pan type staircases to be considered at locations indicated in tender drawings.Self-weight load of concrete and floor finish provided within the pan of the tread to be considered in design of staircase.
Concrete over pan type treads and floor
finish shall not be in PEB scope.
i) Below Points eed to consider :-econdary / tertiary beams supporting equipment’s shall be permitted to be connected to primary members by welded connections at a later stage if necessary.
ii. All edge angles at periphery of deck slab shall have vertical leg up to top of proposed concrete RCC slab with proper supports at bottom to prevent sagging.
iii. Waterproof Mezzanine floor whether in chequered plate or with RCC deck slab is to be provided by PEB vendor.
iv. No column-beam connection plates to project above the top of steel beam as it would hinder the laying of deck sheet or chequered plate.
v. All plate to beam connections of entire chequered plate platform should be watertight by full length welds, necessary edge angles, backing platesetc
As per shown in drawing railings need to consider around the stairccase

F. Crane
Top of Bracket / Walkway
Type Location Capacity (MT) Nos Span (m) Crane Run Tandem Operation Walkway Walkway Handrail Cage Ladder Crane Beam & Brackets
Hook Height (m) Width

Remark NA
PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

G. Building Add On

1. Fascia

Location Types of Fascia Height Soffit Sheeting Fascia Outer sheet Fascia inner sheet

Remark NA

2. Partition wall
Removable /
Location Length of Partition (m) Type of sheeting Single Skin / Double skin Brick wall Condition Girt Condition Insulation
Nonremovable

Remark NA

3. Ventilation Add On

Roof Monitor Ridge Vent Turbo Vent

NA NA 8 Nos (Location will finalized durinng GAD Approval )

Remark

Louvers

Location Size (m) WxH Nos Type of Louvers

Remark NA

4. Building's Natural Light System

Skylight: Others Please refer Notes 5 % of roof area

Wall Light: Others Please refer Notes 8 Nos (Location As per architectural drawing) (3m X 1m)

Remark 3mm thick polycarbonate sheet need to consider

5. Safety Life line system


Lifeline supports all around the building roof edge and on either side of ridge shall be fixed with suitable water tightening
Type of Life line : MT & T Location :
arrangements. Safety Wire ropes are to be considered.

Remark

6. Cage Ladder
For Main Shed For High bay to low bay For Lean To For Crane Walkway Any other location

2 cage ladder for roof access along with mid-landing

Remark

H. Design Data

Design Code Roof Live Load (KN/Sqm) Roof Dead Load (KN/Sqm) Wind Velocity m/sec Seismic Zone Rain fall Intensity Deflection Criteria

44 m/s (3 sec Gust)-


IS 800 2007 Without Chapter 12 0.75 As per Design III 100 As per tender
Exposure category B

Frame & Secondary

Main Column Base Condition: Fixed/Pinned Minimum Thickness for Primary (mm) 4

Wind column Base Condition: Fixed/Pinned Minimum Thickness for Crane Beam (mm) As per design

Mezzanine Columns Base Condition: Fixed/Pinned Minimum Thickness for Secondary (mm) 1.5

Primary Material grades : 345 Mpa Secondary Finish Coating 275 GSM

Additional Loads

Solar Load on Roof Kn/sqm Collateral Load on Roof kg/Sqm Collateral Load on Purlin kg/Sqm Collateral Load on column Kg Any Other Load (Kg/Sqm) Any Other Load (Kg/Sqm)

As applicable as per local codes and


Cable tray - 0.20 KN/m2 Cable tray - 0.20KN/m2
0.2 geometry of the building. Diff in temp =
Sprinkler - 0.20 Kn/m2 Sprinkler - 0.20 Kn/m2
15deg

Pipe Rack / Cable tray


One side / two Side of
Location Height from FFL (m) bracket Projection (mm) Load on Bracket (kg/m) Supporting Structure Required Type of supporting structure (HR / Cold Form)
Column

Remark NA

Version -03, Date : 18-05-2022


PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

A. General Data

DFQ NO : 201-2218 Name of Client : Neogen Chemicals Ltd.

Name of Sales Person : Yogesh Gaikar Job Site & District: Pakhajan, Bharuch.

Sales office : Mumbai West I Name of Consultant : Knexir Consultants

Date of DFQ : 21.06.2024 Revision No R4 Date Of Revision : 2/12/2024 Building : A1 of A

B. Building Description

Name Of building: Warehouse 3 Frame Type: Clear Span

Building Parameters Main Building Lean To Shed - 1 Lean To Shed - 2

Length (m) 54m C/C

Width (m) 42m C/C

Clear Height (m) 11.900m

Bottom of base plate shall be 500mm below finished floor level of respective floor. Anchor bolt- Black
Base Plate Bottom With reference to FFL
(un-painted)

Roof Slope 1:20

Bay Spacing 9 @ 6m C/C

End wall Column Spacing 6 @ 7m C/C

Internal Column Nos & spacing As per Drawing

Jack Beam Requirement NA

Future expansion Along Grid 10 (Same Size Shed)

Roof Extensions NA

Brick wall Condition : Front Side wall 3.150m Brick wall and above sheeting

Brick wall Condition : Back Side wall 3.150m Brick wall and above sheeting

Brick wall Condition : Left End wall 3.150m Brick wall and above sheeting On grid 1 brick wall height 1m and above sheeting

Brick wall Condition : Right End wall 3.150m Brick wall and above sheeting on grid 10 brick wall height 1m and aboce sheeting

Bracings
At Peripheral Column Portal+Rod Bracings
Wall Bracing
At Internal Column Portal+Rod Bracings

Roof Bracing Diagonal Rod Braccings

Remark

C. Sheeting & Gutter Down takes

Sheeting Specifications Insulation Mesh For Insulation

26 gauge Standing Seam Galvalume sheet


(0.55 TCT) with yield strength of 345 MPA.
Roof Sheeting
Top Sheet: External Face: color-coated
and Internal Face: high
26-gauge Baretensile
Galvalume/ precoated
profiled galvalume
Galvalume
sheet (0.55 TCT) with yield strength of 345 MPA.
Wall Sheeting NA NA NA NA NA
Exterior sheet: External face: Pre-coated Galvalume
26-gauge
Interior high
face: tensile
Bare profiled /Galvalume
Galvalume Precoated
sheet (0.55 TCT) with yield strength of 345 MPA.
Roof Liner Sheeting Sub purlin Required : Yes Sub purlin Fixing Arrangement: Inside main Girt
Exterior sheet: External face: Pre-coated Galvalume
Interior face: Bare Galvalume / Precoated
Wall liner needs provided only the area shown below the mezzanine
Wall Liner Sheeting Sub girt
1. PVC caps Required:
to match Yes roofing system to be
Roof sheet color. Water tight Sub Girt Fixing Arrangement:
ensured. Inside main Girt
as per drawing
1) Insulation and Liner sheet to be provided at locations indicated in the tender drawings.
2) Liner sheets where-ever indicated inside the warehouses shall be provided above purlins.
Remark 3) Liner sheets where-ever indicated below canopies shall be provided below purlins to conceal the purlins.
4) Junction of liner sheet with brick walls shall be suitably closed using soffit sheets
Gutter
5) Consider & Downspouts
the side wall sheeting between grid 7 to 8 from axis B to E upto 0.850m height
Down-take pipes to be of same material
as that of the side cladding ie 26-gauge GI
Main Building Gutter : Galvalume Main Building Downspout : Material and of Rectangle in shape. ( Pipes to be provided with
bends at end to terminate
in manholes 1500 mm )
Canopy Gutter Yes Canopy Down take Yes

Remark 1. Pipes to be provided with bends at end to terminate in manholes 1500 mm below FGL (Finish Ground Level). If necessary, at certain locations RWP to be left above the adjacent roof.

D .Canopy & Framed Opening

Canopy

Location Nos Length (m) Width (m) Clear Height (m) Type of Canopy Soffit Required ? Gutter & Down take

Not Fixed 1 One Bay 3 4 Front Sloped Yes Yes

Not Fixed 1 One Bay 3 4 Front Sloped Yes Yes

Remark

Framed Opening

Location Nos Size (m) WxH Usage Door & Jamb Type (Hot Rolled / Cold Formed)

Not Fixed 7 3X4 Motorized Rolling Shutter Hot Rolled Members

Remark

E. Mezzanine
CL Stud's Deck sheet Thick Including / Excluding
Location & Size LL (KN/Sqm) DL (KN/Sqm) Clear Height Handrails Nos of Staircase Staircase Treads Slab Thickness
(KN/Sqm) Requirement (mm) Deck

5m Top of
In Lean to shed 1 5 As per design NA Yes Only at Open side 1 Chequered Plate 0.8 125 Excluding
concrete

As per As per
Between Axis B To F and between grid 9 to 10 As per remarks 4.950m TOC NA 1 NA 0.8 150 Excluding
remarks remarks

As per As per 5m Top of


Between grid 1 to 2 and between axis B to F As per remarks NA 1 NA 0.8 150 Excluding
remarks remarks concrete

As per As per 5m Top of


Between Grid 5 to 7 and axis B to F As per remarks NA 1 NA 0.8 150 Excluding
remarks remarks concrete
PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

The staircase of the building is from outside of building kindly consider all the details as per given in drawing
Secondary / tertiary beams supporting equipment’s shall be permitted to be connected to primary members by welded connections at a later stage if necessary.
ii. All edge angles at periphery of deck slab shall have vertical leg up to top of proposed concrete RCC slab with proper supports at bottom to prevent sagging.
iii. Water proof Mezzanine floor whether in chequered plate or with RCC deck slab is to be provided by PEB vendor.
iv. No column-beam connection plates to project above the top of steel beam as it would hinder the laying of deck sheet or chequered plate.
v. All plate to beam connections of entire chequered plate platform should be water tight by full length welds, necessary edge angles etc
Vi) Please consider the liner sheeting as per shown in KCPL drawing
Live Load on mezzanine floors
1. AHU Mezzanine & Deck Slab =5 Kn/m2
2. Wash areas if any on deck slab area to be designed for an additional load of 200mm thick brickbat filling.
3. Note that difference in top of steel beam for normal floor and the steel beamfor sunken floor shall be 200mm. Thus after filling the sunken area and laying the floor finish over entire floor, the top of entire floor shall be at the
same
Remark Finished floor level.
Dead Loads on mezzanine floors
1. Deck slab (if indicated in the drawing)=150 thick RCC slab + Floor Finish =3.25 KN/m2
Staircase
Pan type staircases to be considered at locations indicated in tender drawings.Self-weight load of concrete and floor finish provided within the pan of the tread to be considered in design of staircase.
Concrete over pan type treads and floor
finish shall not be in PEB scope.
i) Below Points eed to consider :-econdary / tertiary beams supporting equipment’s shall be permitted to be connected to primary members by welded connections at a later stage if necessary.
ii. All edge angles at periphery of deck slab shall have vertical leg up to top of proposed concrete RCC slab with proper supports at bottom to prevent sagging.
iii. Waterproof Mezzanine floor whether in chequered plate or with RCC deck slab is to be provided by PEB vendor.
iv. No column-beam connection plates to project above the top of steel beam as it would hinder the laying of deck sheet or chequered plate.
v. All plate to beam connections of entire chequered plate platform should be watertight by full length welds, necessary edge angles, backing platesetc
As per shown in drawing railings need to consider around the stairccase

F. Crane
Top of Bracket / Walkway
Type Location Capacity (MT) Nos Span (m) Crane Run Tandem Operation Walkway Walkway Handrail Cage Ladder Crane Beam & Brackets
Hook Height (m) Width

Remark NA
PHENIX CONSTRUCTION TECHNOLOGY F / MKT / 01

Data For Quote

G. Building Add On

1. Fascia

Location Types of Fascia Height Soffit Sheeting Fascia Outer sheet Fascia inner sheet

Remark NA

2. Partition wall
Removable /
Location Length of Partition (m) Type of sheeting Single Skin / Double skin Brick wall Condition Girt Condition Insulation
Nonremovable

Remark NA

3. Ventilation Add On

Roof Monitor Ridge Vent Turbo Vent

NA NA 10 Nos

Remark

Louvers

Location Size (m) WxH Nos Type of Louvers

Remark NA

4. Building's Natural Light System

Skylight: Others Please refer Notes 5% of roof area

Wall Light: Others Please refer Notes 10 Nos (Location as per drawing)

Remark 3mm thick polycarbonate sheet need to consider

5. Safety Life line system


Lifeline supports all around the building roof edge and on either side of ridge shall be fixed with suitable water tightening
Type of Life line : MT & T Location :
arrangements. Safety Wire ropes are to be considered.

Remark

6. Cage Ladder
For Main Shed For High bay to low bay For Lean To For Crane Walkway Any other location

2 cage ladder for roof access along with mid-landing (0 to 15m


height)

Remark

H. Design Data

Design Code Roof Live Load (KN/Sqm) Roof Dead Load (KN/Sqm) Wind Velocity m/sec Seismic Zone Rain fall Intensity Deflection Criteria

44 m/s (3 sec Gust)-


IS 800 2007 Without Chapter 12 0.75 As per Design III 100 As per tender
Exposure category B

Frame & Secondary

Main Column Base Condition: Fixed/Pinned Minimum Thickness for Primary (mm) 4

Wind column Base Condition: Fixed/Pinned Minimum Thickness for Crane Beam (mm) As per design

Mezzanine Columns Base Condition: Fixed/Pinned Minimum Thickness for Secondary (mm) 1.5

Primary Material grades : 345 Mpa Secondary Finish Coating 275 GSM

Additional Loads

Solar Load on Roof Kn/sqm Collateral Load on Roof kg/Sqm Collateral Load on Purlin kg/Sqm Collateral Load on column Kg Any Other Load (Kg/Sqm) Any Other Load (Kg/Sqm)

As applicable as per local codes and


Cable tray - 0.20 KN/m2 Cable tray - 0.20KN/m2
0.2 geometry of the building. Diff in temp =
Sprinkler - 0.20 Kn/m2 Sprinkler - 0.20 Kn/m2
15deg

Pipe Rack / Cable tray


One side / two Side of
Location Height from FFL (m) bracket Projection (mm) Load on Bracket (kg/m) Supporting Structure Required Type of supporting structure (HR / Cold Form)
Column

Remark NA

Version -03, Date : 18-05-2022


PHENIX CONSTRUCTION TECHNOLOGY

Data For Quote


Sr. No Notes
1 Consider 50mm Gap between baseplate and inner face of brick wall.

2 Holes shall be provided in purlins as per attached drawing for connection of utilities like ducts, light fixtures, sprinklers etc. as per attached drawing.

3 Holes and/or cleats shall be provided in rafters as per attached drawing for connection of utilities like ducts, light fixtures, sprinklers, firewater headers etc. as per attached drawing.

All cutouts for pipe racks, cable trays, louvers, shafts, turboventilators, exhaust pipes / ducts etc. shall be completely sealed with framing members and required flashing after the scheme is approved for aesthetics and water
4
tightness. A canopy over external cutouts to be provided as per working details furnished.

5 Only transparent sealants shall be used if required at any location in this project.

6 Fixing and erection of Lightening arrestor supplied by the client shall be in PEB scope.

7 All cleats provided to Purlins / rafters shall have provision of suspending accessories / utilities using bolted connections using minimum M12 bolts and not be self-driven screws or self-taping screws.

Column sections Tapered sections are allowed.Minimum thickness of web and flange shall be 6 mmSplices for column section to be avoided, where unavoidable should be equal to maximum shipping lengths preferably above
8
the false-ceiling levels and at pre-approved locations

9 For wind load Internal pressure coefficients as per IS codes 875 Part-III 2015

The eathquake load :-


As per relevant code IS 1893 Part-IV 2015. Also Consider:
i) Zone III
10
ii) Importance factor -1.0
iii) OMRF without concentric braces
iv) Soil type – III

11 structural Steability Guaranteed for Twenty years from the date of completion of the building including any failure in structural members including structural safety and adequacy of all members as per relevant IS codes.

12 Please consider the downspouts till FGL and till drainigae line as per shown in drawing.

13 Dead load of walkable false ceiling shall be 0.5KN/sqm

i. On Metal Sheet Roof area = 0.75 kN/SQM.


ii. On walkable false ceiling = 0.75 kN/SQM.

If deck slab indicated in the drawing, then following loads are applicable
14
iii. AHU Mezzanine & Deck Slab =5 Kn/m2
iv. Wash areas if any on deck slab area to be designed for an additional load of 200mm thick brickbat filling.
iv. Note that difference in top of steel beam for normal floor and the steel beam for sunken floor shall be 200mm. Thus after filling the sunken area and laying the floor finish over entire floor, the top of entire floor shall be at the
same Finished floor level

1. Actual weight of the structure


2. Wall cladding to be considered as per arch drg.
3. Deck slab (if indicated in the drawing)=150 thick RCC slab +
15 Floor Finish =3.25 Kn/m2
4. Load of 2 KN/sqm to be considered if glazing is indicated in building elevation drg
5. Wall loads if any to be considered at location as indicated in Arch Drgs
6. Dead load of walkable false ceiling shall be 0.5KN/sqm

a) IF HVLS fans are to be provided, load of 200kg to be considered on I beam required to support each fan at locations indicated on the architectural drawings. These I beams shall be provided by PEB vendor. Final fixing details
shall be shared at the time of design finalization.
b) If indicated on Arch drgs, 2 m wide pipe rack of 2 tier with total load of 1.5t/m to be considered suspended below rafter. Piperack routing shall be as indicated in Arch drawing.
c) Please refer drawings for location and extents of pipe rack.
16
d) Walk-on or Non-walk- able FC (whichever applicable) - load to be suspended from a separate framing system other than the roof rafter on areas where walk-on / non- walk-able false ceiling are marked on tender drawings.
e) Pipe rack members shall not be in PEB scope; however only loads on PEB structure to be considered along with the provision of suitable welded connection details.
f) Rafter to rafter additional beams to be provided along the length of the pipe rack to suspend the pipe rack suspenders at regular intervals if center to center distance between the rafters exceeds 6m.
g) Turbo Support at purlin level shall be in PEB vendors scope.

17 Staircase and handrails up to plinth level will be in civil scope. Staircases to access first floors or mezzanine floors is in PEB scope.

18 brick wall is only 1m high, hence all framed openings for doors and rolling shutters shall be in PEB scope.

19 Warehouse – 02-office area at first floor and warehouse – 04-office area at first floor as shown in section drawing, please consider walkable false ceiling.

20 Please consider the liner sheeting as per KCPL drawing in selctive areas of mezzanine.

21 In warehouse 1 Please note that we need to extended RCC slab 300mm O/S of sheetinng line as per showing in drawing.

3D - STAAD ANALYSIS OF BUILDING IS TO BE SUBMITTED ALONG WITH THE TECHNICAL


PROPOSAL FOR TWO CONDITIONS
22
A) PRESENT PHASE OF CONSTRUCTION
B) PRESENT + FUTURE PHASE OF CONSTRUCTION

23 In warehouse 3 false ceiling is cominng on 1st floor level between gird 5 to 7 consider ladong and supporting structure for same

24 Please follow the curb wall details at junction of deck slab as per given in client drawing
Cross bracings are permitted in roof. Cross bracings as vertical bracings are permitted only at pre-approved locations. If necessary, then portal bracings to be provided.Location of bracing to be marked on drg. by PEB
25
vendor. No section bracing allowed in front of Rolling shutters.
26 2 Nos. of Cage ladder per ware house with minimum 750 mm wide including its associated intermediate platforms / safety cages going up to corresponding roof levels to be provided.

27 Guaranteed for Twenty-Five years from the date of completion of the building including any failure in structural members including structural safety and adequacy of all members as per relevant IS codes.

21 Main ware house buildings will have 3m brick wall and cladding above, outside areas like staging , docking, loading, un-loadings shall be 1m wall and cladding above.

22 Alll the supproting Strucuture of the false ceiling is in phenix scope of work and location are as per architecturl drawings.

23 Please mentioned all the staircase locations on proposal drawings

Special Notes & Buyouts

Post order details to be filled


1

DFT per Coat


Type of Content Type of Coat Nos of Coat DFT Total (Microns) Application At
(Microns)

Primer Red Oxide zinc phospate 2 35 Shop


3 Paint
140 Shop

Finish Epoxy CR Enamel 2 35 1 at Shop & 1 at site


PHENIX CONSTRUCTION TECHNOLOGIES F / MKT / 01

PAGE: 3 OF 3
REVISION SHEET
SALES DESIGNER
REVISION TONNAGE
SNO DATE NUMBER REASON FOR REVISION REMARKS FROM DESIGNER DIFFERENCE

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29
Request for information (RFI)
NOTE : Highlight the Latest Answers.
DATE
REV

SNo QUERIES

SAMPLE :
DATE 2/22/2022
REV 0

Attached
SNo QUERIES /REPLY
file
1 There is a mismatch of Data about min Thickness of purlin between DFW and YES
Technical Spec. Please Clarify.
Please Follow Technical Spec and Maintain 2mm Thick Purlin.

PLEASE ADD ONE MORE COLUMN AS MENTIONED