electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
JULY 2024
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
PREPARED FOR
Habibganj, Bhopal-462024,
i
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
PREPARED BY
PROJECT NAME Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical
Investigation in connection with Construction of electrified new BG railway
line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West
Central Railway and Western Railway in Madhya Pradesh State, India.
Rishi Sharma
R1 29th July 2024 Second issue Pooja Swami Piyush Isasare Halit Bakirci
Rishi Sharma
ii
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
Table of Contents
1 Introduction .................................................................................................. 0
1.1 General .................................................................................................. 0
1.2 Geotechnical data and references .................................................................. 0
1.3 Clarifications and Qualifications ..................................................................... 1
1.4 Additional Investigations .............................................................................. 1
1.5 Project Outline ......................................................................................... 1
1.6 Summary of key project features .................................................................... 3
1.6.1 Tunnel-1 ........................................................................................... 3
1.6.2 Tunnel-2 ........................................................................................... 3
1.7 Scope of this report ................................................................................... 3
2 Source of Geological and Geotechnical Information .................................................... 3
3 Project Geological Setting .................................................................................. 3
3.1 Physiographic Conditions ............................................................................. 3
3.1.1 Malwa Plateau .................................................................................... 4
3.1.2 Rewa Panna Plateau ............................................................................. 4
3.2 Regional Geology ....................................................................................... 4
3.3 Tectonic Setup ......................................................................................... 6
3.3.1 Tectonic Divisions ................................................................................ 6
3.3.2 Tectonic Evolution ............................................................................... 6
3.4 Local Geology........................................................................................... 7
3.4.1 Slope wash Material/Colluvium Material ..................................................... 7
3.4.2 Black Soil .......................................................................................... 8
3.4.3 Basalt .............................................................................................. 9
3.4.4 Red Bole ........................................................................................... 9
3.5 Geological Structures .................................................................................. 9
3.5.1 Joint ............................................................................................... 9
3.5.2 Flow Banding/Lava Flow Direction .......................................................... 11
3.5.3 Spheroidal Weathering ........................................................................ 12
3.5.4 Vesicular/ Amygdaloidal ...................................................................... 12
3.5.5 Lithological Contact ........................................................................... 13
3.5.6 Chimney Formation ............................................................................ 13
3.6 Groundwater and hydrogeology .................................................................... 14
3.7 Natural Gases and Geothermal Conditions ....................................................... 17
3.8 Previous Railway Tunneling and Construction Experience ..................................... 18
3.9 Seismicity ............................................................................................. 18
3.10 Site Investigation and Laboratory Testing ..................................................... 19
3.10.1 Geological Mapping ............................................................................ 19
3.10.2 Geophysical exploration ...................................................................... 20
3.10.3 Exploratory Drilling ............................................................................ 20
iii
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
3.10.4 Laboratory Tests ............................................................................... 27
3.10.5 In-situ Test ...................................................................................... 32
3.10.6 Surface Development, Topographical and Environmental Conditions affecting Project
Layout 33
4 Overview of the available topographical and Geological / geotechnical data .................... 33
4.1 Topographical survey ................................................................................ 33
4.2 Hydrological survey .................................................................................. 33
4.3 Geology and geotechnical evaluation along Project alignment ............................... 33
4.3.1 Geology and geotechnical evaluation along Tunnel 1 .................................... 33
4.3.2 Geology and geotechnical evaluation along Tunnel 2 .................................... 36
5 Ground Characterization .................................................................................. 41
5.1 Physical characteristics and occurrences of geological units .................................. 41
5.2 Ground Type (GT) .................................................................................... 41
6 Design Consideration ...................................................................................... 43
6.1 Basis of Tunnel Design ............................................................................... 43
6.2 Rock Mass Classification............................................................................. 44
6.2.1 Geo-Mechanical Classification (RMR) ........................................................ 44
6.2.2 Austrian Code (ONORM 2203) ................................................................. 45
6.3 Rock Mass Type ....................................................................................... 46
6.3.1 Rock Mass Type 1 (RMT-1) .................................................................... 46
6.3.2 Rock Mass Type 2 (RMT-2) .................................................................... 47
6.3.3 Rock Mass Type 3 (RMT-3) .................................................................... 47
6.3.4 Rock Mass Type 4 (RMT-4) .................................................................... 47
6.4 Rock Support Requirements ........................................................................ 47
6.5 Excavation Methods and Relevant Sequences .................................................... 48
6.6 Final Lining ........................................................................................... 49
6.7 Instrumentation ...................................................................................... 49
7 Setting up Baseline for the Project ..................................................................... 49
7.1 Rock Mass Rating ..................................................................................... 49
7.2 Laboratory and Field Test Results ................................................................. 50
7.3 In-situ Field Test Results ............................................................................ 50
7.3.1 Standard Penetration Test (SPT) ............................................................. 50
7.3.2 Permeability Test .............................................................................. 50
7.3.3 Groundwater Condition ....................................................................... 54
7.4 Low Cover Areas ..................................................................................... 54
8 Geotechnical Risks and Potential Hazards Identification ............................................ 55
iv
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
Table of Figures
List of Tables
vi
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
1 Introduction
1.1 General
Ministry of Railways, Government of India has entrusted Rail Vikas Nigam Ltd (RVNL), a PSU
under Ministry of Railway, with the responsibility of execution of 198 kms long single line
electrified new BG Mangliyagaon (Indore) - Budni Rail Line infrastructure project, under
jurisdiction of West Central Railway and Western Railway to be financed by Govt. of India,
in the state of Madhya Pradesh. RVNL is the Implementing Agency (IA) of the project and
has been vested with the responsibility of implementing Mangliyagaon (Indore)-Budni New
BG Railway Line Project passing through the State of Madhya Pradesh.
RVNL, hereafter referred as "Client", has entrusted "M/S Turkish Engineering consulting and
contracting - TUMAS India Pvt. Ltd. in JV with M/S Erkaas India Pvt. Ltd." to render
consultancy services for “Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of electrified new BG railway
line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway
and Western Railway in Madhya Pradesh State, India. " This geotechnical Baseline Report is
submitted towards fulfillment of one of the deliverables in the agreement.
This Geotechnical Baseline Report (GBR) for Bidding has been prepared for Construction of
Tunnel T1 From Chainage Km 33+160 To Km 34+400 And Tunnel 2 From Chainage Km 57+400
To Km 66+040 With Ballast Less Track And Works Related to Formation On Approaches of
Such Tunnels In Connection With Construction of Electrified New BG Railway Line Between
Mangliyagaon (Indore) to Budni Stations (198 Kms) of Ratlam Division And Bhopal Division Of
Western Railway And West Central Railway respectively in Madhya Pradesh State, India. The
GBR provides a basis for developing bids and is a single-source document of statements
describing expected geological and geotechnical conditions applicable to the tunnel Project.
Within this framework, the GBR is intended to:
• Provide a description of the geological and geotechnical conditions along the alignments
of the Tunnels as interpreted from the available information contained in Bid document
and the ground investigations performed during the planning of the project and
• Assist prospective Contractors in the evaluation of the geological and geotechnical
conditions.
The baselines presented in this GBR are applicable to the tunnel as specified in the Owner’s
Requirements and do not apply to other permanent or temporary surface or underground
excavations that the Contractor may perform for his convenience (e.g., construction camp
facilities, access roads, haul roads, mucking bays, site grading, quarries, or borrow areas).
This GBR is prepared in general accordance with the ASCE suggested guidelines1.
1
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
The major components of the project included under the scope of services of the consultant
as per TOR are listed below. The lengths and chainages mentioned are tentative and may
change slightly depending upon the actual design and project requirements.
2
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
1.6 Summary of key project features
1.6.1 Tunnel-1
Tunnel-1 is a 1.24Km long single-track tunnel starting from chainage 33+160 Km to chainage
34+400Km. The horizontal alignment is straight for complete length of the tunnel.
1.6.2 Tunnel-2
Tunnel-2 is an 8.64Km long single-track tunnel starting from 57+400 Km to 66+040Km. The
proposed tunnel -2 passes through agricultural land for a length of 4.2 Km and the remaining
part is in hilly terrain.
1.7 Scope of this report
This report provides a general overview of the Project layout and geology. All the project
descriptions are based on geological and geotechnical interpretations.
For the preparation of Geotechnical Baseline Report (GBR) for the mentioned project, the
following geological and geotechnical data, references, IS codes, publications and manuals
have been used.
This section presents the regional geology of the project area and the local geology observed
at the tunnel portal areas and along the tunnels. Detailed geological and geotechnical
appreciation shall be presented in the Geotechnical baseline report.
3
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
Apart from the valleys of the Narmada and the Tapti, the area of Madhya Pradesh has a
plateau region in between the mountains of the Vindhya and the Satpura ranges.
The Project area lies in Ratapani Wildlife Sanctuary of Sehore district. Out of this district
85% of the area is occupied by Deccan trap, about 10% by alluvium and about 5% of the area
by Vindhyan formations. The general geological succession of project area is given in table
3-1.
4
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
TABLE 3-1 GENERAL GEOLOGICAL SUCCESSION OF MP
Diamondiferous kimberlites of
panna distt., limestone
deposits of mandsaur, rewa,
900 to 1800 Kaimur Group, Semri
Proterozoic satna disit. Lead-zinc deposits
M.Y. Group
of damoh distt
Pyrophyllite-Diaspore of
Sakoli Group
Archaean to Proterozoic Tikamgarh, Chhatarpur distt.,
Bundelkhand granite
-I Granite for cutting / polishing
Amgaon Group
Older than 2500 peninsular gneisses,
M. Y older granites and
Archaean
Migmatites
5
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
The tunnel alignment passing through the geological features of the Malwa Plateau and Rewa
Panna Plateau.
3.3 Tectonic Setup
Geologically, Indore is part of the Deccan trap, which is made principally of volcanic rocks
of basaltic composition, which is characterized by amygdular & vesicular structures. About
60 Kms away from Indore, river Narmada flows in a rift zone flanked with faults, folds and
fractures.
3.3.1 Tectonic Divisions
The area under Indore has relevance to the following tectonic set-up:
An extensive area in the west central part of India covered by thick volcanic effusives shows
regional negative enomally. It seems to represent a major negative platform structure with
appreciale thickness of Cuddapah, Vindhyan, Gondawana and mesozoic sequences are
present suggesting that some of the sequences may show a basin ward increase in thickness
below the traps.
3.3.2 Tectonic Evolution
The area under study is influenced by the evolution of Vindhyan sequence and igneous
activity represented by the Deccan trap flows.
Extensive areas of the Indian platform underwent subsidence either overlies unconformably
the Cuddapah or rests directly on the basement. The Cuddapah and the Vindhyan sequences
wherever they occur together are separated by a period intensive tectonic activity resulting
in a major change in the pre-existing structural pattern. The Vindhyan is much less
disturbed, practically devoid of metamorphism with less frequent basic intrusives. The
sequence shows extensive development to the north of Narmada fault zone in the Vindhyan
synclise. The Vindhyans are considered to range in age from proterozoic to lower paleozoic.
The Vindhyans represent stable shelf sediments in the outcrop areas changing to red
sandstones towards the top-most part. The Indian platform after the close of Vindhyan
sedimentation experienced position movement and remained uplifted within end of middle
carboniferous.
A significant point in the evolution of Indian platform is marked by the very wide-spread
igneous 390 activity represented by the Deccan trap lava flows covering an extensive area
of the platform mostly conferred to the central & western India. The area under study is
situated in this region. These represents Plateau Basalts with alternating inter-trappean
sediments. The Deccan traps range from upper Cretaceous to Lower Eocene though they are
confined to Meso-Cenozoic transition period. In some cases, these have attained a thickness
over 2000 meters. The evolution of the Deccan syncline was completed with this event.
(ONGC 68).
6
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
7
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
8
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
3.4.3 Basalt
Based on geological surface mapping and borehole data. The strong to very strong, jointed,
reddish-brown color fine grained, basalt has been observed. This reddish-brown color is due
to oxidation of iron-bearing minerals. These basaltic deposits exhibit a spectrum of
weathering states, ranging from highly weathered near the surface to relatively fresh at
greater depths within the tunnel. This weathering process results in significant mineralogical
changes, with primary minerals like plagioclase and pyroxene altering to secondary minerals
such as clay and iron oxides. These features are indicative of prolonged exposure to
weathering processes.
9
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
TABLE 3-2 DETAIL OF DISCONTINUITIES
10
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
11
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
• The Malwa Plateau, on which the project area is situated, slopes gently
towards the north and east, suggesting that the lava flowed accordingly.
• The layering of basalt flows, with inter-trappean beds (sedimentary layers
between basalt flows-red bole), provides further clues about the sequence
and direction of eruptions.
• The flow generally has a gentle dip, typically around 5°-10°, indicating a
near-horizontal alignment.
3.5.3 Spheroidal Weathering
Spheroidal weathering is a type of chemical weathering that creates rounded boulders and
helps to create domed monoliths involving concentric or spherical layers of highly decayed
rock within weathered bedrock. The spheroidal weathering structures have been observed
near Portal-2 of Tunnel-1 and in the depression area of Tunnel-2. Figure 3-7 shows
spheroidal weathering.
12
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
13
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
The chimney formation is considered as an incidence of heavy rockfall, or debris flow
condition associated with heavy flow of water, disrupting further tunneling work, despite
taking due precautions in the poor to very poor rock mass conditions especially in low rock
cover locations. The bidder is required to include the cost for such occurrences in his bid.
3.6 Groundwater and hydrogeology
The groundwater conditions interpretations are based on the drainage pattern, water tables
in the drillholes and permeability tests data. The detailed test results are present in GDR.
The depth of ground water tables obtained in the boreholes are given in table 3-3 & table
3-4:
TABLE 3-3 DETAILS OF WATER TABLE IN TUNNEL-1
Tunnel-1
Borehole No. Chainage (Km) Borehole Depth (m) Water Table Depth (m)
T1-BH 01 32611 17 14.9
T1-BH 02 32660 19 12.8
T1-BH 03 32710 20 11.6
T1-BH 04 32760 20 11.3
T1-BH 05 32810 20 11.2
T1-BH 06 32860 19 11.3
T1-BH 07 32910 19 11.1
T1-BH 08 32960 19 14.9
T1-BH 09 33010 20 12.8
T1-BH 10 33060 21 11.6
T1-BH 11 33110 22 2.7
T1-BH 12 33160 23 3.3
T1-BH 13 33160 23 3.2
T1-BH 14 33160 23 4.0
T1-BH 15 33260 24 4.1
T1-BH 16 33360 26 3.1
T1-BH 17 33460 30 5.4
T1-BH 18 33560 31 3.5
T1-BH 19 33660 43 9.0
T1-BH 20 33760 46 17.2
T1-BH 21 33860 47 18.1
T1-BH 22 33960 47 8.5
T1-BH 23 34000 35 8.2
T1-BH 24 34160 29 6.2
T1-BH 25 34260 26 7.2
T1-BH 26 34400 28 7.9
T1-BH 27 34400 22 8.4
T1-BH 28 34400 22 8.9
T1-BH 29 34476 23 7.5
T1-BH 30 34526 14 2.5
T1-BH 31 34576 12 2.1
T1-BH 32 34626 11 1.9
T1-BH 33 34760 11 7.1
14
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
15
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
BHM-34 63450 122 7.58
BHM-35 63600 150 24.3
BHM-36 63750 147 22.1
BHM-37 63900 159 32.4
BHM-38 64050 159 25.4
T2-BH 99 64100 155 21.25
T2-BH 100 64200 143 21.25
T2-BH 101 64300 134 23.75
BHM-40 64350 118 3.9
T2-BH 102 64400 112 5.45
BHM-41 64500 116 24.64
T2-BH 104 64600 87 11.15
T2-BH 105 64700 107 33.25
BHM-42 64800 130 21.5
BHM-43 64950 137 41.5
T2-BH 109 65100 137 38.6
T2-BH 110 65200 119 25.25
T2-BH 111 65300 95 35.5
T2-BH 112 65400 64 10.1
T2-BH 113 65500 39 17.1
BHM-45 65550 32 11.3
T2-BH 114 65600 28 4.1
T2-BH 115 65700 20 1.65
T2-BH 116 65800 45 12.8
BHM-46 65850 41 25.3
T2-BH 117 65900 37 7
BHM-47 66000 28 7.75
T2-BH 118 66040 20 2.5
T2-BH 119 66040 19 2.75
T2-BH 120 66040 17 3.7
T2-BH 121 66090 20 4.4
T2-BH 122 66140 17 2.95
T2-BH 123 66190 16 3.25
T2-BH 124 66240 18 3.65
T2-BH 125 66290 20 4.35
T2-BH 126 66340 19 5.25
Escape Tunnel
BHE-01 57800 25 5.3
BHE-02 58245 26 6.8
BHE-03 58575 31 12.15
BHE-04 58725 33 5.3
BHE-05 58875 35 12.1
BHE-06 59025 36 11.1
BHE-07 59175 38 9.35
BHE-08 59325 40 10.15
BHE-09 59475 42 12.10
BHE-10 59625 42 12.80
BHE-11 59775 42 13.2
BHE-12 59925 41 11.8
BHE-13 60075 44 5.9
BHE-14 60225 46 6.2
BHE-15 60375 48 5.8
BHE-16 60525 49 6.9
BHE-17 60675 51 13.3
BHE-18 60825 54 12.25
BHE-19 60975 56 12.35
BHE-20 61125 59 12.3
BHE-21 61275 62 12.3
16
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
BHE-22 61425 68 2.1
BHE-23 61575 70 13.5
BHE-24 61725 98 27.7
BHE-25 62175 101 17.15
BHE-26 62325 124 23.75
BHE-27 62475 146 In progress
BHE-28 62625 155 16.65
BHE-29 62775 170 36
BHE-30 62925 173 38
BHE-31 63075 159 30.20
BHE-32 63225 147 In progress
BHE-33 63375 139 In progress
BHE-34 63525 135 In progress
BHE-35 63675 140 In progress
BHE-36 63825 155 27.2
BHE-37 63975 158 20.18
BHE-38 64425 112 16.35
BHE-39 64875 136 27.5
BHE-40 65025 137 36.3
17
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
3.8 Previous Railway Tunneling and Construction Experience
The previous railway tunneling projects have been constructed in Budni-Barkhera area. The
drill and blast method (DBM) shall be adopted for excavation of all underground works,
portal works and foundations. Mechanical excavation may be required in low cover zones,
especially at nallah and national highway crossings.
3.9 Seismicity
As per IS 1893: 2002, the area lies in Seismic Zone III. The Seismic risk Map of Madhya
Pradesh, showing the study area in SEISMIC ZONE III, Moderate damage corresponding to
intensity VII of MM scale (MM = Modified Mercalli Intensity Scale).
In the recent past, a couple of events triggered the entire state (including the 1997 Jabalpur
Earthquake). After that, the earthquake is being taken quite seriously here. However, as
per Vulnerability Atlas of India 2007, there are 28 districts come under Zone III, as per IS
1893: 2002, and the Horizontal Ground Acceleration (amax) = 0.16 and 22 districts come
under Zone II, as per IS 1893: 2002, and the Horizontal Ground Acceleration (amax) = 0.10,
of earthquake. In addition to it, a state level Madhya Pradesh Earthquake Study has been
carried out just recently. The study has emphasized the need of the revision of seismic
zoning map of the state. And as per the recent categorization, some of the districts have
been categorized under high seismic zone IV (earthquake prone high-risk zone), and rest of
those have been covered under zone III and zone II. Hence on the basis of the Vulnerability
Atlas of India, and recently carried out MP Earthquake Study, the districts have been
categorized into the High, Medium and Low hazard prone. In the district wise hazard analysis
table, earthquake hazard has been categorized into the following.
• High earthquake prone districts are those, which are proposed for Zone IV, by
MP Earthquake study.
• Medium earthquake prone districts are those, which come under the moderately
high-risk Zone III
•
Low earthquake prone districts are those, which come under Low damage risk
Zone II
The presence of a single tectonic plate in Deccan along with strong rocks beneath, the earth
surface makes the Deccan plateau stable. It is very low prone to any tectonic activities. The
seismic zoning map is shown in figure 3-13.
18
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
FIGURE 3-14 SEISMIC ZONE MAP OF INDIA, 1966 (IS 1893: 1962, REVISED IN 1966)
19
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
3.10.2 Geophysical exploration
Geophysical investigation has not been performed in the project area. The consultant has
proposed the geophysical investigation for earthing purposes.
3.10.2.1 Geophysical Survey
To examine resistivity for earthing purposes, an electric resistivity survey has been
proposed. The detailed proposed investigation is given in the table below.
ERT Profile
20
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
12 T1-BH 12 622894.407 2512780.042 33177 23 0
S.No. Bore Hole Easting Northing Chainage Depth (m) Bed rock
No. (km) depth (m)
21
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
8 BHE-04 648232.241 2515253.179 58725 33 3
22
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
41 BHM-21 650643.435 2515147.243 61200 61 2
23
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
74 BHM-35 652830.100 2514158.053 63600 150 0
24
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
107 T2-BH 119 655053.209 2513152.376 66040 19 2
Detailed information is presented in the geological drill hole logs. The detailed drill hole
logs and core photographs are annexed as annexure in GDR. The total core recovery and
RQD with depth (structure wise) are presented in figure 3-14,3-15, 3-16 and 3-17.
25
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
26
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
27
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
3.10.4.1 Test on Rock Core Samples
The samples were collected from the drill holes in portals and tunnels for laboratory testing.
The diameter of samples was 54.4mm (NX size) and various lengths to diameter ratios were
maintained. The details of the rock core samples are given in the tables below. Dry density
(IS 13030), Tensile strength (Brazilian) test (IS 10062), Uniaxial compressive strength test
(IS 9143), Modulus of deformability and Poisson's Ratio (IS 9221), Point load strength index
(IS 8764), Specific gravity (IS 1122), Tri-axial compression test (IS 13047), Water Absorption
and Porosity (IS 1124), Young’s Modulus (IS 2854:1990), Petrographic Analysis
(IS 2386-8:1963), Hardness (12608: 1989), Cerchar Abrasivity Index (ASTM D7625-10) tests
were conducted on the core samples.
TABLE 3-7 DETAILS OF ROCK CORE SAMPLE FOR TUNNEL-1
BH No. Rock Type Unit Weight (KN/m3) Moisture content (%) Mass Specific Gravity
BH-11 Basalt 24.45 26.73 25.64 1.96 4.56 3.47 2.502 2.725 2.621
BH-12 Basalt 21.85 26.69 24.86 0.95 8.18 3.94 2.237 2.734 2.570
BH-16 Basalt 24.39 26.97 26.23 1.18 1.83 1.46 2.50 2.76 2.69
BH-18 Basalt 22.46 27.16 25.731 1.15 2.64 1.837 2.30 2.78 2.634
BH-20 Basalt 21.92 27.50 24.46 0.65 4.82 2.80 2.24 2.86 2.51
BH-22 Basalt 26.203 27.393 26.864 0.39 1.96 1.07 2.681 2.805 2.750
BH-24 Basalt 24.96 26.07 25.41 0.92 2.53 1.78 2.55 2.66 2.60
BH-25 Basalt 27.254 27.757 27.509 0.71 0.95 0.82 2.781 2.844 2.818
BH-27 Basalt 25.68 27.43 26.38 0.43 0.95 0.70 2.628 2.807 2.692
BH-29 Basalt 24.01 27.53 25.87 0.95 2.14 1.54 2.460 2.860 2.646
28
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
TABLE 3-8 DETAILS OF TENSILE AND UCS VALUES FOR TUNNEL-1
BH-11 Basalt 6.18 14.75 11.12 120.1 120.1 120.1 1.29 1.29 1.29
BH-12 Basalt 2.68 23.74 11.90 38.9 63.3 56.70 4.26 5.46 4.86
BH-16 Basalt 3.68 10.18 6.678 27.6 27.6 27.6 3.71 3.71 3.71
BH-18 Basalt 5.91 17.13 11.25 21.5 26 23.59 4.07 4.07 4.07
BH-20 Basalt 2.30 26.85 14.59 10.40 166.81 85.99 1.78 9.48 5.15
BH-25 Basalt 2.61 4.13 3.35 76.14 185.08 130.61 1.81 1.81
BH-29 Basalt 3.80 7.76 5.64 79.76 103.15 91.46 3.24 7.43 5.34
29
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
TABLE 3-10 DETAILS OF STRENGTH PARAMETER FOR TUNNEL-1
BH No. Rock Type Point load strength Modulus of Elasticity Poisson’s Ratio
Index (N/mm2) (N/mm2)
BH-20 Basalt 2.04 2.04 2.04 10914 59695 38641 0.21 0.28 0.24
BH No. Rock Type Unit Weight (KN/m3) Moisture content (%) Mass Specific Gravity
BH-112 Basalt 27.170 28.21 27.74 0.21 0.39 0.26 2.870 2.888 2.832
BH-114 Basalt 27.40 27.92 27.67 0.32 0.59 0.45 2.799 2.857 2.828
BH-115 Basalt 27.07 27.52 27.30 0.98 1.73 1.43 2.818 2.772 2.796
BH-116 Basalt 21.62 27.66 25.09 1.05 2.26 1.49 2.212 2.83 2.565
BH-112 Basalt 1.91 3.25 2.53 79.99 181.21 122.21 6.78 8.59 7.69
30
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
BH-116 Basalt 6.22 16.48 10.06 38.36 44.68 41.52 - - -
BH-114 Basalt - - - - - -
BH-115 Basalt - - - - - -
BH-116 Basalt - - - - - -
The samples were collected from the drill holes in portals and tunnels for laboratory testing.
Samples were disturbed (DS) and undisturbed (UDS) in condition.
Natural Moisture (IS-2720-Part 2:1973), Natural Dry Density (IS 2720-Part 8:1983), Grain Size
Analysis (IS 2720-Part 4:1985), Hydrometer Analysis (IS 2720- Part 4:1985), Atterberg’s Limit
(IS 2720-Part 5:1985), Direct shear test (IS 2720-Part 13), Tri-axial Shear Test (IS 2720-Part
11&12), Consolidation Test (IS 2720-Part 15: 1965), Specific Gravity (IS 2720- Part 2) and
Silt factor (IRC-78:2014) tests were conducted on soil samples. The details of soil samples
is shown in table 3-14.
31
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
TABLE 3-15 DETAILS OF SOIL SAMPLE
Disturbed
Sample
BH No.
(%)
BH-
0.50 33.05 33.05 2.63 1 6 59 34 - - - -
114
Permeability tests for rock were conducted in drill holes in accordance with IS 5529-2. These
tests involved the water pressure technique using the single packer and double packer test.
The permeability values in the bedrock are given in respective drill hole and attached in
GDR.
3.10.5.2 Standard Penetration Test
32
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
3.10.6 Surface Development, Topographical and Environmental Conditions affecting Project Layout
3.10.6.1 Surface Development
The ongoing surface development project encompasses various tasks, including widening
the National Highway (NH) road, constructing railway viaducts 1 and 2, as well as developing
tunnels 1 and 2. These activities are integral components of the broader initiative aimed at
enhancing the infrastructure and transportation network in the area.
3.10.6.2 Topographical
The minimum and maximum rock covers along the alignment of tunnel-1 are found to be 5m
and 39m respectively. Similarly, for tunnel 2, the minimum and maximum rock covers are
found to be 3.3m and 155m respectively. From a topographical perspective, no significant
impacts are anticipated.
3.10.6.3 Environmental
A considerable amount of data has been shared by the client to the consultant. A detailed
topographic survey is to be required for tunnels portals and tunnel alignment.
No hydrological survey has been provided to the consultant in the project area. Consultant
plans to assess the hydrological requirements for tunnels based on catchment area and
rainfall data of the project alignment.
33
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
agricultural land. Portal 1 location is shown in figure 4-1. No unstable rock mass has been
observed at the portal location.
The portal area has been explored through exploratory drilling (T1-BH 12, T1-BH 13 and T1-
BH 14). The bed rock was encountered at the surface. The bed rock is pale brown to pale
grey in colour, highly jointed, fine grained and moderately weak vesicular/ferruginous
basalt. A thin layer of iron coating is present along the joints. The core recovery and RQD
ranges from 20% to 74% and 0 to 44% respectively.
Portal 2 of Tunnel (T1) is located at Chainage 34+400 km, near NH 47. The portal area is
covered with thin overburden. The overburden consists of graven and boulders of weathered
basalt with black soil.
The portal area has been explored through exploratory drilling (T1-BH 26, T1-BH 27 andT1-
BH 28) at the center and side slopes of proposed portal. The bedrock was encountered at
up to 1m depth. The rock is moderately to highly weathered, greyish brown in color, and
fine-grained vesicular basalt. The core recovery and RQD range varies from 12% to 76% and
0 to 61% respectively. The proposed portal location is shown in the figure 4-2.
34
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
35
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
rock cover above the tunnel is 5m and 39m, respectively. The lateral and vertical cover is
sufficient along the tunnel route.
The entire length of the tunnel passes through the basalt of the Malwa region of the Deccan
Plateau area. The rock mass is dissected by three sets of joints, plus random, including
bedding. The average orientations of the joints are: J1 (Bedding) - 75°/011°, J2 - 80°/060°,
and J3 - 77°/220°. The persistence of the discontinuities ranges from 3 to 15 meters, with
spacing ranging from 1 to 6 cm. The joint planes are rough, ranging from undulating to
planar, with apertures of 1 to 10 mm.
The entire tunnel length has been well investigated through geological mapping and
exploratory drilling.
A geological long section has been prepared along the tunnel based on surface geological
mapping and exploratory drilling. The core recovery range varies from 12% to 99% and Rock
Quality Designation (RQD) from nil to 95% indicates very poor to good rock mass.
The water table has been recorded in drill holes which are above and below the tunnel
level. The anticipated ground water condition is dry to dripping. The flowing condition was
also anticipated at few locations especially in nalla crossing and lithological contacts /
sheared rock mass.
Based on RMR classification, the anticipated rock mass classification along the tunnel
projected from the outcrop in the vicinity and drill hole data using RMR classification is Class
II -39%, Class III - 49%, IV-9% & V-3%.
The anticipated percentage of rock classes likely to encounter during tunneling have been
given only for estimate purpose with possible problematic zones. Since these are based on
projection with limited bed rock exposures and drill hole data, variation in terms of
chainages mentioned & percentage of rock class can be expected to some extent.
However, the advance probing, pipe roofing and pre-grouting has been kept in provision for
advancement of tunnel.
4.3.2 Geology and geotechnical evaluation along Tunnel 2
A main tunnel (T-2) and an escape tunnel, each 8.64 km in length, are proposed to run
parallel to each other on the left side of NH-47, crossing NH-47 at chainage 65+720 km. The
starting and ending chainages of tunnel (T-2) are 57+400 km and 66+040 km respectively. A
construction adit tunnel has also proposed which intersects the main tunnel and escape
tunnel at chainage 60+000 km. The topographical survey is not available along the
construction adit.
4.3.2.1 Tunnel 2 Portal (P1)
Portal 1 of Tunnel T2 is located near Kamlapur village. This area is part of the Rewa-Panna
Plateau and contains deposits of basaltic rocks. The portal -1 is covered with soil which is
fertile soil (black soil) and agricultural land. The topography is non-uniform with a plateau
terrain at the proposed portal location.
The portal area has been explored through exploratory drilling (T2-BHM-01). The bedrock
was encountered at 1.5m depth. The bedrock is highly weathered, fine-grained, brown-
colored, amygdaloidal basalt. This basalt contains numerous secondary minerals such as
quartz and calcite and a high amount of clay, indicating a history of weathering. A highly
fractured rock mass was observed from 1.5m to 3.5m depth and from 9.5m to 11.5m. The
36
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
Core recovery range varies from 19% to 96%, and RQD ranges from nil to 96% indicating poor
to very good rock mass.
The proposed Portal 1 of Tunnel T2 is shown in Figure 4-4.
The proposed Portal 2 of Tunnel T2 is located at chainage 66+040 km, part of the Rewa-
Panna Plateau. The portal location is covered with an overburden composed of boulders and
gravels of basalt rocks mixed with black soil. No unstable zones have been observed near
the portal area.
The portal area and their cut slopes were explored through exploratory drilling. The bore
holesT2-BH-118, T2-BH-119 and T2-BH-120 were drilled. The bed rock depth varies from 2m
to 2.5m.
The rock mass is moderately to highly weathered, light grey to brown in color, fine-grained
vesicular basalt. The vesicles are filled with white-colored quartz. The core recovery ranges
from 34% to 93%, and RQD ranges from nil to 81%, indicating variable rock quality with
significant weathering and the presence of vesicular structures filled with secondary
minerals.
The proposed Portal 2 of Tunnel T2 is shown in Figure 4-5.
37
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
The surface area of the tunnel is covered with an overburden consisting of cobble of basalt
rock mixed with silty and black soil.
The minimum and maximum rock cover above the tunnel is 3.3m and 155m, respectively
the lateral and vertical cover along the tunnel is sufficient. Several nallas and depressions
pass through the alignment. In-situ rock outcrops of fine-grained basalt are observed along
the alignment and vicinity of tunnel.
A geological long section has been prepared along the tunnel based on surface geological
mapping and exploratory drilling. The entire tunnel length has been well investigated
through geological mapping and exploratory drilling (T-2 BHM 1 to T-2 BH 120). The thickness
of the overburden varies from 0 to 18m. Core recovery ranges from 13% to 98%, while RQD
ranges from nil to 94%, indicating that the rock is generally quite strong except where
weathering is present.
The entire length of the tunnel passes through the basalt of the Rewa-Panna region of the
Deccan Plateau. However, at the midpoint of the alignment, a layer of red bole is found
sandwiched between the basalts. The anticipated groundwater condition varies from dry to
dripping, with flowing conditions expected at a few locations, especially at nalla crossings
and lithological contacts or sheared rock masses.
Based on the Rock Mass Rating (RMR) classification, the anticipated rock mass classification
along the tunnel, projected from outcrops in the vicinity and drill hole data, using RMR
classification is Class II - 41%, Class III - 33%, Class IV - 15%, and Class V - 11%. The anticipated
percentages of rock classes likely to be encountered during tunnelling have been given only
for estimation purposes with potential problematic zones. The variation in chainages and
rock class percentages can be expected.
From chainage 57400m to 58100m (700m), 65630 to 65730 and 65900 to 66040m, the ground
cover varies from 3.3m to 10.20m. Based on the drill holes data, The overburden thickness
38
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
varies from 1.5m to 3m depth. The actual rock cover is less than the ground cover above
the tunnel crown.
The rock mass is slightly weathered to fresh, medium strong to strong and medium grained
basalt as per boreholes. Based on geological logs of drill holes, the core recovery and RQD
indicates rock mass is fair to good in condition. However, due to tunnelling being done in
shallow overburden, special considerations need to be made during tunneling. Suitable
construction measures such as mechanical excavation, road header, controlled blasting,
pre-splitting, pre support such as forepoling/ piperoofing etc may need to be deployed as
per rock mass characteristics and overall ground behavior. Therefore, the rock class has
been considered as lower rock class for the planning of construction methodology and
estimation purposes. The anticipated rock class may vary during construction. The special
rock support system may be designed accordingly during detailed design for such cases
wherein ground cover above the tunnel excavation line is less than 1 times the equivalent
diameter of the excavated tunnel. In such cases, the excavation payment shall be made
considering lower rock class/ ground mass behavior (Item A1.4 of the BOQ) to mitigate the
suitable construction measures to be deployed in these zones. The support system payment
shall be made as per approved drawings and relevant contract conditions.
The behavior of the rock around the excavation will depend on characteristics of rock mass
types taking the ground water conditions, stress conditions and main discontinuities (lava
flow) related to tunnel axis into account. Stress controlled and squeezing behavior are
expected to occur when increased rock cover / or weak rock formations / area are
encountered.
39
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
40
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
5 Ground Characterization
41
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
42
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
TABLE 4-1 WEATHERING GRADE
In Geological L-Section, we described weathering grades using ground types as given in table
4-2.
TABLE 4-2 CLASSIFICATION OF GROUND TYPE
6 Design Consideration
6.1 Basis of Tunnel Design
The following geotechnical evaluations are performed:
• Determining the rock mass classes based on RMR and ONORM 2203 systems.
• Defining empirical support requirements according to the above rock classification
systems.
For the design of the primary support in the tunnel excavations:
• Tunnel grounds are grouped with respect to the rock mass classes.
• Utilizing Finite Element analysis (FEM) to determine the stress concentrations and
deformations around the excavated tunnels for each tunnel section.
43
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
• Checking validity of the empirical primary tunnel support requirements obtained
through RMR.
• Empirical primary tunnel support will be used if the tunnel is stable whereas they
will be reconsidered if the tunnel excavation is found to be unstable.
6.2 Rock Mass Classification
Rock mass classification will be conducted based on RMR (Rock Mass Rating) and ÖNORM
2203 (Austrian Code) at the portal areas and along the tunnel alignment.
While RMR provides quantitative values representing each rock mass, ÖNORM 2203 provides
qualitative assessment of the rock mass based on the behavior. Empirical tunnel support
types and categories are determined and analyzed prior to finalization of the primary
support required for the tunnel.
6.2.1 Geo-Mechanical Classification (RMR)
Bieniawski (1979) published the details of a rock mass classification called the
Geomechanics Classification or the Rock Mass Rating (RMR) system. Over the years, this
system has been successively refined as more case records have been examined. The
following six parameters are used to classify a rock mass using the RMR system:
Class I II III IV V
44
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
Class No. I II III IV V
Average
10 years for 15 6 months for 8 1 week for 10 hours for 30 minutes for
stand-up time
m span m span 5 m span 2.5 m span 1 m span
span
Friction of
< 45° 35°-45° 25°-35° 15°-25° >15°
rock mass
With calculated value of RMR, some set of support suitable for the lithological unit are
suggested by Bieniawski, this support can be selected from the chart given below and can
be used as a preliminary idea to start validation of the actual support requirements with
the help of other analytical and numerical methods.
TABLE 6-2 SUPPORT REQUIREMENTS AS PER ROCK MASS CLASS
Source: Rock Mass Classification: Table 5: Guidelines for excavation and support of 10 m
span rock tunnels in accordance with the RMR system (After Bieniawski 1989).
6.2.2 Austrian Code (ONORM 2203)
The Austrian Code (ÖN 2203) features a qualitative ground classification system that must
be considered within the overall context of the NATM. In essence, the NATM is an approach
or philosophy integrating the principles of the behavior of rock masses under load and
monitoring the performance of underground excavations during construction. The NATM
involves a combination of many established ways of excavation and tunneling, but the
difference is the continual monitoring of the rock movement and the revision of support to
obtain the most stable and economical lining.
45
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
According to ÖN 2203 Classification, rock masses are divided into 3 main types which are A,
B and C:
• A (Stable to over breaking) Stresses acting on rock mass do not cause major failures.
• B (Friable) Disintegration due to structural weakness and/or lack of interlocking.
• C (Squeezing) Strength of rock mass is exceeded to great depth; this type also
includes rock bursts and swelling rock.
The main rock types defined in this section are subdivided into various rock classes the
descriptions and rock mass behavior of which are given in table 6-3.
TABLE 6-3 CHART OF AUSTRIAN CODE (ONORM 2203)
46
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
6.3.2 Rock Mass Type 2 (RMT-2)
The Red bole rock mass is available within Tunnel-2 at greater depths. The Red bole is very
fine grained, completely to highly weathered, laminated and very poor to weak and fragile
in nature.
6.3.3 Rock Mass Type 3 (RMT-3)
The Slope wash material available on the surface of tunnel’s alignment and portal-2 of both
tunnels. The slope wash material generally consists of angular to sub angular cobbles and
boulders of basalt embedded in a clay matrix.
6.3.4 Rock Mass Type 4 (RMT-4)
The Black soil is composed of the weathering process of igneous basalt rocks of the Deccan
trap. It covers the portal-1 of Tunnel-1 and Tunnel-2 as well as the agricultural part of the
alignment.
6.4 Rock Support Requirements
The rock units forming the geological profile are evaluated based on rock mass rating (RMR)
and ONORM 2203 system for the determination of rock mass classification and tunnel support
requirements.
Based on the ranges of RMR values for the different criteria, the rock mass is described as:
Good, Fair, Poor and Very Poor. For different RMR ranges, support systems have been
defined which shall be applied accordingly.
47
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
Rock bolting: Ø25mm SN / Ø32mm SD bolts
length 4m pattern 1.5x1.5m
Lattice girder 3 bars 95/25/20mm spacing
1.5m
Forepoling steel bars dia 32mm, or 48.3mm
SDR pipe length 6m to be installed at 300mm
c/c with 2m overlap [(fully injected with
mortar) (if required)]
48
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
gathered from this work allows confirming the rock classes predicted in the design stage
and modifying the primary support if adverse ground conditions are encountered.
6.6 Final Lining
A cast in-situ concrete lining will be designed for long term effects during the design stage.
6.7 Instrumentation
In the tunnel excavations performed by means of drill and blasts methods, the round lengths
are closely related to stand-up time, unsupported span, and placement of the support on
time. The NATM requires the installation of advanced instrumentation to monitor the
deformations of the excavation and buildup of the load in the support. This information on
tunnel stability and permits optimization of the round lengths (heading/bench) and support
components.
The different soil and rock types have been described in section 4 and 5. This present section
summarizes the rock mass, laboratory test data and rock mass properties for baseline
purpose.
7.1 Rock Mass Rating
The rock mass has been classified based on several criteria including rock strength and
quality, the general character of rock discontinuities, and the anticipated groundwater
conditions. Based on RMR classification, the rock class and RMR values are given in Table 7-
1. The baseline is that the chainage of rock class varies during construction stage.
TABLE 7-1 ANTICIPATED RMR, ROCK CLASS AND SUPPORT CLASS ALONG THE TUNNELS
Tunnel Chainage (m) Length (m) Anticipated Rock Class Support Class
From To RMR
33160 33180 20 <20 V SC V
33180 33250 70 21-40 IV SC IV
33250 33740 490 41-60 III SC II & SC III
Tunnel-1 33740 34220 480 61-80 II SC II
34220 34340 120 41-60 III SC II & SC III
34340 34380 40 21-40 IV SC IV
34380 34400 20 <20 V SC V
57400 58100 700 <20 V SC V
58100 59085 985 21-40 IV SC IV
59085 60690 1605 41-60 III SC II & SC III
60690 64270 3580 61-80 II SC II
Tunnel-2 64270 65480 1210 41-60 III SC II & SC III
65480 65630 150 21-40 IV SC IV
65630 65730 100 <20 V SC V
65730 65900 170 21-40 IV SC IV
65900 66040 140 <20 V SC V
49
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
II 41
III 33
Tunnel-2
IV 15
V 11
Permeability
Min. Max.
50
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
T1-BH 20 46 28-31 0.736 1.123
17.2
T1-BH 24 29 6.2 9-12 8.788 11.039
Min. Max.
51
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
BHM-29 168 30.3 84-87 2.573 2.930
52
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
BHM-41 116 24.64 23-26 5.967 11.751
53
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
BHE-27 146 13-16 6.286 8.877
54
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
indicates rock mass is fair to good in condition. However, due to tunnelling being done in
shallow overburden, special considerations need to be made during tunneling. Suitable
construction measures such as mechanical excavation, road header, controlled blasting,
pre-splitting, pre support such as forepoling/ piperoofing etc may need to be deployed as
per rock mass characteristics and overall ground behavior. Therefore, the rock class has
been considered as lower rock class for the planning of construction methodology and
estimation purposes. The anticipated rock class may vary during construction. The special
rock support system may be designed accordingly during detailed design for such cases
wherein ground cover above the tunnel excavation line is less than 1 times the equivalent
diameter of the excavated tunnel. In such cases, the excavation payment shall be made
considering lower rock class/ ground mass behavior (Item A1.4 of the BOQ) to mitigate the
suitable construction measures to be deployed in these zones. The support system payment
shall be made as per approved drawings and relevant contract conditions.
The summary of ground cover for two tunnels- T-1 and T-2, is given in the table 7-5 below:
TABLE 7-5 GROUND COVER ALONG THE TUNNELS
The geotechnical risks and potential hazards that may be encountered in the tunnel are as
follows:
• Risk of facing unforeseen geological conditions at portal areas and tunnel alignment
which will cause stability problems in tunnel excavation. Assessment of the actual
geological conditions and monitoring of ground deformations, mitigation measures
like probing, additional support, grouting, drainage etc. shall be taken.
• The risk of water ingress will affect the stability and tunnel excavation rates. The
risk is higher particularly in the fault zones. Horizontal probe drilling shall be
performed to investigate groundwater and rock conditions ahead of the tunnel face.
Suitable mitigation measures (grouting, drainage etc.) shall be taken if the results
of investigations indicate high risk.
• Risk of face instability due to complex nature of the tunnel ground, orientation of
discontinuities and tectonically disturbed zones (thrust, faults, shear zones), ground
water, higher overburden. Assessment of the actual geological conditions and
monitoring of ground deformations, mitigation measures like additional support,
probing, grouting, drainage etc. shall be taken.
• Risk of interruption of the excavation process for holiday breaks and/or weekends.
This allows time-dependent stress re-distribution. For this reason, strengthening of
55
Detailed Design Consultancy for Tunnel and Viaduct including Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
the initial support near the face shall be required, if the face is to be left unattended
for a long time.
• Risk of chimney formations in the low cover zones along the tunnels. Proper pre-
support of tunnel crown using presplitting, pipe roofing and tunnel face using face
support such as face bolts/shotcrete.
56
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
N
2. THE GEOLOGICAL MAPPING HAS BEEN DONE WITH HELP OF COMPASS & GPS.
54
0
57
PROPOSED TUNNEL-1
57
565
5
535
560
0
555
530
54
32+600
32+700
32+800
32+900
33+000
33+100
33+200
33+300
33+400
33+500
33+600
33+700
5
52
55
5
0
0
525 53 54
30.00
5
T1-BH01
T1-BH02
T1-BH06
T1-BH18
T1-BH20
?
T1-BH07
?
T1-BH17
T1-BH19
T1-BH15
T1-BH14
T1-BH04
30.00
T1-BH16
T1-BH08
T1-BH05
T1-BH09
T1-BH10
T1-BH11
T1-BH03
22.42
T1-BH13
? ?
T1-BH12
30.00
53
530 5
? 540
530 535
? 535
5
52 ? ?
? 53
5
53
530 5 535
530
NH 47 NH 47
0 540
54
5
53
540
P01
NH 47
P02
Scale:
20 20 40 60 80 100m
1 : 2000
515 N
520
535
525
W
530
545
PROPOSED TUNNEL-1
540
560
57
565
? 5
34+100
34+200
34+300
34+400
34+500
34+600
34+700
57 0
560
580 57
? P03
S REV. DATE DESCRIPTION
33+700
33+800
33+900
34+000
5
0
56
55
? ?
?
? ?
5
? ? Project
100.00
53
50
?
0
T1-BH26
T1-BH32
Detailed Design Consultancy for Tunnel and Viaduct including
T1-BH20
T1-BH21
T1-BH22
T1-BH23
T1-BH24
T1-BH25
T1-BH29
T1-BH30
T1-BH31
T1-BH33
?
Geotechnical Investigation in connection with Construction of
0 electrified new BG railway line between Mangliya Gaon (Indore)
0
54
53
0
52 ? to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
T1-BH27
540
T1-BH28
535 0 5 ?
100.00
540 ? 53 52 ?
540
?
NA
LA
535 ? /D
? 530 RA
5 ? IN
52
53
5 535
km 34.0
NH 47
34+400.00
34+620.00
520
ROW CH
ROW CH
RVNL APPROVAL
50
50
530
0
5
540 53 53
525
5
520
5
515
TÜMAŞ
BORE HOLE
India
ANTICIPATED LITHO CONTACT Drawn by Issued by Checked by Approved by
TUNNEL
Shanti rawat Pooja Swami Rishi Sharma Halit Bakirci
NALA/DEPRESSION
Drawing Title
OUTCROP (BASALT)
AGRICULTURAL LAND
Released For
Revision
Drawing No.
MATCH LINE A
600 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
T1-BH05
T1-BH03
T1-BH02
T1-BH04
T1-BH01
20.00M
19.00M
20.00M
590
20.00M
17.00M
3. THICKNESS OF OVERBURDEN IS BASED ON TOPOGRAPHY AND AVAILABLE INVESTIGATION DATA.
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA INVESTIGATION DATA (DRILL HOLE).
580 5. LITHOLOGICAL CONTACTS SHOWN ARE BASED ON PROJECTION OF OUTCROP DATA COLLECTED DURING FIELD MAPPING
? ?
? ? ? AROUND TUNNEL ALLIGNMENT.
570 ?
? ? ? ?
560
FORMATION LEVEL
550
540
32+320
32+340
32+360
32+380
32+400
32+420
32+440
32+460
32+480
32+500
32+520
32+540
572.841 32+560
32+580
32+600
32+620
32+640
32+660
32+680
32+700
32+720
32+740
32+760
32+780
32+800
32+820
32+840
CHAINAGE
571.962
572.130
577.060
577.370
577.540
570.483
568.989
570.138
570.877
571.177
571.477
571.638
571.798
572.298
572.457
572.616
573.133
574.333
576.518
577.678
577.737
577.343
577.127
573.425
575.245
575.975
577.235
GROUND LEVEL
Ground Type
Scale:
PROPERTIES
10 10 20 30 40 50m
1 : 1000
Anticipated Rock class
Highly Fractured /
Shear Zone
GEOLOGICAL
POTENTIAL
HAZARDS
Anticipated Ground
Water Condition
REV. DATE DESCRIPTION
Project
Gound Cover (m) Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore)
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
LEGEND
BORE HOLE
TÜMAŞ
WATER TABLE
India
Drawn by Issued by Checked by Approved by
OVERBURDEN
STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
WEAK ROCK 5 - 25
HIGHLY WEATHERED ROCK MASS
MEDIUM STRONG 25 - 50
Drawing Title
STRONG ROCK 50 - 100
BLACK SOIL
Released For
Revision
Drawing No. TU-ER-JV-IB-FD-TI-GS- 0
PROPOSED TUNNEL-1
T1-BH12 , 13 & 14
610 3. THICKNESS OF OVERBURDEN IS BASED ON TOPOGRAPHY AND AVAILABLE INVESTIGATION DATA.
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA INVESTIGATION DATA (DRILL HOLE).
MATCH LINE A
600 5. LITHOLOGICAL CONTACTS SHOWN ARE BASED ON PROJECTION OF OUTCROP DATA COLLECTED DURING FIELD MAPPING
T1-BH16
T1-BH15
T1-BH11
T1-BH10
T1-BH09
T1-BH08
23.00M
AROUND TUNNEL ALLIGNMENT.
24.00M
22.00M
21.00M
T1-BH06
T1-BH07
20.00M
19.00M
19.00M
19.00M
590
580 ?
? ? ? ? ?
? ? ? ? ?
? ? ?
570 ? ? ? TUNNEL-1
560
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
FORMATION LEVEL FORMATION LEVEL
550
GT-2 MODERATELY WEATHERED BASALT
540
GT-3 HIGHLY WEATHERED BASALT
530
520
510
32+840
576.731 32+860
32+880
32+900
32+920
32+940
32+960
32+980
33+000
33+020
33+040
33+060
33+080
33+100
33+120
33+140
33+160
33+180
33+200
33+220
33+240
33+260
33+280
33+300
33+320
33+340
33+360
33+380
CHAINAGE
579.712
580.172
580.632
579.562
579.602
575.234
575.650
576.550
577.450
578.864
580.600
577.127
575.347
577.396
577.336
578.173
578.493
580.063
579.526
582.143
576.039
575.288
579.288
577.415
577.635
577.855
580.455
GROUND LEVEL
Lithotype BASALT
Scale:
Rock mass Strength
5-25 25-50 50-100 10 10 20 30 40 50m
(UCS) (MPa)
1 : 1000
41-60
PROPERTIES
Highly Fractured /
Shear Zone REV. DATE DESCRIPTION
GEOLOGICAL
POTENTIAL
HAZARDS
Anticipated Ground
Water Condition DAMP TO WET
Project
6.00
5.00
6.00
7.00
7.00
to Budni stations (198 KMs) of West Central Railway and Western
Gound Cover (m)
Railway in Madhya Pradesh State, India.
LEGEND
JOINT SET NO. DIP AMOUNT DIP DIRECTION S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa) Drawing Title
Revision
Drawing No. TU-ER-JV-IB-FD-TI-GS- 0
T1-BH20
T1-BH21
46.00M
47.00M
26.00M MATCH LINE B
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
620
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
T1-BH19
43.00M
3. THICKNESS OF OVERBURDEN IS BASED ON TOPOGRAPHY AND AVAILABLE INVESTIGATION DATA.
610
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA INVESTIGATION DATA (DRILL HOLE).
T1-BH18
31.00M
?
T1-BH17
?
30.00M
600 5. LITHOLOGICAL CONTACTS SHOWN ARE BASED ON PROJECTION OF OUTCROP DATA COLLECTED DURING FIELD MAPPING
T1-BH16
? AROUND TUNNEL ALLIGNMENT.
590 ? ?
?
?
580 ? ?
? ? ?
570
TUNNEL-1
560
520
510
33+380
33+400
33+420
33+440
33+460
33+480
33+500
33+520
586.661 33+540
33+560
33+580
588.481 33+600
590.801 33+620
33+640
33+660
33+680
33+700
33+720
604.131 33+740
606.081 33+760
33+780
33+800
33+820
33+840
33+860
33+880
608.451 33+900
CHAINAGE
583.832
593.132
609.040
584.664
587.874
597.794
600.126
609.327
585.490
585.460
602.129
607.978
609.609
582.143
585.909
586.058
587.267
595.463
609.875
608.745
585.685
GROUND LEVEL
Lithotype BASALT
Scale:
Rock mass Strength
(UCS) (MPa) 50-100 100-250 10 10 20 30 40 50m
1 : 1000
PROPERTIES
41-60
Highly Fractured /
Shear Zone REV. DATE DESCRIPTION
GEOLOGICAL
POTENTIAL
HAZARDS
Anticipated Ground
Water Condition Project
13.00
13.00
15.00
18.00
24.00
30.00
35.00
39.00
38.00
37.00
Gound Cover (m)
Railway in Madhya Pradesh State, India.
LEGEND
JOINT SET NO. DIP AMOUNT DIP DIRECTION S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa) Drawing Title
Revision
Drawing No. TU-ER-JV-IB-FD-TI-GS- 0
MATCH LINE C
257 °N 630 77 °N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
620
T1-BH22
3. THICKNESS OF OVERBURDEN IS BASED ON TOPOGRAPHY AND AVAILABLE INVESTIGATION DATA.
47.00M
PROPOSED TUNNEL-1
T1-BH26 , 27 & 28
5. LITHOLOGICAL CONTACTS SHOWN ARE BASED ON PROJECTION OF OUTCROP DATA COLLECTED DURING FIELD MAPPING
T1-BH23
35.00M
600 AROUND TUNNEL ALLIGNMENT.
T1-BH24
?
MATCH LINE D
29.00M
?
T1-BH25
26.00M
?
28.00M
590
? ?
580 ?
? ?
? ?
570 ? ?
? ?
TUNNEL-1 ? ?
? GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
560
GT-2 MODERATELY WEATHERED BASALT
550
FORMATION LEVEL GT-3 HIGHLY WEATHERED BASALT
540
530
520
510
608.451 33+900
33+920
33+940
33+960
599.351 33+980
34+000
34+020
34+040
34+060
34+080
34+100
34+120
34+140
34+160
34+180
34+200
34+220
34+240
578.141 34+260
34+280
34+300
34+320
34+340
34+360
34+380
34+400
34+420
CHAINAGE
597.072
606.186
603.907
587.854
585.554
577.384
601.629
576.626
572.960
592.457
590.153
584.417
583.287
582.367
581.663
580.959
579.009
575.937
575.248
574.617
573.473
594.765
579.985
574.045
GROUND LEVEL
Lithotype BASALT
HAZARDS
8.00
6.00
5.30
9.00
37.00
31.00
26.00
20.00
15.00
13.00
11.00
Railway in Madhya Pradesh State, India.
Gound Cover (m)
LEGEND
JOINT SET NO. DIP AMOUNT DIP DIRECTION S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa) Drawing Title
Revision
Drawing No. TU-ER-JV-IB-FD-TI-GS- 0
MATCH LINE D
3. THICKNESS OF OVERBURDEN IS BASED ON TOPOGRAPHY AND AVAILABLE INVESTIGATION DATA.
590 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA INVESTIGATION DATA (DRILL HOLE).
T1-BH29
23.00M
5. LITHOLOGICAL CONTACTS SHOWN ARE BASED ON PROJECTION OF OUTCROP DATA COLLECTED DURING FIELD MAPPING
T1-BH30
580
T1-BH31
14.00M
T1-BH32
AROUND TUNNEL ALLIGNMENT.
T1-BH33
12.00M
11.00M
11.00M
570 ?
? ? ?
? ? ? ? ?
560 ? ? ? ?
? ? ? ?
550
FORMATION LEVEL
540 FRESH TO SLIGHTLY WEATHERED BASALT
GT-1
34+440
34+460
34+480
34+500
565.671 34+520
564.251 34+540
34+560
34+580
34+600
34+620
34+640
34+660
34+680
34+700
34+720
34+740
34+760
34+780
34+800
34+820
CHAINAGE
561.642
561.372
560.984
572.960
571.180
561.760
561.050
560.540
572.447
569.138
567.096
563.269
562.737
561.078
561.408
560.839
560.779
560.719
562.205
GROUND LEVEL
Lithotype BASALT
Ground Type
Scale:
PROPERTIES
10 10 20 30 40 50m
1 : 1000
Highly Fractured /
Shear Zone
GEOLOGICAL
POTENTIAL
HAZARDS
Anticipated Ground
Water Condition
REV. DATE DESCRIPTION
TUNNEL
J4 75° 90° 4 <20 V SC V 3%
Design Consultant
MEDIUM STRONG 25 - 50
Drawing Title
STRONG ROCK 50 - 100
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. TU-ER-JV-IB-FD-TI-GS- 0
MATCH LINE A
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
W PATH 2. THE GEOLOGICAL MAPPING HAS BEEN DONE WITH HELP OF COMPASS & GPS.
PROPOSED TUNNEL-2 START E PATH
3. LITHOLOGICAL CONTACTS SHOWN ARE BASED ON PROJECTION OF OUTCROP DATA COLLECTED
57+500
57+600
57+700
57+800
57+900
58+000
58+100
58+200
58+300
58+400
58+500
58+600
58+700
58+800
S DURING FIELD MAPPING AROUND TUNNEL ALIGNMENT.
CH=57+400M
PATH
57+400
48
5
T2-BH30
T2-BH29
LEGEND
485
T2P1
BHM-01
BHM-02
BHM-05
BHM-03
10.00
BHM-04
ROW ROW
25.00
22.00
48
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
SEASONAL NALA
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
480
ROW
BHE-04
BHE-05
BHE-01
BHE-02
BHE-03
485
TUNNEL
485
ESCAPE TUNNEL
P AT H
485
485
SE
ROW ROW
AS
48 ON
5
PA AL NALA/DEPRESION
485
485
TH NA
485
48 48
5
LA
5 485
BOULDER (<0.5m)
BASALT
AGRICULTURAL LAND
MATCH LINE A
PA
TC: 59+733
TH
59+600
59+500
ST: 59+533
59+400
59+300
59+200
59+700
59+100
59+000
58+900
58+800
59+800
E Scale:
59+900
490
MATCH LINE B
0
490 S 25 25 50 75 100 125m
60+00
1 : 2500
490
00
49
490
60+1
PATH
00
60+2
BHM-08
BHM-10
BHM-05
BHM-09
BHM-11
BHM-06
BHM-07
25.00
BHM-12
10.00
BHM-13
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW
-14
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
BHM
ROW ROW ROW ROW ROW ROW
ROW
ROW ROW REV. DATE DESCRIPTION
BHE-06
BHE-10
BHE-05
ROW
BHE-08
BHE-09
BHE-07
ROW ROW
BHE-11
490 ROW ROW
ROW
BHE-12
ROW ROW
ROW ROW
ROW Project
BHE-13
490
22.00
ROW
ROW Detailed Design Consultancy for Tunnel and Viaduct including
49
ROW
0
km 59.0 Geotechnical Investigation in connection with Construction of
4
BHE-1
electrified new BG railway line between Mangliya Gaon (Indore)
km 60
.0
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
PA
TH
RVNL APPROVAL
60+700
60+600
60+500
60+800
60+400
MATCH LINE B
61+000
0
CT: 60+889
N
60+30
089
0
61+200
P AT E
0
61+300
60+2
TS: 61+
MATCH LINE C
485 PATH
61+400
S Design Consultant
48
61+500
5
490
BHM-17
BHM-18
61+600
N
BHM-16
BHM-19
PATH
BHM-20
BHM-15
500 TÜMAŞ
ROW
ROW
BHM-1
ROW
ROW ROW
ROW ROW ROW ROW ROW ROW India
BHM-22
ROW ROW ROW ROW ROW ROW
ROW ROW
10.00
ROW
ROW ROW
BHE-17
ROW ROW
BHM-23
BHE-16
R OW ROW ROW
ROW ROW
48
ROW
R OW ROW ROW
5
ROW
?
BHE-19
ROW ROW
BHE-15
ROW
ROW
BHM-24
ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW ROW
?
BHE-20
ROW ROW
ROW ROW
BHE-1
ROW ROW
ROW
BHE-21
ROW ROW
485 ROW
ROW
ROW
BHE-22
ROW
22.00
ROW Drawing Title
ROW
ROW
BHE-23
? ?
490
VILLAGE
H
PAT
49
5
PATH
Released For
Revision
TUNNEL - 2 GEOLOGICAL PLAN Drawing No. 0
SCALE(A1) 1:2500
MATCH LINE D
3. LITHOLOGICAL CONTACTS SHOWN ARE BASED ON PROJECTION OF OUTCROP DATA COLLECTED
61+700
61+600
61+800
61+900
62+000
62+100
62+200
62+300
62+400
62+500
62+600
62+700
62+800
62+900
63+000
63+100
5 530
545 52
W 525
0 58
S 0 52 5
LEGEND
560
53
565
555
5
58
540 53
57
530
58
5
550
570
5
540
5
0
51
545
525
520 520 58 W
535
T2-BH79/BHM-25
0
57
5 590 BORE HOLE (MT)
? ? ? 585 580
T2-BH80
?
BHM-26
BHM-29
BHM-28
BHM-27
BHM-30
T2-BH75
BHM-31
T2-BH77
T2-BH78
T2-BH76
BHM-24
? ?
535
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ? ROW ROW ROW ROW ROW ROW? ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ? ANTICIPATED LITHO CONTACT
530
ROW ROW ROW ROW ? 525
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW TUNNEL
BHE-30
BHE-31
BHE-27
BHE-29
BHE-24
BHE-28
575
?
BHE-25
5
0
520 5
5BHE-26
50
580
?
51
51 520 52
5
535 0 5 NALA/DEPRESION
54
0
? 54
57
53
515
550
560
57
56
5
560
0
55
5
60
55
565
585
?
5
51
555
0
?
56
0
55
505 BOULDER (<0.5m)
0
50
0
T H
km 62.0 km 63.0
PA
PA SLOPE WASH MATERIAL
49
5
TH
H
PAT
5
49
BASALT
AGRICULTURAL LAND
555
550
MATCH LINE D
63+100
63+200
63+300
63+400
63+500
63+600
63+700
63+800
63+900
64+000
64+100
64+200
64+300
64+400
64+500
64+600
55
MATCH LINE E
54 Scale:
5
0
545
N
5
56
54
570
535
5
575 565
E 25 25 50 75 100 125m
550
530
0
5
560
545
56
56
54
57
570
56
5 1 : 2500
0
530
57
56
555
5 570
535
NALA
0
57
58
575
540
W 575
0
555
58
550
S
570
56
BHM-39/BH100
5
NA
55
565
55
56
5
560
LA
LA
0
T2-BH102
580
560
A
NA
BHM-33
BHM-40
BHM-32
10.00
T2-BH99
BHM-37
BHM-38
BHM-34
BHM-36
NA
BHM-41
BHM-35
T2-BH104
?
55
22.00
55
5
0
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
BHE-38
BHE-37
BHE-34
BHE-36
BHE-33
BHE-35
5
540
NA
55 57
575
5
5
5
565
52
550
54
575
570
NALA
555
54
535
525
LA
555
515
565
0
0
530
560
545
550
575
55
545
570
56
530
0
570
565
520
55
560
5
540
545 5 Project
55
53
555
56
535
54
56
5
5
0
0
55
550
53
540 0
? Detailed Design Consultancy for Tunnel and Viaduct including
5
5
56
56
5
52
TH
km 64.0
0
55
PA
0
5
53
?
555
electrified new BG railway line between Mangliya Gaon (Indore)
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
LA
NA
465
48
0
N
555
475
MATCH LINE E
57
5 57 51 50 50
485
0 5
70
0
5
0 53
E
64+600
64+700
64+800
64+900
65+000
65+100
65+200
65+300
65+400
65+500
65+600
65+700
65+800
65+900
66+100
4
56
ROW CH 66+040.00
520
47
57
560
54 5
66+000
55
53
550 51 0 475
5
0
5
580
49
RVNL APPROVAL
T2P2 CH=66+040M
52
465
49 W
5
560
0 470
470
565
57 S
0
475
?
T2-BH121
-47
LA
31.00
NH
NA
T2-BH105
? T2-BH114
T2-BH120
T2-BH116
T2-BH117
T2-BH111
T2-BH113
T2-BH112
T2-BH115
10.00
T2-BH110
BHM-47
T2-BH104
BHM-46
BHM-45
Design Consultant
BHM-43
BHM-42
480
ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
T2-BH119
? TÜMAŞ
T2-BH118
ROW
BHE-40
BHE-39
525
53
22.00
47
0
485
550
480
47
India
530
565
0
5
-47
0
46
54
465
52 0
47
0
5
LA
5
525
49
515
47 470
49
0
55
NH
5
51 520
Drawn by Issued by Checked by Approved by
53
570
53
515
A
49
0
505
ROW ROW
540
510
5
5
ROW
465
50
48
515
5 60 0
0
570 56
?
5
54
475
54
5
550 555
5
480
56
? km 65.0
Drawing Title
km 66.0
GEOLOGICAL PLAN OF TUNNEL -2
SHEET 2 OF 2
TUNNEL - 2 GEOLOGICAL PLAN
SCALE(A1) 1:2500
Released For
Revision
Drawing No. 0
T2P1 CH=57+385M
550
MATCH LINE A
540
BHM-01
24.00M
530
520
? ? ? ? ? ? ?
? ? ? ? ? ?
? ? ?
510 TUNNEL 2
500
480
470
460
450
57+340
57+360
57+380
57+400
57+420
57+440
57+460
57+480
57+500
57+520
57+540
57+560
57+580
57+600
57+620
57+640
57+660
57+680
57+700
57+720
57+740
57+760
57+780
57+800
57+820
57+840
57+860
57+880
CHAINAGE
519.161
519.261
520.124
519.252
518.862
519.014
519.062
519.442
519.374
515.493
515.587
516.963
518.340
519.140
519.936
519.688
519.177
519.105
519.010
518.890
518.770
518.955
519.038
519.338
519.390
519.420
519.398
519.346
GROUND LEVEL
Lithotype BASALT
Shear Zone
POTENTIAL
HAZARDS
7.50
6.70
6.80
6.70
7.20
7.50
7.80
8.40
8.50
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
LEGEND
RQD
CORE RECOVERY
COMPLETED BORE HOLE
RVNL APPROVAL
IN PROGRESS
STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
? WATER TABLE WEAK ROCK 5 - 25
MEDIUM STRONG 25 - 50 Design Consultant
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
TUNNEL
TÜMAŞ
ANTICIPATED LITHO CONTACT/ GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
? ANTICIPATED ROCK LINE GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT India
Drawn by Issued by Checked by Approved by
OVERBURDEN
ROCK MASS CLASSIFICATION (RMR) Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
BLACK SOIL 1 61-80 II SC II 41
2 41-60 III SC II / SC III 33
Drawing Title
3 21-40 IV SC IV 15
4 <20 V SC V 11
BASALT ROCK MASS GEOLOGICAL L-SECTION OF TUNNEL - 2
(MAIN TUNNEL)
(SHEET 1 OF 17)
RED BOLE ROCK MASS
Revision
Drawing No.
PREPARED BY :- KM Sakshi
356 °N 176 °N
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
550
MATCH LINE A
540
BHE-01
25.00M
530
520 ? ?
? ? ?
? ? ?
510 ESCAPE TUNNEL
500
FORMATION LEVEL
490
480
470
460
450
57+340
57+360
57+380
57+400
57+420
57+440
57+460
57+480
57+500
57+520
57+540
57+560
57+580
57+600
57+620
57+640
57+660
57+680
57+700
57+720
57+740
57+760
57+780
57+800
57+820
57+840
57+860
57+880
CHAINAGE
519.161
519.261
515.493
515.587
516.963
518.340
519.140
519.936
520.124
519.688
519.252
519.177
519.105
519.010
518.890
518.770
518.862
518.955
519.014
519.038
519.062
519.338
519.390
519.442
519.420
519.398
519.374
519.346
GROUND LEVEL
Lithotype BASALT
Shear Zone
POTENTIAL
HAZARDS
7.50
6.70
6.80
6.70
7.20
7.50
7.80
8.40
8.50
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE WEAK ROCK 5 - 25
RVNL APPROVAL
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
Design Consultant
? WATER TABLE
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT TÜMAŞ
TUNNEL
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
NOTES:-
356 °N 176 °N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
560 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
550
MATCH LINE A
MATCH LINE B
540
BHE-02
530
26.00M
520
? ? ? ? ?
? ?
? ? ? ? ?
510
ESCAPE TUNNEL
500
480
470
460
450
57+880
57+900
57+920
57+940
57+960
57+980
58+020
58+040
58+060
58+080
58+100
58+120
58+140
58+160
58+180
58+200
58+220
58+240
58+260
58+280
58+300
58+320
58+340
58+360
58+380
58+400
58+420
58+000
CHAINAGE
519.261
519.346
519.319
519.414
519.510
519.577
519.613
519.649
519.677
519.705
519.747
519.803
519.859
519.982
520.106
520.175
520.187
520.199
519.119
518.032
518.069
520.453
520.749
521.040
521.210
521.256
521.302
521.383
GROUND LEVEL
Lithotype BASALT
Shear Zone
POTENTIAL
HAZARDS
9.20
9.50
9.90
8.60
10.20
10.80
11.10
11.80
12.80
13.20
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE WEAK ROCK 5 - 25
RVNL APPROVAL
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
Design Consultant
? WATER TABLE
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT TÜMAŞ
TUNNEL
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
NOTES:-
356 °N 176 °N 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
560 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
550
MATCH LINE C
MATCH LINE B
540
BHE-05
BHE-04
35.00M
33.00M
BHE-03
31.00M
NSL
530
? ?
520 ? ? ? ? ? ?
? ? ?
? ? ? ?
? ?
510 ?
ESCAPE TUNNEL
500
480
470
460
450
58+420
58+440
58+460
58+480
58+500
58+520
58+540
58+560
58+580
58+600
58+620
58+640
58+660
58+680
58+700
58+720
58+740
58+760
58+780
58+800
58+820
58+840
58+860
58+880
58+900
58+920
58+940
58+960
CHAINAGE
522.051
522.011
521.971
522.521
523.711
521.383
521.465
521.590
521.758
521.926
521.984
522.042
522.118
522.266
522.377
522.449
522.664
522.808
522.952
523.096
523.240
523.356
523.472
523.567
523.639
523.798
523.886
523.970
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Shear Zone
POTENTIAL
HAZARDS
14.30
14.70
14.80
15.40
15.90
16.50
17.10
17.60
18.00
18.50
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE WEAK ROCK 5 - 25
RVNL APPROVAL
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
Design Consultant
? WATER TABLE
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT TÜMAŞ
TUNNEL
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
NOTES:-
356 °N 176 °N 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
560 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE D
550
MATCH LINE C
BHE-09
BHE-08
40.00M
540
BHE-07
37.5 M
38.00M
BHE-06
36.00M
530
? ? ? ?
? ?
? ? ? ?
520 ?
? ? ? ?
? ?
?
510 ?
?
470
460
450
58+960
58+980
59+000
59+020
59+040
59+060
59+080
59+100
59+120
59+140
59+160
59+180
59+200
59+220
59+240
59+260
59+280
59+300
59+320
59+340
59+360
59+380
59+400
59+420
59+440
59+460
59+480
59+500
CHAINAGE
524.751
523.970
524.050
524.130
524.326
524.522
524.647
524.699
524.910
525.070
525.242
525.426
525.610
525.794
525.978
526.189
526.429
526.669
526.866
527.062
527.232
527.376
527.520
527.747
527.975
527.874
527.434
526.994
GROUND LEVEL
Lithotype BASALT
Scale:
10 10 20 30 40 50m
Highly Fractured /
1 : 1000
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
19.70
20.10
20.70
21.40
22.10
23.00
23.70
24.30
25.10
24.30
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE WEAK ROCK 5 - 25
RVNL APPROVAL
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
Design Consultant
? WATER TABLE
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT TÜMAŞ
TUNNEL
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
NOTES:-
356 °N 176 °N 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
560 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE D
MATCH LINE E
550
BHE-11
BHE-10
42.00M
540
42.00M
BHE-12
41.00M
530
? ? ? ? ? ? ?
520 ? ?
? ? ? ?
?
510
? ? ? ?
?
500
? ESCAPE TUNNEL
490 ? ?
470
460
450
59+500
59+520
59+540
59+560
59+580
59+600
59+620
59+640
59+660
59+680
59+700
59+720
59+740
59+760
59+780
59+800
59+820
59+840
59+860
59+880
59+900
59+920
59+940
59+960
59+980
60+020
60+040
60+000
CHAINAGE
526.741
526.081
523.711
525.211
526.711
526.994
526.848
526.704
526.653
526.697
526.784
526.827
526.835
526.807
526.779
526.513
526.245
526.025
525.969
526.068
526.168
526.209
526.189
526.169
524.898
523.619
526.862
527.004
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Shear Zone
POTENTIAL
HAZARDS
24.10
24.50
24.80
25.00
24.50
24.60
25.10
25.30
23.00
26.30
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE WEAK ROCK 5 - 25
RVNL APPROVAL
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
Design Consultant
? WATER TABLE
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT TÜMAŞ
TUNNEL
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 CURVE 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
560
MATCH LINE F
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE E
550
BHE-16
49.00M
BHE-14
BHE-15
BHE-13
48.00M
44.00M
46.00M
540
530
? ? ?
? ?
? ? ? ?
? ?
520 ?
? ?
510 ? ?
? ?
? ?
500
ESCAPE TUNNEL
490
470
460
450
60+040
60+060
60+080
60+100
60+120
60+140
60+160
60+180
60+200
60+220
60+240
60+260
60+280
60+300
60+320
60+340
60+360
60+380
60+400
60+420
60+440
60+460
60+480
60+500
60+520
60+540
60+560
60+580
CHAINAGE
527.191
529.201
529.181
529.311
527.004
527.425
527.659
527.804
527.948
528.105
528.275
528.445
528.657
528.869
529.006
529.066
529.126
529.244
529.362
529.349
529.053
529.488
529.712
529.936
530.195
530.455
530.640
530.748
GROUND LEVEL
Lithotype BASALT
Scale:
Highly Fractured / 10 10 20 30 40 50m
1 : 1000
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
27.70
28.30
29.00
30.00
30.10
30.70
30.50
31.20
32.00
32.80
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE WEAK ROCK 5 - 25
RVNL APPROVAL
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
Design Consultant
? WATER TABLE
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT TÜMAŞ
TUNNEL
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 CURVE 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
MATCH LINE G
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
560
MATCH LINE F
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
BHE-20
59.00M
550
56.00M
BHE-19
BHE-18
54.00M
BHE-17
51.00M
540
? ?
? ? ?
530 ? ?
? ?
? ?
520 ? ?
?
? ?
510 ? ?
? ? ?
?
500
ESCAPE TUNNEL
490
470
460
450
61+000
60+580
60+600
60+620
60+640
60+660
60+680
60+700
60+720
60+740
60+760
60+780
60+800
60+820
60+840
60+860
60+880
60+900
60+920
60+940
60+960
60+980
61+020
61+040
61+060
61+080
61+100
61+120
CHAINAGE
534.521
535.641
537.181
530.748
530.856
531.006
531.155
531.312
531.476
531.640
531.982
532.324
532.543
532.635
532.727
533.050
533.374
533.692
534.004
534.316
534.725
534.989
535.315
535.985
536.329
536.637
536.909
537.485
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Shear Zone
POTENTIAL
HAZARDS
33.90
34.50
35.60
36.00
37.10
38.10
38.90
40.00
41.00
42.00
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE WEAK ROCK 5 - 25
RVNL APPROVAL
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
Design Consultant
? WATER TABLE
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT TÜMAŞ
TUNNEL
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
580 NOTES:-
MATCH LINE H
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 CURVE 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
MATCH LINE G
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
560
BHE-23
70.00M
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
BHE-22
68.00M
BHE-21
62.00M
BHE-20
59.00M
550
?
540 ? ?
? ? ?
? ?
? ?
530 ?
? ?
520
? ?
510 ? ?
? ?
500 ?
480
FORMATION LEVEL
470
460
450
61+120
61+140
61+160
61+180
61+200
61+220
61+240
61+260
61+280
61+300
61+320
61+340
61+360
61+380
61+400
61+420
61+440
61+460
61+480
61+500
61+520
61+540
61+560
61+580
61+600
61+620
61+640
61+660
CHAINAGE
538.721
541.731
538.902
539.082
544.302
561.272
537.485
537.789
538.097
538.409
539.363
539.749
540.135
540.666
541.198
542.265
542.799
543.324
543.848
544.150
544.226
543.866
543.426
544.188
546.184
548.180
552.533
556.903
GROUND LEVEL
Lithotype BASALT
Scale:
Highly Fractured / 10 10 20 30 40 50m
1 : 1000
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
44.00
44.60
45.80
47.40
49.00
50.50
51.00
50.10
55.30
66.50
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE WEAK ROCK 5 - 25
RVNL APPROVAL
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
Design Consultant
? WATER TABLE
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT TÜMAŞ
TUNNEL
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
190 °N 600 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
MATCH LINE I
101.00M
BHE-25
590 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
BHE-24
98.00M
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
580
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE H
570 ?
? ?
560 ? ? ? ?
? ?
?
550 ?
? ? ? ?
540
?
530
? ? ?
?
520
?
510
500
490
ESCAPE TUNNEL
480
FORMATION LEVEL
470
460
450
62+000
61+660
61+680
61+700
61+720
61+740
61+760
61+780
61+800
61+820
61+840
61+860
61+880
61+900
61+920
61+940
61+960
61+980
62+020
62+040
62+060
62+080
62+100
62+120
62+140
62+160
62+180
62+200
CHAINAGE
570.011
557.311
559.561
575.181
561.272
565.642
572.656
575.290
577.924
580.558
583.192
578.712
574.184
569.656
565.128
560.600
559.759
558.943
558.127
556.495
557.509
558.535
560.587
561.613
564.993
568.389
571.785
578.577
GROUND LEVEL
Lithotype
Project
Highly Fractured /
GEOLOGICAL
Shear Zone Detailed Design Consultancy for Tunnel and Viaduct including
POTENTIAL
HAZARDS
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
77.70
84.50
91.30
80.30
69.30
67.40
65.60
68.50
71.30
80.00
88.80
Gound Cover (m)
LEGEND
RQD RVNL APPROVAL
CORE RECOVERY
COMPLETED BORE HOLE STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
WEAK ROCK 5 - 25
IN PROGRESS MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250 Design Consultant
? WATER TABLE
TÜMAŞ
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
TUNNEL
GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT India
ANTICIPATED LITHO CONTACT/ Drawn by Issued by Checked by Approved by
? ANTICIPATED ROCK LINE
Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
OVERBURDEN ROCK MASS CLASSIFICATION (RMR)
S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
1 61-80 II SC II 41 Drawing Title
2 41-60 III SC II / SC III 33
BLACK SOIL 3 21-40 IV SC IV 15
4 <20 V SC V 11 GEOLOGICAL L-SECTION OF TUNNEL - 2
(ESCAPE TUNNEL)
BASALT ROCK MASS (SHEET 9 OF 17)
Revision
HIGHLY WEATHERED ROCK MASS
Drawing No. 0
PREPARED BY :- KM Sakshi
660
MATCH LINE J
190 °N 10°N NOTES:-
650 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
640 3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
155.00M
BHE-28
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
146.00M
NSL
BHE-27
630
620 TUNNEL -2
124.00M
BHE-26
610
?
600 ?
MATCH LINE I
590
580 ?
?
570 ?
?
? ? ?
560 ?
550
540
?
530
520
510
500
490
ESCAPE TUNNEL
480
460
450
62+200
62+220
62+240
62+260
62+280
62+300
62+320
62+340
62+360
62+380
62+400
62+420
62+440
62+460
62+480
62+500
62+520
62+540
62+560
62+580
62+600
62+620
62+640
62+660
62+680
62+700
62+720
62+740
CHAINAGE
592.601
616.340
618.612
617.390
629.564
638.704
578.577
581.385
584.189
586.993
589.797
595.819
599.039
602.259
605.479
608.699
611.889
614.178
618.039
618.207
618.375
618.267
620.406
624.423
634.705
638.107
638.406
639.003
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Scale:
Ground Type GT-1 10 10 20 30 40 50m
1 : 1000
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
Rock Mass Behaviour Type
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
RVNL APPROVAL
Tunnel Support Class SC II
103.20
111.50
119.80
126.70
130.00
130.70
132.60
144.50
151.00
88.80
96.00
Design Consultant
TÜMAŞ
LEGEND STRENGTH INDEX
LEGEND DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
RQD WEAK ROCK 5 - 25 India
MEDIUM STRONG 25 - 50
COMPLETED BORE HOLE OVERBURDEN Drawn by Issued by Checked by Approved by
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
660
MATCH LINE J
190 °N 10°N NOTES:-
173.00M
BHE-30
170.00M
BHE-29
650 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
MATCH LINE K
640 3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
159.00M
? ?
BHE-31
? 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
630
147.00M
?
BHE-32
620
610 ?
? ? TUNNEL -2
?
600
?
590 ?
580 ?
? ?
? ?
570 ?
? ?
560 ? ? ?
? ?
550
540
530
520
510
500
490
470
FORMATION LEVEL
460
450
63+000
62+740
62+760
62+780
62+800
62+820
62+840
62+860
62+880
62+900
62+920
62+940
62+960
62+980
63+020
63+040
63+060
63+080
63+100
63+120
63+140
63+160
63+180
63+200
63+220
63+240
63+260
63+280
CHAINAGE
639.301
628.351
623.811
609.461
603.401
639.003
639.599
639.915
640.249
640.582
640.916
641.249
641.583
641.917
639.755
636.763
633.772
630.780
626.748
625.145
624.314
624.062
623.194
621.250
619.306
617.362
615.418
613.474
GROUND LEVEL
Lithotype Scale:
10 10 20 30 40 50m
Ground Type GT-1 1 : 1000
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
Rock Mass Behaviour Type
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
RVNL APPROVAL
Tunnel Support Class SC II
152.00
153.00
154.10
155.20
152.10
150.00
140.30
138.70
137.10
132.50
128.00
Gound Cover (m)
Design Consultant
TÜMAŞ
LEGEND STRENGTH INDEX
LEGEND DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
RQD WEAK ROCK 5 - 25 India
MEDIUM STRONG 25 - 50
COMPLETED BORE HOLE OVERBURDEN Drawn by Issued by Checked by Approved by
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
190 °N 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
660 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
650
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE K
MATCH LINE L
640
155.00M
630
139.00M
BHE-33
620
140.00M
BHE-35
135.00M
BHE-34
610 ?
600 ?
? TUNNEL -2
590
?
? ?
580
?
?
? ? ?
570 ? ?
?
560
?
550
540
530
520
510
500
490
470
FORMATION LEVEL
460
450
63+280
63+300
63+320
63+340
63+360
63+380
63+400
63+420
63+440
63+460
63+480
63+500
63+520
63+540
63+560
63+580
63+600
63+620
63+640
63+660
63+680
63+700
63+720
63+740
63+760
63+780
63+800
63+820
CHAINAGE
603.401
604.041
611.551
615.421
597.342
611.674
605.750
612.634
592.649
599.979
606.696
595.104
586.166
585.540
591.389
597.238
601.976
601.326
597.754
604.378
615.688
616.958
602.435
598.866
610.807
605.075
610.446
617.697
GROUND LEVEL
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
Anticipated Rock class II
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
120.00
111.20
104.80
118.60
117.60
133.00
131.00
116.50
130.00
128.50
Gound Cover (m) Design Consultant
TÜMAŞ
LEGEND STRENGTH INDEX
LEGEND DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
RQD WEAK ROCK 5 - 25 India
MEDIUM STRONG 25 - 50
COMPLETED BORE HOLE OVERBURDEN Drawn by Issued by Checked by Approved by
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
190 °N 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
MATCH LINE L
640
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
158.00M
155.00M
BHE-36
BHE-37
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
630
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE M
620
? ?
610
600 ?
? ?
590
?
580 ?
?
?
570 ?
?
560
?
550 ?
540 ?
?
530
?
520
510
500
490
?
480
ESCAPE TUNNEL
470
FORMATION LEVEL
460
450
64+000
63+820
63+840
63+860
63+880
63+900
63+920
63+940
63+960
63+980
64+020
64+040
64+060
64+080
64+100
64+120
64+140
64+160
64+180
64+200
64+220
64+240
64+260
64+280
64+300
64+320
64+340
64+360
CHAINAGE
608.741
600.121
596.201
611.382
617.697
623.818
624.576
624.437
623.157
621.878
620.598
621.168
621.878
622.589
622.934
622.778
622.215
620.136
618.057
615.978
613.779
606.220
604.156
602.107
598.187
592.185
584.599
578.826
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Project
Anticipated RMR Values 41-60
Detailed Design Consultancy for Tunnel and Viaduct including
PROPERTIES
ROCK MASS
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
Rock Mass Behaviour Type RMT-I
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
141.70
139.60
141.70
142.00
137.60
132.40
126.30
121.40
116.80
100.70
Gound Cover (m)
Design Consultant
TÜMAŞ
LEGEND STRENGTH INDEX
LEGEND DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
RQD WEAK ROCK 5 - 25 India
MEDIUM STRONG 25 - 50
COMPLETED BORE HOLE OVERBURDEN Drawn by Issued by Checked by Approved by
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
640
190 °N 10°N NOTES:-
630 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
MATCH LINE N
MATCH LINE M
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
136.00M
610
BHE-39
600
590
112.00M
BHE-38
580 ?
? ?
570
?
560 ? ? ? ?
550 ?
?
540 ? ?
? ? ?
?
530
?
520
510
?
500
490
480
ESCAPE TUNNEL
470
450
64+360
64+380
64+400
64+420
64+440
64+460
64+480
64+500
64+520
64+540
64+560
64+580
64+600
64+620
64+640
64+660
64+680
64+700
64+720
64+740
64+760
64+780
64+800
64+820
64+840
64+860
64+880
64+900
CHAINAGE
554.531
548.091
566.051
578.826
575.027
573.966
573.533
575.750
578.199
579.402
577.509
572.139
565.413
559.104
549.768
560.519
561.910
567.057
570.179
569.029
571.690
581.360
589.754
592.889
594.127
595.138
596.000
596.000
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Anticipated Rock class III III Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore)
Rock Mass Behaviour Type RMT-I
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
112.80
118.00
120.00
95.00
98.30
99.10
83.70
70.20
81.50
89.60
93.20
Gound Cover (m) RVNL APPROVAL
Design Consultant
TÜMAŞ
LEGEND STRENGTH INDEX
LEGEND DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
RQD WEAK ROCK 5 - 25 India
MEDIUM STRONG 25 - 50
COMPLETED BORE HOLE OVERBURDEN Drawn by Issued by Checked by Approved by
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
640
190 °N 10°N NOTES:-
630 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
MATCH LINE N
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
137.00M
610
BHE-40
NSL
600
590 ? ?
?
580
? ? ?
570
? ?
MATCH LINE O
560
550
? ?
540
?
?
530
520
510
500
490
480
460
FORMATION LEVEL
450
T2-BH110
64+900
64+920
64+940
64+960
64+980
65+020
65+040
65+060
65+080
65+100
65+120
65+140
65+160
65+180
65+200
65+220
65+240
65+260
65+280
65+300
65+320
65+340
65+360
65+380
65+400
65+420
65+440
65+000
119.00M
CHAINAGE
596.000
596.000
596.000
596.000
596.000
596.000
596.000
595.859
595.587
595.315
595.043
594.770
594.498
589.725
582.654
577.272
574.902
574.046
568.189
560.528
552.867
545.175
539.557
534.458
527.946
521.033
515.067
508.322
GROUND LEVEL
Lithotype BASALT
Anticipated Rock class III III Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore)
Rock Mass Behaviour Type RMT-I
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
120.00
120.10
120.00
119.60
118.10
102.30
97.30
78.40
62.80
47.10
Gound Cover (m) RVNL APPROVAL
Design Consultant
TÜMAŞ
LEGEND STRENGTH INDEX
LEGEND DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
RQD WEAK ROCK 5 - 25 India
MEDIUM STRONG 25 - 50
COMPLETED BORE HOLE OVERBURDEN Drawn by Issued by Checked by Approved by
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
190 °N 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
610 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
600
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
590
580
570
MATCH LINE O
560
550
540
530
MATCH LINE P
520
510
500
490
480
470
ESCAPE TUNNEL
460
FORMATION LEVEL
450
65+440
65+460
65+480
65+500
65+520
65+540
65+560
65+580
65+600
65+620
65+640
65+660
65+680
65+700
65+720
65+740
65+760
65+780
65+800
65+820
65+840
65+860
65+880
65+900
65+920
65+940
65+960
65+980
CHAINAGE
484.222
499.662
497.142
496.032
481.002
496.319
491.896
489.545
487.458
486.395
482.384
481.306
479.276
478.165
478.909
482.000
480.009
485.273
491.130
495.510
491.374
485.099
479.713
480.000
508.322
501.984
500.837
500.172
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Scale:
Anticipated RMR Values 21-40 <20 21-40 <20 10 10 20 30 40 50m
1 : 1000
PROPERTIES
ROCK MASS
Rock Mass Behaviour Type RMT-I Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
Highly Fractured /
electrified new BG railway line between Mangliya Gaon (Indore)
to Budni stations (198 KMs) of West Central Railway and Western
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
Anticipated Ground DAMP TO WET DAMP TO DRIPPING DAMP TO WET DAMP TO WET
Water Condition
6.50
8.80
31.20
23.00
15.20
11.30
10.50
27.70
24.30
20.00
Gound Cover (m)
RVNL APPROVAL
IN PROGRESS
BLACK SOIL India
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT Drawn by Issued by Checked by Approved by
GT-2 MODERATELY WEATHERED BASALT
? WATER TABLE GT-3 HIGHLY WEATHERED BASALT
BASALT ROCK MASS
Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
TUNNEL
RED BOLE ROCK MASS ROCK MASS CLASSIFICATION (RMR)
Drawing Title
S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
1 61-80 II SC II 41
?
ANTICIPATED LITHO CONTACT/
ANTICIPATED ROCK LINE
2 41-60 III SC II / SC III 33 GEOLOGICAL L-SECTION OF TUNNEL - 2
HIGHLY WEATHERED ROCK MASS 3 21-40 IV SC IV 15
4 <20 V SC V 11 (ESCAPE TUNNEL)
(SHEET 16 OF 17)
Released For
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
190 °N 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
560
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
530
MATCH LINE P
520
500
490
480
470
ESCAPE TUNNEL
460
66+020
66+040
66+060
66+080
66+100
66+120
66+140
66+160
66+180
66+200
66+220
66+240
66+260
66+280
66+300
66+320
66+340
CHAINAGE
480.000
482.242
477.840
474.074
472.734
470.000
469.920
468.532
469.254
471.022
471.112
473.654
473.000
471.514
472.306
472.983
470.875
470.705
472.063
GROUND LEVEL
Lithotype BASALT
Highly Fractured /
GEOLOGICAL
HAZARDS
10 10 20 30 40 50m
Anticipated Ground DAMP TO WET 1 : 1000
Water Condition
Project
Tunnel Support Class SC V
Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
3.30
11.30
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\03. TU-ER-JV-IB-FD-ET-GS- Escape Tunnel.dwg
LEGEND STRENGTH INDEX
LEGEND DESCRIPTION APPROXIMATE UCS (MPa)
RQD WEAK ROCK 5 - 25 RVNL APPROVAL
CORE RECOVERY MEDIUM STRONG 25 - 50
COMPLETED BORE HOLE OVERBURDEN STRONG ROCK 50 - 100
VERY STRONG 100 - 250
IN PROGRESS
BLACK SOIL
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT Design Consultant
GT-2 MODERATELY WEATHERED BASALT
? WATER TABLE GT-3 HIGHLY WEATHERED BASALT
BASALT ROCK MASS
TÜMAŞ
TUNNEL
RED BOLE ROCK MASS ROCK MASS CLASSIFICATION (RMR)
S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%) India
1 61-80 II SC II 41
ANTICIPATED LITHO CONTACT/ III SC II / SC III Drawn by Issued by Checked by Approved by
2 41-60 33
? ANTICIPATED ROCK LINE HIGHLY WEATHERED ROCK MASS 3 21-40 IV SC IV 15
4 <20 V SC V 11
Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
Drawing Title
Released For
Revision
Drawing No. 0
PREPARED BY :- KM Sakshi
570 NOTES:-
356 °N 176 °N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
560 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
550
MATCH LINE A
MATCH LINE B
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
540
BHM-02
27.00M
530
520 ?
? ? ?
? ?
? ? ? ? ?
510 ?
TUNNEL 2
500
490
FORMATION LEVEL
480
470
460
450
57+880
57+900
57+920
57+940
57+960
57+980
58+020
58+040
58+060
58+080
58+100
58+120
58+140
58+160
58+180
58+200
58+220
58+240
58+260
58+280
58+300
58+320
58+340
58+360
58+380
58+400
58+000
CHAINAGE
519.261
519.346
519.319
519.414
519.510
519.577
519.613
519.649
519.677
519.705
519.747
519.803
519.859
519.982
520.106
520.175
520.187
520.199
519.119
518.032
518.069
520.453
520.749
521.040
521.210
521.256
521.302
GROUND LEVEL
Lithotype BASALT
HAZARDS
1 : 1000
Anticipated Ground DAMP TO WET
Water Condition
Project
Tunnel Support Class SC V SC IV
Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
8.70
9.20
9.50
9.90
8.60
10.20
10.80
11.10
11.80
12.80
13.20
Gound Cover (m) electrified new BG railway line between Mangliya Gaon (Indore)
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
LEGEND
RQD
CORE RECOVERY
COMPLETED BORE HOLE
RVNL APPROVAL
IN PROGRESS
STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
? WATER TABLE WEAK ROCK 5 - 25
MEDIUM STRONG 25 - 50 Design Consultant
STRONG ROCK 50 - 100
VERY STRONG 100 - 250
TUNNEL
TÜMAŞ
ANTICIPATED LITHO CONTACT/ GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
? ANTICIPATED ROCK LINE GT-2 MODERATELY WEATHERED BASALT
GT-3 HIGHLY WEATHERED BASALT India
Drawn by Issued by Checked by Approved by
OVERBURDEN
ROCK MASS CLASSIFICATION (RMR) Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
BLACK SOIL 1 61-80 II SC II 41
2 41-60 III SC II / SC III 33
Drawing Title
3 21-40 IV SC IV 15
4 <20 V SC V 11
BASALT ROCK MASS GEOLOGICAL L-SECTION OF TUNNEL - 2
(MAIN TUNNEL)
(SHEET 2 OF 17)
RED BOLE ROCK MASS
Revision
Drawing No.
PREPARED BY :- KM Sakshi
NOTES:-
356 °N 590 176 °N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
580
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
570
560
550
MATCH LINE C
MATCH LINE B
540
BHM-05
BHM-04
BHM-03
34.00M
32.00M
31.00M
530
520 ? ? ? ? ?
? ? ? ?
? ? ? ?
? ?
510
TUNNEL 2 ?
500
?
490
470
460
450
58+400
58+420
58+440
58+460
58+480
58+500
58+520
58+540
58+560
58+580
58+600
58+620
58+640
58+660
58+680
58+700
58+720
58+740
58+760
58+780
58+800
58+820
58+840
58+860
58+880
58+900
58+920
58+940
CHAINAGE
522.051
522.011
521.971
522.521
523.711
521.302
521.383
521.465
521.590
521.758
521.926
521.984
522.042
522.118
522.266
522.377
522.449
522.664
522.808
522.952
523.096
523.240
523.356
523.472
523.567
523.639
523.798
523.886
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Scale:
10 10 20 30 40 50m
Rock Mass Behaviour Type RMT-I
1 : 1000
Shear Zone
POTENTIAL
HAZARDS
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
13.20
13.60
14.30
14.70
14.80
15.40
15.90
16.50
17.10
17.60
18.00
Gound Cover (m)
LEGEND
RQD
CORE RECOVERY
COMPLETED BORE HOLE RVNL APPROVAL
IN PROGRESS
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No.
PREPARED BY :- KM Sakshi
590
NOTES:-
356 °N 176 °N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
580 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
570 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
560
MATCH LINE D
550
MATCH LINE C
BHM-09
41.00M
BHM-08
540
BHM-07
39.00M
BHM-06
37.00M
35.00M
530
? ? ?
? ?
?
520 ? ?
? ?
? ? ? ?
?
510
? ?
? TUNNEL 2
500
490 ? ?
FORMATION LEVEL
480
470
460
450
58+940
58+960
58+980
59+000
59+020
59+040
59+060
59+080
59+100
59+120
59+140
59+160
59+180
59+200
59+220
59+240
59+260
59+280
59+300
59+320
59+340
59+360
59+380
59+400
59+420
59+440
59+460
59+480
CHAINAGE
524.751
524.522
525.242
527.062
527.232
523.886
523.970
524.050
524.130
524.326
524.647
524.699
524.910
525.070
525.426
525.610
525.794
525.978
526.189
526.429
526.669
526.866
527.376
527.520
527.747
527.975
527.874
527.434
GROUND LEVEL
Lithotype BASALT
Scale:
Rock Mass Behaviour Type RMT-I
10 10 20 30 40 50m
1 : 1000
Highly Fractured /
GEOLOGICAL
HAZARDS
18.90
19.70
20.10
20.70
21.40
22.10
23.00
23.70
24.30
25.10
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
Gound Cover (m)
LEGEND
RQD
CORE RECOVERY
COMPLETED BORE HOLE RVNL APPROVAL
IN PROGRESS
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No.
PREPARED BY :- KM Sakshi
NOTES:-
356 °N 176 °N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
570
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
560
MATCH LINE D
MATCH LINE E
550
BHM-10
BHM-11
41.00M
BHM-13
540
BHM-12
42.00M
43.00M
42.00M
530
? ? ?
?
520 ? ? ? ?
?
? ? ? ?
510
? ? ?
?
500 TUNNEL-2
490
470
460
450
59+480
59+500
59+520
59+540
59+560
59+580
59+600
59+620
59+640
59+660
59+680
59+700
59+720
59+740
59+760
59+780
59+800
59+820
59+840
59+860
59+880
59+900
59+920
59+940
59+960
59+980
60+020
60+000
CHAINAGE
526.741
526.081
523.711
525.211
526.711
527.434
526.994
526.704
526.784
526.862
526.848
526.653
526.697
526.827
526.835
526.807
526.779
526.513
526.245
526.025
525.969
526.068
526.168
526.209
526.189
526.169
524.898
523.619
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
RMT-I
Scale:
Rock Mass Behaviour Type
10 10 20 30 40 50m
1 : 1000
Highly Fractured /
GEOLOGICAL
HAZARDS
Anticipated Ground DAMP TO WET Detailed Design Consultancy for Tunnel and Viaduct including
Water Condition
Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore)
Tunnel Support Class SC III SC II / SC III SC III
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
24.30
24.10
24.50
24.80
25.00
24.50
24.60
25.10
25.30
23.00
26.30
Gound Cover (m)
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
LEGEND
RQD
CORE RECOVERY
COMPLETED BORE HOLE RVNL APPROVAL
IN PROGRESS
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No.
PREPARED BY :- KM Sakshi
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
570 CURVE 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
560
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE F
MATCH LINE E
550
BHM-16
BHM-15
BHM-14
47.00M
48.00M
540
45.00M
530
? ? ? ? ?
? ? ? ?
? ?
520 ? ?
510
? ?
?
500
TUNNEL-2
490
480
FORMATION LEVEL
470
460
450
60+020
60+040
60+060
60+080
60+100
60+120
60+140
60+160
60+180
60+200
60+220
60+240
60+260
60+280
60+300
60+320
60+340
60+360
60+380
60+400
60+420
60+440
60+460
60+480
60+500
60+520
60+540
60+560
CHAINAGE
527.191
529.201
529.181
529.311
526.862
527.004
527.659
527.804
527.948
528.657
528.869
529.006
529.066
529.126
529.244
529.362
529.349
529.053
529.488
529.712
529.936
530.640
527.425
528.105
528.275
528.445
530.195
530.455
GROUND LEVEL
Lithotype BASALT
Scale:
Highly Fractured /
10 10 20 30 40 50m
GEOLOGICAL
Shear Zone
POTENTIAL
1 : 1000
HAZARDS
27.70
28.30
29.00
30.00
30.10
30.70
30.50
31.20
32.00
32.80
Gound Cover (m)
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
LEGEND
RQD
CORE RECOVERY
COMPLETED BORE HOLE RVNL APPROVAL
IN PROGRESS
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No.
PREPARED BY :- KM Sakshi
NOTES:-
570
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
MATCH LINE G
CURVE 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
560
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
MATCH LINE F
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
550
BHM-20
58.00M
BHM-19
55.00M
BHM-18
53.00M
BHM-17
50.00M
540
? ?
?
530 ? ? ? ?
? ?
? ?
? ? ? ? ? ?
520 ? ?
510 ?
500
TUNNEL 2
490
480
FORMATION LEVEL
470
460
450
61+000
60+560
60+580
60+600
60+620
60+640
60+660
60+680
60+700
60+720
60+740
60+760
60+780
60+800
60+820
60+840
60+860
60+880
60+900
60+920
60+940
60+960
60+980
61+020
61+040
61+060
61+080
61+100
CHAINAGE
534.521
535.641
537.181
530.640
530.748
530.856
531.006
531.155
531.312
531.476
531.640
531.982
532.324
532.543
532.635
532.727
533.050
533.374
533.692
534.004
534.316
534.725
534.989
535.315
535.985
536.329
536.637
536.909
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
HAZARDS
1 : 1000
Anticipated Ground DAMP TO WET
Water Condition
Project
Tunnel Support Class SC II / SC III SC II Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore)
33.20
33.90
34.50
35.60
36.00
37.10
38.10
38.90
40.00
41.00
42.00
Gound Cover (m)
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
LEGEND
RQD
CORE RECOVERY
COMPLETED BORE HOLE RVNL APPROVAL
IN PROGRESS
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No.
PREPARED BY :- KM Sakshi
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
MATCH LINE H
580
CURVE 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
BHM-24
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
570
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE G
BHM-23
560
68.00M
BHM-22
64.00M
BHM-21
61.00M
550
? ?
540 ? ? ? ? ?
? ? ? ?
? ? ? ? ?
? ?
530 ? ? ? ?
?
?
520
510 ?
?
500 ?
490 TUNNEL 2
480
460
450
61+100
61+120
61+140
61+160
61+180
61+200
61+220
61+240
61+260
61+280
61+300
61+320
61+340
61+360
61+380
61+400
61+420
61+440
61+460
61+480
61+500
61+520
61+540
61+560
61+580
61+600
61+620
61+640
CHAINAGE
537.181
538.721
541.731
538.902
539.082
540.666
543.324
544.150
544.226
544.302
543.866
543.426
546.184
548.180
537.485
537.789
538.097
538.409
539.363
539.749
540.135
541.198
542.265
542.799
543.848
544.188
552.533
556.903
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Shear Zone
POTENTIAL
HAZARDS
Project
Anticipated Ground DAMP TO WET Detailed Design Consultancy for Tunnel and Viaduct including
Water Condition
Geotechnical Investigation in connection with Construction of
SC II
electrified new BG railway line between Mangliya Gaon (Indore)
Tunnel Support Class
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
42.00
42.90
44.00
44.60
45.80
47.40
49.00
50.50
51.00
50.10
55.30
Gound Cover (m)
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
LEGEND
RQD
CORE RECOVERY
COMPLETED BORE HOLE RVNL APPROVAL
IN PROGRESS
OVERBURDEN Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
Released For
HIGHLY WEATHERED ROCK MASS
Revision
Drawing No.
PREPARED BY :- KM Sakshi
190 °N 610 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
600
T2-BH76
108.00M
MATCH LINE I
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
590
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
T2-BH75
95.00M
MATCH LINE H
580
BHM-25
T2-BH79
T2-BH77
88.00M
?
88.00M
86.00M
BHM-24
T2-BH78
84.00M
570
83.00M
? ?
? ?
?
560 ?
? ?
? ?
? ? ? ? ?
550 ?
?
540
?
530
? ?
520
510
500
490
TUNNEL 2
480
460
450
62+000
61+640
61+660
61+680
61+700
61+720
61+740
61+760
61+780
61+800
61+820
61+840
61+860
61+880
61+900
61+920
61+940
61+960
61+980
62+020
62+040
62+060
62+080
62+100
62+120
62+140
62+160
62+180
CHAINAGE
570.011
557.311
559.561
575.181
556.903
561.272
565.642
572.656
575.290
577.924
580.558
583.192
578.712
574.184
569.656
565.128
560.600
559.759
558.943
558.127
557.509
560.587
561.613
564.993
568.389
556.495
558.535
571.785
GROUND LEVEL
Lithotype BASALT
Scale:
Anticipated Rock class II
10 10 20 30 40 50m
1 : 1000
Shear Zone
POTENTIAL
HAZARDS
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
Tunnel Support Class SC II
66.50
77.70
84.50
91.30
80.30
69.30
67.40
65.60
68.50
71.30
80.00
Gound Cover (m)
LEGEND
RVNL APPROVAL
RQD
CORE RECOVERY
COMPLETED BORE HOLE
IN PROGRESS
STRENGTH INDEX Design Consultant
DESCRIPTION APPROXIMATE UCS (MPa)
WEAK ROCK 5 - 25
? WATER TABLE MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100 TÜMAŞ
VERY STRONG 100 - 250
TUNNEL
India
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT Drawn by Issued by Checked by Approved by
ANTICIPATED LITHO CONTACT/ GT-2 MODERATELY WEATHERED BASALT
? ANTICIPATED ROCK LINE GT-3 HIGHLY WEATHERED BASALT
Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
OVERBURDEN
ROCK MASS CLASSIFICATION (RMR)
Drawing Title
S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
1 61-80 II SC II 41
BLACK SOIL 2 41-60 III SC II / SC III 33 GEOLOGICAL L-SECTION OF TUNNEL - 2
3 21-40 IV SC IV 15
4 <20 V SC V 11 (MAIN TUNNEL)
BASALT ROCK MASS (SHEET 9 OF 17)
Revision
HIGHLY WEATHERED ROCK MASS Drawing No.
PREPARED BY :- KM Sakshi
MATCH LINE J
168.00M
BHM-29
190 °N 650 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
640 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
BHM-28
148.00M
630 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
?
137.00M
BHM-27
620
610 ?
?
600
113.00M
BHM-26
MATCH LINE I
T2-BH80
106.00M
590 ?
?
580 ?
? ?
570 ?
? ? ?
?
560 ?
? ?
550
540 ? ?
? ?
? ?
530
520
510
500
490
TUNNEL 2
480
470
FORMATION LEVEL
460
450
62+180
62+200
62+220
62+240
62+260
62+280
62+300
62+320
62+340
62+360
62+380
62+400
62+420
62+440
62+460
62+480
62+500
62+520
62+540
62+560
62+580
62+600
62+620
62+640
62+660
62+680
62+700
62+720
CHAINAGE
575.181
592.601
578.577
586.993
589.797
602.259
605.479
608.699
611.889
614.178
616.340
618.039
618.207
618.612
618.267
617.390
620.406
624.423
629.564
638.107
638.406
638.704
581.385
584.189
595.819
599.039
618.375
634.705
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Project
Anticipated RMR Values 61-80 Detailed Design Consultancy for Tunnel and Viaduct including
PROPERTIES
ROCK MASS
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
96.00
103.20
111.50
119.80
126.70
130.00
130.70
132.60
144.50
151.00
Gound Cover (m)
Design Consultant
TÜMAŞ
LEGEND LEGEND STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
RQD WEAK ROCK 5 - 25
CORE RECOVERY
COMPLETED BORE HOLE OVERBURDEN MEDIUM STRONG 25 - 50
India
STRONG ROCK 50 - 100 Drawn by Issued by Checked by Approved by
VERY STRONG 100 - 250
IN PROGRESS
BLACK SOIL Pooja Swami Rishi Sharma Hari Anand
Shanti Rawat Halit Bakirci
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
? WATER TABLE GT-3 HIGHLY WEATHERED BASALT
BASALT ROCK MASS Drawing Title
Released For
Revision
Drawing No.
PREPARED BY :- KM Sakshi
660
190 °N NOTES:-
171.00M
BHM-30
10°N
MATCH LINE J
650
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
BHM-31
162.00M
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
MATCH LINE K
640
?
154.00M
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
BHM-32
? ?
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
630 ? ?
?
620 ?
? ? ?
610
600
?
?
590
580 ? ? ? ?
?
?
570
? ?
560 ? ?
?
?
550 ?
? ? ?
? ?
540
530
520
510
500
490
TUNNEL 2
480
470
FORMATION LEVEL
460
450
63+000
62+720
62+740
62+760
62+780
62+800
62+820
62+840
62+860
62+880
62+900
62+920
62+940
62+960
62+980
63+020
63+040
63+060
63+080
63+100
63+120
63+140
63+160
63+180
63+200
63+220
63+240
63+260
CHAINAGE
639.301
628.351
623.811
609.461
638.704
639.003
639.599
639.915
640.249
640.582
640.916
641.249
641.583
641.917
639.755
636.763
633.772
630.780
626.748
625.145
624.314
624.062
623.194
621.250
619.306
617.362
615.418
613.474
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Scale:
Ground Type GT-1
10 10 20 30 40 50m
1 : 1000
Rock mass Strength
(UCS) (MPa)
Project
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
Rock Mass Behaviour Type RMT-I
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
153.00
154.10
155.20
152.10
150.00
140.30
138.70
137.10
132.50
128.00
Gound Cover (m)
Design Consultant
TÜMAŞ
LEGEND LEGEND STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
RQD WEAK ROCK 5 - 25
CORE RECOVERY
COMPLETED BORE HOLE OVERBURDEN MEDIUM STRONG 25 - 50
India
STRONG ROCK 50 - 100 Drawn by Issued by Checked by Approved by
VERY STRONG 100 - 250
IN PROGRESS
BLACK SOIL Pooja Swami Rishi Sharma Hari Anand
Shanti Rawat Halit Bakirci
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
? WATER TABLE GT-3 HIGHLY WEATHERED BASALT
BASALT ROCK MASS Drawing Title
Released For
Revision
Drawing No.
PREPARED BY :- KM Sakshi
MATCH LINE K
640
190 °N 10°N NOTES:-
MATCH LINE L
630 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
150.00M
BHM-35
147.00M
BHM-36
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
BHM-33
130.00M
610
? ? ?
BHM-34
122.00M
600 ?
?
590 ? ? ?
?
?
580 ? ? ?
? ?
? ?
?
570 ?
?
?
560
?
550 ?
? ?
540
530
520 ? ? ?
510
500
490
480 TUNNEL -2
470
450
63+260
63+280
63+300
63+320
63+340
63+360
63+380
63+400
63+420
63+440
63+460
63+480
63+500
63+520
63+540
63+560
63+580
63+600
63+620
63+640
63+660
63+680
63+700
63+720
63+740
63+760
63+780
63+800
CHAINAGE
609.461
603.401
604.041
611.551
615.421
597.342
592.649
599.979
606.696
595.104
586.166
585.540
591.389
597.238
601.976
601.326
597.754
604.378
615.688
616.958
611.674
602.435
598.866
605.750
612.634
610.807
605.075
610.446
GROUND LEVEL
Lithotype BASALT
Anticipated Rock class II Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore)
Rock Mass Behaviour Type RMT-I to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
120.00
111.20
104.80
118.60
117.60
133.00
131.00
116.50
130.00
128.50
Gound Cover (m) RVNL APPROVAL
Design Consultant
TÜMAŞ
LEGEND LEGEND STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
RQD WEAK ROCK 5 - 25
CORE RECOVERY
COMPLETED BORE HOLE OVERBURDEN MEDIUM STRONG 25 - 50
India
STRONG ROCK 50 - 100 Drawn by Issued by Checked by Approved by
VERY STRONG 100 - 250
IN PROGRESS
BLACK SOIL Pooja Swami Rishi Sharma Hari Anand
Shanti Rawat Halit Bakirci
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
? WATER TABLE GT-3 HIGHLY WEATHERED BASALT
BASALT ROCK MASS Drawing Title
Released For
Revision
Drawing No.
PREPARED BY :- KM Sakshi
190 °N 640 10°N NOTES:-
BHM-37
159.00M
159.00M
BHM-38
T2-BH99
155.00M
MATCH LINE L
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
630
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
MATCH LINE M
T2-BH100
143.00M
? 3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
BHM-39
143.00M
620 ?
? 4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
T2-BH101
134.00M
610
?
600
?
? ?
590 ?
?
580 ?
? ?
? ? ? ?
? ?
570 ?
560
550
? ? ? ? ?
?
540 ?
?
530
520
510
?
500
490
480
TUNNEL 2
470
450
64+000
63+800
63+820
63+840
63+860
63+880
63+900
63+920
63+940
63+960
63+980
64+020
64+040
64+060
64+080
64+100
64+120
64+140
64+160
64+180
64+200
64+220
64+240
64+260
64+280
64+300
64+320
64+340
CHAINAGE
608.741
600.121
596.201
611.382
610.446
617.697
623.818
624.576
624.437
623.157
621.878
620.598
621.168
621.878
622.589
622.934
622.778
622.215
620.136
618.057
615.978
613.779
606.220
604.156
602.107
598.187
592.185
584.599
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
142.50
141.70
139.60
141.70
142.00
137.60
132.40
126.30
121.40
116.80
Gound Cover (m) RVNL APPROVAL
Design Consultant
TÜMAŞ
LEGEND LEGEND STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
RQD WEAK ROCK 5 - 25
CORE RECOVERY
COMPLETED BORE HOLE OVERBURDEN MEDIUM STRONG 25 - 50
India
STRONG ROCK 50 - 100 Drawn by Issued by Checked by Approved by
VERY STRONG 100 - 250
IN PROGRESS
BLACK SOIL Pooja Swami Rishi Sharma Hari Anand
Shanti Rawat Halit Bakirci
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
? WATER TABLE GT-3 HIGHLY WEATHERED BASALT
BASALT ROCK MASS Drawing Title
Released For
Revision
Drawing No.
PREPARED BY :- KM Sakshi
190 °N 630 10°N NOTES:-
MATCH LINE M
MATCH LINE N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
620 2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
610
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
130.00M
BHM-42
600
118.00M
BHM-40
116.00M
BHM-41
T2-BH102
590
112.00M
?
T2-BH105
107.00M
580 ?
?
? ?
570 ?
? ? ?
T2-BH104
87.00M
? ?
560 ? ?
550
? ? ?
540 ? ?
? ?
? ? ?
530
520
510
?
500
490 ?
480
TUNNEL 2
470
460
FORMATION LEVEL
450
64+340
64+360
64+380
64+400
64+420
64+440
64+460
64+480
64+500
64+520
64+540
64+560
64+580
64+600
64+620
64+640
64+660
64+680
64+700
64+720
64+740
64+760
64+780
64+800
64+820
64+840
64+860
64+880
CHAINAGE
554.531
548.091
566.051
579.402
584.599
578.826
575.027
573.966
573.533
575.750
578.199
577.509
572.139
565.413
559.104
549.768
560.519
561.910
567.057
570.179
569.029
571.690
581.360
589.754
592.889
594.127
595.138
596.000
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Project
Anticipated Rock class III III III
Detailed Design Consultancy for Tunnel and Viaduct including
Geotechnical Investigation in connection with Construction of
Rock Mass Behaviour Type RMT-I
electrified new BG railway line between Mangliya Gaon (Indore)
to Budni stations (198 KMs) of West Central Railway and Western
Highly Fractured / Railway in Madhya Pradesh State, India.
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
Anticipated Ground DAMP TO DRY
Water Condition
112.80
118.00
95.00
98.30
99.10
83.70
70.20
81.50
89.60
93.20
Gound Cover (m)
RVNL APPROVAL
Design Consultant
TÜMAŞ
LEGEND LEGEND STRENGTH INDEX
DESCRIPTION APPROXIMATE UCS (MPa)
RQD WEAK ROCK 5 - 25
CORE RECOVERY
COMPLETED BORE HOLE OVERBURDEN MEDIUM STRONG 25 - 50
India
STRONG ROCK 50 - 100 Drawn by Issued by Checked by Approved by
VERY STRONG 100 - 250
IN PROGRESS
BLACK SOIL Pooja Swami Rishi Sharma Hari Anand
Shanti Rawat Halit Bakirci
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
GT-2 MODERATELY WEATHERED BASALT
? WATER TABLE GT-3 HIGHLY WEATHERED BASALT
BASALT ROCK MASS Drawing Title
Released For
Revision
Drawing No.
PREPARED BY :- KM Sakshi
190 °N 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
630
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
MATCH LINE N
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
620
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
T2-BH109
137.00M
137.00M
BHM-44
610
BHM-43
137.00M
600
T2-BH110
119.00M
590
580 ?
? ?
?
?
T2-BH111
570 ? ?
95.00M
?
MATCH LINE O
?
560 ?
? ?
?
550 ?
?
T2-BH112
540
64.00M
?
530
?
520 ?
?
510 ?
500
490
480
470 TUNNEL 2
460
FORMATION LEVEL
450
T2-BH110
64+880
64+900
64+920
64+940
64+960
64+980
65+020
65+040
65+060
65+080
65+100
65+120
65+140
65+160
65+180
65+200
65+220
65+240
65+260
65+280
65+300
65+320
65+340
65+360
65+380
65+400
65+420
65+000
119.00M
CHAINAGE
577.272
574.902
596.000
596.000
596.000
596.000
596.000
596.000
596.000
596.000
595.859
595.587
595.315
595.043
594.770
594.498
589.725
582.654
574.046
568.189
560.528
552.867
545.175
539.557
534.458
527.946
521.033
515.067
GROUND LEVEL
Lithotype BASALT
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
Highly Fractured /
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
97.30
78.40
62.80
47.10
120.00
120.00
120.10
120.00
119.60
118.10
102.30
Gound Cover (m) RVNL APPROVAL
Design Consultant
Shanti Rawat Pooja Swami Rishi Sharma Hari Anand Halit Bakirci
GT-1 FRESH TO SLIGHTLY WEATHERED BASALT
? WATER TABLE GT-2 MODERATELY WEATHERED BASALT
BASALT ROCK MASS
GT-3 HIGHLY WEATHERED BASALT
Drawing Title
Released For
Revision
Drawing No.
PREPARED BY :- KM Sakshi
190 °N 10°N NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
570
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
MATCH LINE O
560
550
540
530
MATCH LINE P
520
T2-BH116
45.00M
T2-BH113
39.00M
BHM-46
T2-BH117
510
41.00M
37.00M
BHM-45
?
T2-BH114
32.00M
500
28.00M
T2-BH115
23.00M
490 ?
?
? ?
480 ? ?
?
? ? ? ? ? ?
?
470 TUNNEL 2
460
FORMATION LEVEL
450
65+420
65+440
65+460
65+480
65+500
65+520
65+540
65+560
65+580
65+600
65+620
65+640
65+660
65+680
65+700
65+720
65+740
65+760
65+780
65+800
65+820
65+840
65+860
65+880
65+900
65+920
65+940
65+960
CHAINAGE
496.319
491.896
489.545
487.458
486.395
484.222
482.384
481.306
479.276
478.165
478.909
482.000
480.009
485.273
491.130
499.662
497.142
496.032
495.510
491.374
485.099
481.002
479.713
515.067
508.322
501.984
500.837
500.172
GROUND LEVEL
Structural Domain
GEOLOGY
Lithotype
Shear Zone
POTENTIAL
HAZARDS
Project
Anticipated Ground DAMP TO WET DAMP TO DRIPPING DAMP TO WET Detailed Design Consultancy for Tunnel and Viaduct including
Water Condition
Geotechnical Investigation in connection with Construction of
SC IV SC V SC IV SC V
electrified new BG railway line between Mangliya Gaon (Indore)
Tunnel Support Class
to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
7.60
6.50
8.80
31.20
23.00
15.20
11.30
10.50
27.70
24.30
20.00
Gound Cover (m)
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
RVNL APPROVAL
LEGEND LEGEND
STRENGTH INDEX
RQD DESCRIPTION APPROXIMATE UCS (MPa)
CORE RECOVERY
COMPLETED BORE HOLE OVERBURDEN WEAK ROCK 5 - 25
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
VERY STRONG 100 - 250 Design Consultant
IN PROGRESS
BLACK SOIL
India
TUNNEL Drawn by Issued by Checked by Approved by
RED BOLE ROCK MASS ROCK MASS CLASSIFICATION (RMR)
S.N RMR RANGE ROCK CLASS SUPPORT CLASS PERCENTAGE (%)
1 61-80 II SC II 41
ANTICIPATED LITHO CONTACT/ Pooja Swami
? 2 41-60 III SC II / SC III 33 Shanti Rawat Rishi Sharma Hari Anand Halit Bakirci
ANTICIPATED ROCK LINE HIGHLY WEATHERED ROCK MASS
3 21-40 IV SC IV 15
4 <20 V SC V 11
Drawing Title
Released For
Revision
Drawing No.
PREPARED BY :- KM Sakshi
NOTES:-
570 10°N 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE SPECIFIED.
190 °N
2. GEOLOGICAL SECTION HAS BEEN PREPARED BASED ON OUTCROPS PROJECTION, INVESTIGATION DATA (DRILL HOLE).
560 3. THICKNESS OF OVERBURDEN IS BASED ON AVAILABLE DRILL HOLE DATA.
4. ANTICIPATED ROCK MASS CLASSIFICATION IS BASED ON COLLECTION OF FIELD DATA AND INVESTIGATION DATA (DRILL HOLE).
550
540
530
MATCH LINE P
520
BHM-47
20M,19M,17M
28.00M
T2-BH121
490
T2-BH125
T2-BH126
T2-BH124
20.00M
T2-BH123
T2-BH122
20.00M
19.00M
18.00M
17.00M
16.00M
480
?
470 ? ?
TUNNEL 2 ? ? ? ?
? ? ? ?
460
65+980
66+020
66+040
66+060
66+080
66+100
66+120
66+140
66+160
66+180
66+200
66+220
66+240
66+260
66+280
66+300
66+320
66+340
CHAINAGE
479.713
480.000
482.242
477.840
474.074
472.306
472.734
472.983
470.875
470.000
469.920
468.532
469.254
470.705
471.022
471.112
472.063
473.654
473.000
471.514
GROUND LEVEL
Lithotype BASALT
Scale:
Highly Fractured /
10 10 20 30 40 50m
GEOLOGICAL
Shear Zone
POTENTIAL
HAZARDS
1 : 1000
SC V
Detailed Design Consultancy for Tunnel and Viaduct including
Tunnel Support Class
Geotechnical Investigation in connection with Construction of
electrified new BG railway line between Mangliya Gaon (Indore)
3.30
11.30
Gound Cover (m) to Budni stations (198 KMs) of West Central Railway and Western
Railway in Madhya Pradesh State, India.
File location:- D:\shanti Rawat\shanti Rawat\Geological Data\TUNNEL-2\FINAL FILE\02. 03. TU-ER-JV-IB-FD-T2-GS- Tunnel-2.dwg
LEGEND LEGEND RVNL APPROVAL
STRENGTH INDEX
RQD
CORE RECOVERY DESCRIPTION APPROXIMATE UCS (MPa)
COMPLETED BORE HOLE OVERBURDEN WEAK ROCK 5 - 25
MEDIUM STRONG 25 - 50
STRONG ROCK 50 - 100
IN PROGRESS VERY STRONG 100 - 250
BLACK SOIL Design Consultant
Drawing Title
Released For
Revision
Drawing No.
PREPARED BY :- KM Sakshi