HAWA Commissioning Form
HAWA Commissioning Form
Commissioning
WARNING
Only qualified persons should conduct commissioning
CAUTION
Preliminary electrical and IT system checks such as connectivity,
hardware installation check, IT security by a competent person
NOTICE
Installation manual / Installer reference guide
This general commissioning checklist can be used as a guideline
and reporting template during the commissioning and hand-over
to the user.
For more detailed commissioning instructions, see the
Installation manual or the installer reference guide.
Date : .
Location : .
Hawa License ID : .
Hardware Data (Please list all hardware communication to provided HAWA System)
Description Type / Specification Remark
Pressure mBar
Opacity %
Dust (Particulate) mg/Nm3
O2 Correction
NOx mg/Nm3
SO2 mg/Nm3
Dust (Particulate) mg/Nm3
Report Menu Checklist Alarm Menu Checklist Sync Log Menu Checklist
Template Report Alarm function when trigger Sync Status
Periods setpoint is reached
Parameter & Units Telegram notification function Sync Failed Status
during alarm
Trending Menu Checklist SISPEK Menu Checklist
Parameter Selection Set Parameter SISPEK
Time Range Selection Check JSON Data
Time Interval Options Manual Sync
Auto Refresh Function Auto Sync
Trending view option Test Connection to SISPEK
Conclusions/User Notes
Signature
Vendor Client
PIC HAWA Engineer PT.